Loading…
Loading…
373 results • Latest
HEAD LAMP IN FOG to Part no. 131311065000, Development cost for HEAD LAMP IN FOG to Part no. 131311065000, WATER TIGHT ASYMMETRIC HEAD LAMP D160 to Part no. 131311026000, Development cost for WATER TIGHT ASYMMETRIC HEAD LAMP D160 to Part no. 131311026000
NAME OF WORK:- Shoranur- Mangalore section - (1) Proposed re-construction of Br. No. 829 (pro. DN line) at km 603/700-800 as 3x12.2m clear span PSC slab between Pallippuram and Kuttippuram stations (2) Proposed re-construction of Br. No. 1177 DN at KM 822/300-500 as 6x12.2m effective span PSC slab between Kanhangad and Kotikulam stations (3) Proposed re-construction of Br. No. 1188 (DN line) at KM827/500-700 as 4x12.2m clear span PSC I girder & slab between Thalassery & Etakkot stations including earthwork & blanketing for formation on approaches, collection of ballast, linking of track and other miscellaneous works in Palakkad Division of Southern Railway under DyCE/CN-I/TVC.
Shoranur-Mangaluru section: (1) Proposed re-construction of Br. No. 904 (proposed DN line) at km 636/100-300 as 5x18.0m effective span PSC I girder & slab and 1x6.1m clear span PSC slab between Tanur & Parappanangadi stations (2) Proposed reconstruction of Br. No. 1085 (proposed UP line) at KM 735/000-200 as 3x18m effective span PSC I girder & slab between Thalassery & Etakkot stations including earthwork & blanketing for formation on approaches, collection of ballast, linking of track and other miscellaneous works in Palakkad Division of Southern Railway under DyCE/CN-I/TVC.
KWARevenueHiring of 1 Number of Vehicle having Cubic Capacity below1500CC witha Driver having Valid Driving License for the use of KWA PH SectionThrithalaFor 6monthsKWA RevenueGeneral Civil Work
Design, Engineering, Manufacture, Factory Testing, Supply, Transportation, Supervision of Installation and Commissioning of 22kV indoor VCB switchgear panel with 3 incomers, 2 bus couplers and 15 feeders for 220kV SS Palakkad under Transmission North
Estimate for the cost of Vista Clearance (31 Ha.) in various areas in Akathethara, Kottekkad, Pudussery (North), Pudussery (South) and Walayar Section under Walayar Range during 2026- 27