Loading…
Loading…
16 results • Latest
Laying of internal CC Roads and CC Drains Ward No 3 4 in Khanapur Municipality
Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2 MORD / 305 MORTH.
Laying of internal CC Roads and CC Drains Ward No 3 4 in Khanapur Municipality
Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2 MORD / 305 MORTH.
Laying of internal CC Roads and CC Drains in Ward No 9 10 in Khanapur Municipality
Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2 MORD / 305 MORTH.
Laying of internal CC Roads and CC Drains in Ward No 7 8 in Khanapur Municipality
Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2 MORD / 305 MORTH.
Laying of internal CC Roads and CC Drains in Ward No 5 6 in Khanapur Municipality
Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2 MORD / 305 MORTH.
STRENGTHENING OF ADDITIONAL INFRASTRUCTURE FACILITIES TO EXISTINVG KGBV BUILDING AT MANDAPALLY (V) PEMBI (M) IN NIRMAL DISTRICT UNDER NABARD RIDF XXIX
2 ACR's with Toilet Block -GF: Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and cost of overheads and contractors profit etc.,for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Manual Means.