Loading…
Loading…
726 results • Latest
Manpower Outsourcing Services - Fixed Remuneration - IT- Technical; Technical Assistant; High School or Diploma in Computer Application
Manpower Outsourcing Services - Fixed Remuneration - Others; Attendant; High School
Power Transformer, Oil immersed type (Q3) (3 (3 ))
AMC of Integrated Security and Surveillance System - Health Monitoring Solution for CCTV System, Event Video Surveillance, Parking Lots, Employee Safety; Comprehensive; Hardware; Consumables to be provided by Service Provider (included in the contrac..
Renovation of School Building of GMS Milangram under SD-II, CD, APWD, Diglipur
Interior modification of IMFL Shop at Rangat, Middle Andaman
Construction of retaining wall to protect APWD Inspection Bunglow, Diglipur at near side under SD-V, CD, APWD, Diglipur. Sw- Renovation of IEI and Commissioning of Air Conditioners
Extension of APWD Division Office Building under Maintenance Section SD-I, CD, APWD, Diglipur. Sw- SITC of 02 nos. Air Conditioners in APWD Division Office
Construction of Pressed Steel OHT at Subashgram Ward No.6 near NSV School under SD-V, CD, APWD, Diglipur
Construction of AWC along with chain link fancing at Basadeck under SD-II, CD, APWD, Diglipur. Sw- Providing IEI
Construction of new Anganwadi Center at Lamiyabay with chain link fencing under Sub Division-I, CD, APWD, Diglipur. Sw- Providing IEI
Construction of AWC along with chain link fencing at Swarajgram-II under SD-II, CD, APWD, Diglipur. Sw- Providing IEI
Construction of AWC along with chain link fancing at Shibpur-I under Durgapur Section SD-I, CD, APWD, Diglipur. Sw- Providing IEI
Construction of reservoir at Hathilevel 5.8 ML Capacity Phase-II. Sw - Allied works of connecting pipelines to existing WTP Shyamnagar
Repair of Govt. Primary School Prafullanagar BM. Sub Work - Renovation of IEI.
Replacement of G.I. pipeline in place of buried and damaged pipeline from Jaipur Source No. 18 and 10 to Harinagar under SD-III, Swadeshnagar
Renovation of 02 Nos. Classroom of Govt. Primary School, Korangnallah under Sub Division No. III, NACD, APWD, Mayabunder including IEI
Renovation of School Building of GSSS Govindapur under Badam Nallah Section, Sub Division No.III, Swadeshnagar, NACD, APWD, Mayabunder. Sub Work - Renovation of IEI.
REPAIR AND MAINT OF EXTERNAL WATER SUPPLY AND CONNECTED WORKS AT AERIAL BAY,DURGAPUR, SHIPUR ,LAXMIPUR AND MAYABUNDER UNDER GE(S) DIGLIPUR
Annual Maintenance of Streetlights contract (AMC) in all wards of Gram Panchayat Swadesh Nagar.
Construction of 01 No. Dug well - 6.00 mtr - dia at Budhnagar, Parnasala under Sec-II, SD-II, CD-I, APWD, Rangat.
