Loading…
Loading…
2,204 results • Recent activity
Imp./Dev. of drainage system one side by pdg. B/W, Cement Plaster, RCC culverts, Precast Slabs etc. from H.no. H1 to dispensary, Dispensary to H19, H19 to H14 in H-Block, Ashok vihar Phase-1 under ward 64/KPZ.
Reconstruction of lane by relaying RMC (M-25) Paver block, B/agg. Etc. from H. No. B-3/84 to B-3/89 in B-3 Block Keshav Puram, under ward No. 64/KPZ.
Imp. Dev. of Park Walkway by Pdg. Paver Block, Steel Work etc. Near H.No.D-80 Ashok Vihar Phase -I Under Ward No.64/KPZ.
Reconstruction of Back lane by relaying RMC (M-25) from H.No.B-83 to H.No.B-70 in B-Block Ashok Vihar Ph-I ward No.64/KPZ.
Reconstruction of Back lane by relaying RMC(M-25) from H. No. H-88 to H-95 in H Block Ashok Vihar, Ph-I under Ward No. 64/KPZ.
Imp./Dev. of Lane by Pdg. RMC M25, B/Agg. etc. from H.no. A-2/119 to A-2/132, A-2/132 to TPDDL, TPDDL to A-2/113, A-2/113 to A-2/119, A-2/105 to A-108 and near A-2/129 in A-2 Block Keshav Puram under ward 64/KPZ