Loading…
Loading…
228 results • Latest
Providing Iron Scaffolding to Main Temple for Maha Kumba Abhishekam-2026.
Providing, erecting, maintaining and dismantling floor-wise steel scaffolding for unsupported height up to 3.66 m using approved quality MS/GI steel pipes, adjustable jack props, steel centering/base plates, clamps and couplers, including racings, ledgers, transoms, joint pins, working platforms with Wooden planks / chequered plates, steps / ladder access leading to platform with handrails, guard rails and toe boards, erected with clamp fixing system, complete, ensuring the entire arrangement is tight, stable, plumb and safe, as directed by Engineer-in-Charge. Including Cost of all materials, labour for erection, maintenance and dismantling, tools & tackles, shifting and repositioning, safety arrangements, leads & lifts, overheads and contractor’s profit — complete in all respects. (Ground floor 1st stage)
Desilting of Major outfall drain from Meenakshi Nagar culvert - kandrika Junction - Gunadala Railway, Kandrika Junction IRR North side - 33 vents & Konakalla Steels to Gunadala Track East Side in AE-13 Section (By Mechanical Means)
Engaing Proclainer with capacity of shovel 0.85Cum of 110HP for removing wet silt from drain on hire basis including fuel charges, wages of driver and helper and all operational charges etc., complete and as directed by the departmental authorities. Conditions: Wet silt should be remove bottom of the drain with cross bunds with sand bags and bailing out of the water then the removing of the silt upto bottom of the drain and photos are to be submitted for every 50mts stretch to show the bottom of the drain.
Desilting of outfall drain to Excel Plant road from American Hospital road to Ajithsingh nagar ROB along Railway Track in 58th & 59th Divisions, Desilting of outfall drain to west side of Disney Land from G Block to Disneyland road culvert adjacent to Railway track in 60th Division and Desilting of outfall drain to North Side of Disneyland road from Masjid to C Block rain of 60th Division in AE-7 Section. (by manual and mechanical means)
Engaing Proclainer with capacity of shovel 0.50Cum of 75HP for removing wet silt from drain on hire basis including fuel charges, wages of driver and helper and all operational charges etc., complete and as directed by the departmental authorities. Conditions: Wet silt should be remove bottom of the drain with cross bunds with sand bags and bailing out of the water then the removing of the silt upto bottom of the drain and photos are to be submitted for every 50mts stretch to show the bottom of the drain.
Desilting of outfall drain in GVR Nagar to Davu Buchaiah Colony and Shiridi Sai Nagar in 1st and 30th Divisions (By manual Means) in Circle-II Area for the Year 2026
Removal of wet silt and sludge by manual means from sullage drains with aid of baskets and vessels. (LAB-00676) Conditions: Wet silt should be remove bottom of the drain with cross bunds with sand bags and bailing out of the water then the removing of the silt upto bottom of the drain and photos are to be submitted for every 50mts stretch to show the bottom of the drain.
Desilting of outfall drain to south side of Nunna Main Road from Singh Nagar RUB to R&B Culvert at KAndrika in 58th,59th & 61st Divisions, Desilting of outfall drain from Pipula Road Junction to American Hospital Road along Excel Plant road in 58th Division and Desilting of Outfall drain from Pipula Road Junction to Disneyland Gate in 60th,61st Division in AE-7 Section (By manual and mechanical means) for Summer Action Plan-2026
Removal of wet silt and sludge by manual means from sullage drains with aid of baskets and vessels. (LAB-00676) Conditions: Wet silt should be remove bottom of the drain with cross bunds with sand bags and bailing out of the water then the removing of the silt upto bottom of the drain and photos are to be submitted for every 50mts stretch to show the bottom of the drain.
Desilting of outfall drain from Pipula Road Junction to Sai Baba Temple along IRR Jakkampudi, Andhra Praba Colony in 58th Division and Desilting of outfall drain from Kanaka Durga Nagar Junction to Budameru along Andhra Praba Colony, bharathamatha Colony in 58th Division in AE-7 Section (By manual & Mechanical means) for summer action plan-2026
Engaing Proclainer with capacity of shovel 0.50Cum of 75HP for removing wet silt from drain on hire basis including fuel charges, wages of driver and helper and all operational charges etc., complete and as directed by the departmental authorities. Conditions: Wet silt should be remove bottom of the drain with cross bunds with sand bags and bailing out of the water then the removing of the silt upto bottom of the drain and photos are to be submitted for every 50mts stretch to show the bottom of the drain.