Loading…
Loading…
376 results • Latest
Preparation and submission of the Final Mine Closure Plan, obtaining approval from the IBM, and incorporating approved modifications into the Mining Plan in accordance with IBM requirements and approvals for Pandarathu Limestone Mines of MCL.
Signalling interlocking works in connection with modification in interlocking at MNUR and Track Machine siding at OTP station and Signalling Modifications, Assets Renewal & system improvements in stations over Palakkad Division.
Assistant Divisional Engineer/Palakkad section:- Proposed drainage improvement works on existing subways no. 258A, 10 A, 25, 45 A, 66 A, 83 A, 89 A & 115 A.
Zonal contract for execution of bridge works and supply of materials in Palakkad division for a period of 1 year from 01/07/2026-30/06/2027- Zone E V-Bridge works under Assistant Divisional Engineer/Mangalore section.
Zonal contract for execution of bridge works and supply of materials in Palakkad division for a period of 1 year from 01/07/2026-30/06/2027 - Zone E IV-Bridge Works under Assistant Divisional Engineer/Kannur section.
Zonal contract for execution of bridge works and supply of materials in Palakkad division for a period of 1 year from 01/07/2026-30/06/2027 - Zone E III-Bridge works under Assistant Divisional Engineer/Bridges (Feroke-Mangaluru Central & Mangaluru Central-Panambur section).