Loading…
Loading…
6 results • Latest
OFFICE EQUIPMENTS
OFFICE EQUIPMENTS
OFFICE STATIONARY
OFFICE STATIONARY
CONSTRUCTION/IMPROVEMENT OF LACHUNG-YUMTHANG-ZADONG ROAD (PART OF NH-310A) DESIGN CHAINAGE FROM KM 52.808 TO KM 81.203 (NET LENGTH 28.395 KM) FROM CL-9 TO NHDL WITH PAVED SHOULDER SPECIFICATIONS UNDER PROJECT SWASTIK IN SIKKIM STATE THROUGH EPC MODE
Repair rehabilitation of 123M span PSC bridge over Rangrang khola at km 52.500 along nh 310A, Mangan district in the state of Sikkim
Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with epoxy complete as per Technical specification
SUPPLY AND STACKING OF CRUSHED STONE AGGREGATES OF VARIOUS SIZES AND STONE DUST DRY SAND FOR BC 40 MM INCLUDING CORRECTION WORK AT KM 9 PT 00 HMP SITE ON LACHUNG ZEKUPHYAK KATAO ROAD FOR RESURFACING WORKS OF FY 2026 27 BETWEEN KM 0 PT 00 AND 1 PT 08
MATERIAL FOR BC WORKS TO BE SUPPLIED AT KM 9.00 (HMP SITE) ON LACHUNG-ZEKUPHYAK-KATAO ROAD
Construction and Maintenance of Intermediate Lane with paved Shoulder of Mangan Bazar to D.A.C.-Mangan- Dr. Lobzang Tenzing Marg- from Km 0.000 to Km 2.036 Length- 2.036 Km, in the State of Sikkim.
We hereby submit our BID and offer a BID Price Rs