The Gram Panchayat Dasarathpur invites e-Tender Notice under two bid systems from registered firms/ manufacturer, distributer, authorized dealer, registered co-operative societies, Bonafide suppliers etc. for Supply of Utensils
Construction of 01 No. Rain Water Harvesting Reservoir including Pump House, Pump and other allied structure near MGNREGA Pond under Sub Division No. I, NACD, APWD, Mayabunder
Collection and supplying of drinking water through water tanker fitted with water pump and water meter of required hose power and dia respectively from Panchawati Source or any other suitable water source to Filter bed at Sabari and also for the vari
Construction of Rain Water Harvesting Reservoir (Azadi ka Amrit Sarovar ) of Capacity 10.00 ML Near Zonal Lab at Tugapur No.7 Village under Sub Division No.II, Tugapur, NACD,APWD, Mayabunder
Construction of 01 No. Rain Water Harvesting Reservoir (Pond No.04) for a capacity 10.00ML including Pump House, Pump and PVC Fencing near Panighat Junction under Sub Division No. I, NACD, APWD, Mayabunder
Construction of 01 No. Rain Water Harvesting Reservoir (Pond No.03) for a capacity 10.00ML including laying of Pipelines near Panighat Junction under Sub Division No. I, NACD, APWD, Mayabunder
Multilayered Cross Laminated Sheets/Tarpaulins/Covers/Agricultural Filmsconformingto14611 (Q3)
AC Static Watthour Meters - Energy Meter (V2) as per IS 13779 (Q2) (3 (3 ))
Construction of 01 No. Rain Water Harvesting Reservoir (Pond No. 02) for a capacity of 10.00 ML including Pump House, Pump and PVC Fencing at back side of APWD Water Laboratory near Austin Bridge under SD-I, NACD, APWD, Mayabunder
Hiring of Boats - Country Boat; Less than 10 years; Without Air-Conditioning; 7-10 Persons; 2000; Outboard; Wood; Paddles, Rescue Life Jackets, First Aid Box, Fire Extinguisher; Service Provider
PROVISION OF PCC PATH FROM DSC LINE TO DESALINATION PLANT AT AERIAL BAY UNDER GE(S) DIGLIPUR
REPAIRS AND MAINTENANCE OF EXTERNAL ELECTRIC SUPPLY AND CONNECTED WORKS AT AERIAL BAY UNDER GE(S) DIGLIPUR
Construction of Toilet Block beside community Hall of Kalimandir at Nimbutala-01 under Gram Panchayat, Nimbutala.
Repair and Maintenance of CC Footpath from ATR to Sukh Bala house at Shantanu ward no. 02 under Gram Panchayat, Uttara.
Construction of Lodge at existing Shopping Complex at Danapur ward no.02 under Gram Panchayat, Pokhadera
Construction of Parking Place near the Ram Mandir at Duke Nagar ward No.01 under Gram Panchayat, Swadeshnagar.
Construction of Toe wall cum Drain from Thophil Toppo house to Konika Bhattacharya house at Govindapur-II under Gram Panchayat Basantipur.
Repair and Maintennace from main road to STS Colony with hand rail at Pokhadera ward No. 03 under Gram Panchayat, Pokhadera.
Construction of 02nd Floor Panchayat Shops over the existing Panchayat Shops at Atal Bihari Vajpayee Complex Rangat ward No. 12 under Gram Panchayat, Rangat.
Construction of Black Top Rural Road from R. Kritika land near APWD workshop to Rama Rani land at ward No. 07 under Gram Panchayat, Rangat.
Construction of both side Guard wall including earth filling at Foot bridge near Late Sudhir Das land at Govindapur-III under Gram Panchayat, Basantipur.
Renovation and extension of 21 Nos Gumties to Shopping Complex with double storey at Mayabunder Bazar under Gram Panchayat, Mayabunder.
Renovation of RCC Ring well near Government Middle School at Hanspuri village under Gram Panchayat, Chainpur.
Construction of 06 nos. Shop rooms near existing shopping complex at Gram Panchayat, Kadamtala at ward No. 08 under Gram Panchayat, Kadamtala
Repair and Maintenenace of Panchayat Bhawan (including doors, windows and roof etc) and Painting of Panchayat Bhawan under Gram Panchayat, Parnashala.
Renovation of Rural Road from Somlu house to Birsa Munda Ground at ward no.03 under Gram Panchayat, Urmilapur length 575.00mtr.
Construction of RCC Culvert in between the Nallah of Shri. Gopal Halder and Shri. Bhabananda Baroi at Tugapur ward No. 03 under Gram Panchayat, Pahalgaon
At least one line man wireman and a helper, one of which should have preferable minimum qualification of ITI in electrical (02 years)
Construction of P.S. Overhead tank for 2.00 Lakhs Ltrs. Capacity, including pipeline at Karmatang-X under SD-I, NACD, APWD, Mayabunder