Loading…
Loading…
110 results • Latest
Safe Deposit Locker Cabinets conforming to IS 5244 (V2) (Q2) (3 (3 ))
Safe Deposit Locker Cabinets conforming to IS 5244 (V2) (Q2) (3 (3 ))
PU floor re-coating work at the 765 kV GIS hall of POWERGRID Nizamabad Substation
SDF 2023-24- Balance work of Lingayath Community hall at Karegoan (V) of Pothangal (M) in Badswada Assembly Constituency in Nizamabad District Esst cost Rs 16.00 LAkhs
SDF- Construction of Shed at Shivalayam in Ethonda (V) of Kotagiri (M) Banswada Assembly Constituency in Nizamabad District Esst cost RS 15.00 LAkhs
SDF- Construction of General Function Hall at Ethonda (V) of Kotagiri (M) Banswada Assembly Constituency in Nizamabad District
Estimate for Removal of Un authourised Bund in Godavari Left Channel Downstream of SRSP Earth Dam
Repairs Estimate for Quality Control Laboratory of QC I Sub-Division No.1 of QC I Division No.4 Nizamabad District.
Laying of CC Road from Mallikarjuna Appartment Madhva nagar near and H.no.3-3-37/12/1, Hyderabad Road to Balaganagadhar house And Bhumesh Goud House to Pappanna House and Ramadevi venture entrance gate to Ep no PGA29/21 and House NO 1-51/30/3q to Ep no BCB 3/7 Bank Colony and H/o Cars to Hyderabad Road in Div No 04 of Zone II in Nizamabad Municipal Corporation
Laying of CC road from H.No 8-86 to 8-81/A/1 and H.no.8-258/2 to EP No PTIII A/1 at Arya Nagar in Div no 05 of Zone II in Nizamabad Municipal Corporation