Loading…
Loading…
479 results • Recent activity
Household Refrigerating Appliances as per IS 17550 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Natural Light Pipe Arrangement on Roof For Automobile Carrier in Assembled Condition as per RDSO Drg. No. RDSO/CG/DRG/20012 item No. 1 to 7
SET OF ITEMS REQUIRED FOR 3 - PHASE LOCO WHEEL FLOATING ARRANGEMENT SET CONSIST OF 22 ITEMS IN 196 NOS.. (1) HALLOW BLOCK ASSEMBLY AS PER ELS/LGD DRG No. C/ELS/LGD/EX.FTG/2/18, (REF 1 TO 8) [ALL 08 I
4 core 4 sqmm Cu armoured cable, 3 core 6 sqmm Cu, 3.5 core 25 sqmm Al, 10 sqmm Cu earthing wire, 4SQMM Cu flexible multilead single core, 10 SQMM Cu flexible multilead single cor, 3 core 2.5 sqmm Cu
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 km x 320 hours; Outstation
MULTI COLOUR PRS TICKETS (WITHOUT ADVERTISEMENT) AS PER SPECIFICATION ATTACHED (ANNEXURE - A)