Loading…
Loading…
253 results • Latest
Drainage Work
Air Circulator Type Electric Fan and Regulator (V2) Conforming To IS 2997 (Q2)
Supply Installation and Commissioning of Bamboo machineries at the site at Palakkad
Surface dressing,granular sub base,concrete 1 2 4,Quaru muck filling,name board
Surface dressing,granular sub base,concrete 1 2 4,Quaru muck filling,name board
Shoranur-Calicut: TSR (P) 58.324 Km (56.000 Km by SQRS and 2.324 Km by manual) with 60 Kg wider base PSC sleepers with density 1660 Nos/Km between Km 579.200-592.834 (Dn line) and 609.210 to 653.900 (Up line) including SQRS siding.
Shoranur-Nilambur section: Widening of cess and Standardization of embankment work at scattered locations between Km 2.600-65.370 (SL).
Divisional Engineer/East/Palakkad Jurisdiction - Raising of PF to high level PF at stations Pallipuram PF-2, Tirunavaya PF-2/3 & Ottapalam-PF No 1 & allied works.
ELECTRIFICATION WORKS TO ODUVANGAD FAMILY WELLNESS CENTRE BUILDING CONSTRUCTION