Loading…
Loading…
753 results • Latest
Improvement of Electrical Installations and Provision of Air Conditioners , CCTV camera at half portion of Ground Floor M and CW Center Jahawar Nagar for opening of Aroygaya Mandir in ward No 69 KPZ Kamla Nagar.
Provision of Air conditioners, UPS and electrical installations proposed for upgradation of M andCW centre E block Shakurpur into AAM in ward no 62 under KPZ.
Provision of lighting arrangements at MPL Park opp. H.no-178 AC Block, MPL Park opp H.no-87 AC Block , MPL Park opp H.no- 102 AC Block , MPL Park opp h.no- 107, Mpl park opp H.no-81, Mpl Park H.no-80 Nehru park, Mpl Park opp H.no-66 AC Block , Mpl
Imp. of Electrical installations and Provisions of AC in Indira Gandhi Polyclinic in Shakurpur, ward no 62 under KPZ.
Provision of lighting arrangements at MPL Park opp. H.no-5A BB East Block, MPL Park opp H.no-97 A BC Block (East), Mpl Park opp H.no-113A BC (East)Block, Mpl Park opp H.no-227A BC (East) Block , Central park BC (East) Block and MPL Park opp H.no-
Provision of lighting arrangements at MPL Park Vaishali vatika near Rukmini Devi Public School pitampura in AC- 14 under Keshav Puram zone
Provision of Street lights on Existing pole in various blocks of AC-14 Shalimar bagh Under Keshav Puram Zone
Improvement of EI and Provision of ACs, Water Purifier, Water Cooler , CCTV etc. as required. By MH Haiderpur for the Establishment of AyAM in Ward no- 55,
Upgradation of EI and other allied works in MCD Schools in BB Block, BG Block, U and V Block, AB Block, AC Block, AG Block, AK Block, BK-2 Block, BT Block Shalimar Bagh ward-56 in Shalimar Bagh Constituency AC-14 under KPZ
Upgradation of EI and other allied works in MCD Schools - Haiderpur (Girls), Haiderpur (Boys), JJ Cly Haiderpur, Shalimar Village, Sahipur Village in ward-55 in Shalimar Bagh Constituency AC-14 under KPZ.
Provision of lighting arrangement at MPl Park Shiv Vatika BFH Block Shalimar bagh in AC-14 under Keshav Puram Zone
Imp./Dev. of Road and drainage system from H.No. K-10 to Gali No. 7 New Chandrawal Village by providing RMC in Ward No. 69/KPZ, Kamla Nagar.
Imp./Dev. of 7 Block Roop Nagar park by Providing Boundary wall and Gate in Ward No. 69/KPZ Kamla Nagar
Provision of lighting arrangement in mpl. Park near house no 16/1 Shakti nagar ,Flat no 129 SFS, 146 A SFS, 80 LIG Gulabi bagh and Sindhora kalan park near project office in ward no 69 under Keshav puram zone.
Provision of lighting arrangements at Central Park TP Block , MPL Park near H.no-118 TP Block and Central Park KP Block pitampura in AC- 14 under Keshav Puram zone
Provision of lighting arrangement with Led Lights at MPL Park CC Block Shalimar Bagh , MPL Park Near CB- 30C , MPL Park near CB- 50A and MPL Park near CB- 16A Shalimar bagh in AC- 14 under Keshav Puram zone
Fourier Transform Infra Red (FTIR) Spectrometer (Q2) (3 (3 ))
Imp./Dev. of Road, Drainage System and Footpath from H.No. D-176 to H.No. D-163 Kamla Nagar in Ward No. 69/KPZ Kamla Nagar.
Imp./Dev. of Road and Drainage System from H.No. 109A to 121A Gulabi Bagh in Ward 69/KPZ Kamla Nagar.
Imp./Dev. of Road and Drainage System from H.No. 12/01 to Pahari Wala Park Shakti Nagar in Ward No. 69/KPZ Kamla Nagar.
Imp./Dev. of Road and Drainage System from H.No. B-5/1 to B-4A/9 and from H.No. B-4A/9 to B-4/7 Rana Pratap Bagh in Ward No. 69/KPZ kamla Nagar.
Imp./Dev. of Road and Drainage System from H.No. 11/09 to H.No. 11/11 and H.No. 11/08 to H.No. 11/09 Shakti Nagar in Ward No. 69/KPZ Kamla Nagar.
Imp./Dev. of Road and Drainage System from H.No. 7390 to H.No. 7364 and adjoining lane of H.No. 7340/1 and 7314 Prem Nagar in Ward No. 69/KPZ Kamla Nagar.
Construction of Modern Toilet in E-Block Nursary School (Near Double Storey School Kamla Nagar) in Ward No. 69/KPZ, Kamla Nagar.
Imp./Dev. Of Road from H.No. D-13A/20 to H.No. H-3/5 by Pdg. RMC in Model Town-II in Ward No. 68/KPZ.
Spirometer (V2) (Q2) MSE Exemption for Turnover Yes | Complete Startup Exemption for Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 10 Bid Number : GEM/2025/B/6690820 Dated : 23-10-2025 Bid Document 1/9 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 5 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 472000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 62 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Director Vallabhbhai Patel Chest Institute, Deputy Registrar Office, Administrative Block, 3rd Floor, M.S. Building, University of Delhi, Delhi–110007 (Director, Vpci)
Imp./Dev. of Road and drainage system by pdg. RMC from H. No. F-1/9 to H.No. F-1/23 Model Town in Ward No 68/KPZ, Model Town.
Unbranded LLDPE 20 Litre Foot Operated Bio-Medical Waste Collection Bin Brand: NA (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687705929893 dt.24/08/2026)
PARADYNE Line Interactive UPS with AVR of Rating 1.0 KVA With Warranty of 1 Year Brand: PARADYNE (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687761199675 dt.20/0
(PH NO.:20024) RITONAVIR 50 MG + LOPINAVIR 200 MG TAB Make: RITOCOM
Imp. Dev. of drainage system near Raghunath Mandir and along park at BH-block, Shalimar Bagh, Ward No.-56/KPZ
iimprovement and Development of drainage system from 462 to 453, 402 and back lane of H.No. 15 to 21 at BH-East Block, Shalimar Bagh, Ward No. 56/KPZ
Imp./Dev. of backlane from H.No. B-3/1 to B-3/13 and B-3/65 to B-3/70 Ashok vihar Phase-II by pdg. RMC in ward 65/KPZ.
Imp./Dev. of Road and Drainage System from H.No. 17/1 to H.No. 17/12 and H.No. 17/12 to H.No. 20/72 Shakti Nagar in Ward No. 69/KPZ Kamla Nagar.
Imp./ Dev. of lanes from H.No. 495 to 512 in B-Block Bunkar Colony Ward No. 66, Wazirpur, AC-17.
Imp. Dev. of Lane by Pdg. RMC from H.No. 240 to 239 at Haiderpur Village, Ward-55/KPZ
Imp./ Dev. of lane from Block no. 5 house no. 6A to 10A in Pocket B Phase III in Ward 66 KPZ, AC-17.
Imp./Dev. of Back Lane and Drainage System from H.No. 2/38 to H.No. 2/40, H.No. 2/48 to H.No. 2/51, H.No. 2/44 to H.No. 2/51, H.No. 2/45 to H.No. 2/52, H.No. 2/52 to H.No. 2/54 and H.No. 2/1 to 2/4 Roop Nagar in Ward No. 69/KPZ Kamla Nagar.
Imp./ Dev. of road and drainage system from Nursary to 27/28 Shakti Nagar in Ward No. 69/KPZ, Kamla Nagar.
Imp./ Dev. of road and drainage system from ESI Dispensary to 15/5 (Maternity Centre) Shakti Nagar in Ward No. 69/KPZ, Kamla Nagar.
Rucksack (30 Ltrs Capacity) (V2) (Q2) (3 (3 ))
Imp./Dev. of Side Berms and Drainage System from H.No. B-1 to Pump House Rana Pratap Bagh in Ward No. 69/KPZ Kamla Nagar.
Imp./Dev. of Park in front of H.No. 95A Gulabi Bagh in Ward No. 69/KPZ Kamla Nagar.
Imp./Dev. of Back Lane and Drainage System from H.No. 2/35 to H.No. 2/37, H.No. 2/67 to H.No. 2/72, H.No. 2/73 to H.No. 2/78 and H.No. 2/5 to H.No. 2/5 Roop Nagar in Ward No. 69/KPZ Kamla Nagar.
Imp./Dev. of Back Lane and Drainage System from H.No. 24/1 to H.No. 24/9 and H.No. 24/9 to H.No. 24/10 Shakti Nagar in Ward No. 69/KPZ kamla Nagar.
Imp./Dev. of Road and Drainage System from H.No. 49A to 54A Gulabi Bagh in Ward No. 69/KPZ Kamla Nagar.
Imp./Dev. of Road and Drainage System from H.No. 2/30 to H.No. 2/63 and from H.No. 2/63 to 2/101 Roop Nagar in Ward No. 69/KPZ Kamla Nagar.
Imp./Dev. of Backlane and Drainage System from H.No. 30/1 to H.No. 30/11 Shakti Nagar in Ward No. 69/KPZ kamla Nagar.
Imp./Dev. of Drainage System at D-20 Kamla Nagar , D-69 Kamla Nagar , D-8 Kamla Nagar , 100UB Jawahar Nagar , 11/11 Shakti Nagar and MCD Flat Kamla Nagar in Ward 69/KPZ Kamla Nagar.
Imp./Dev. of Back Lane from H.No. B-5/4 to B-5/1 Rana Pratap Bagh in Ward No. 69/KPZ Kamla Nagar.