Loading…
Loading…
5,320 results • Latest
Annual Plan-Thachanattukara GP 2026-27 Naduvilathani poovathani road rennovation in ward 18 (pro.53)
Manpower Outsourcing Services - Man-days based - Housekeeping and document upkeeping; Unskilled; Housekeeping and document upkeeping
SUPPLY OF BOX HEAD FOR BUCKET CARRIAGE 2 PART
SRPHC82107145-INSULIN GLARGINE 100 I.U/ML, 3 ML CARTRIDGE UNIT:CART Firm's offer: Glaritus 100IU/ml-Cartridge
SRPHC82025140-POSACONAZOLE 100 MG TAB Offered brand POSANAT MFG By NATCO PHARMA LIMITED-HYDERABAD
SRPHC82107120-INSULIN ASPART 100 I.U/ML 3 ML CARTRIDGE UNIT:CART Firm's offer: Fiasp Penfill
SRPHC82050290-PROPRANOLOL 10 MG TAB MAKE BRAND :- CIPLAR 10 TABLETS MFG BY CIPLA LIMITED-MUMBAI
SRPHC82049025-DILTIAZEM 30 MG TAB MAKE BRAND :- DITI 30 TAB MFG BY:- SKYMAP PHARMACEUTICALS PRIVATE LIMITED-ROORKEE
THE ELECTRICAL WORKS ASSOCIATED WITH THE INSTALLATION OF 500 KVA DIESEL GENERATOR, PREPARATION OF DRAWINGS AND APPROVAL FROM ELECETRICAL INSPECTORATE AND ALLIED WORKS AT MILMA PALAKKAD DAIRY
Annual Plan-Annual Plan-2024-25, Proj No-64,-KARAKUNNU PANTHRALA GOTHAMB ROAD RETARING SIDE PROTECTION IN WARD -7 -General Civil Work
Annual Plan-Thrikkalangode GP Annual Plan 2024-25, Prj No.584/25-Elayedathpadi Health Centre Road Side Protection and Reconcreting in Ward 20-584/25-General Civil Work
Annual Plan-Thrikkalangode GP Annual Plan 2024-25, Prj No.568-Valliyankavu Ottuli Road Bridge Maintanance - ward 23-General Civil Work
Polycarbonate Anti bird Disc with fasteners and silicon ring for Stay and Bracket insulator as per RDSO Drawing No. TI/DRG/OHE/ABD/RDSO/00000/19/0 - Rev 2 and RDSO Latest Maintenance Instruction No.TI
STAINLESS STEEL FOLDABLE BOTTLE HOLDER TO DRG NO. ICF/STD-6-4-018, ALT. j/3
80 W LED FLOOD LIGHT WITH LUMINAIRE SYSTEM EFFICIENCY=100 (MINIMUM), COLOUR TEMPERATURE OF (6000+/-500)K OR COOL WHITE, WITH DIE CAST ALUMINIUM HOUSING & TOUGHENED GLASS COVER, IP66 SUITABLE TO WORK O
VKL HAND TOOL KIT - 512ZZ00572
FLAP RH - 130965051564, FLAP LH
Independent Engineer Services during Operation and Maintenance of 6-laning of Vadakkanchery to Thrissur section of NH-544 including Kuthiran Tunnel from Design Ch.236.135 to Ch.264.490 the State of Kerala under NHDP Phase II on DBFOT(Toll) basis
HEX HD SCREW M 12 X 35 - 106509141222
SUPPLY OF GRATE PLATE
SUPPLY OF CONVEYOR BELT NYLON 800MM WIDTH
SUPPLY OF SPECIAL STEEL CORD BELT 550MM FOR BELT BUCKET ELEVATOR
MLA-SDF-CWSS to Nallepilly,Perumatty,Pattanchery and Elapully Grama Panchayaths - Karumbayankode -Supplying and Laying Distribution Main at Karumbayankode in Elapully Grama Panchayath-General Civil Work
MLA - SDF - CWSS to Nallepilly,Perumatty,Pattanchery and Elapully Grama Panchayaths - Ozhivupara - Supplying and Laying Distribution Main at Ozhivupara in Nallepilly Grama Panchayath - General Civil Work
DEPOSIT-Deposit Work-2023 - Kozhinjampara Grama Panchayath-Public tap Disconnection in Various Wards-General Civil Work
DEPOSIT - Jilla Panchayath Deposit Work - 2023-24-Providing Water connection to GHS Thiruvazhiyad and Providing internal pipe line extension at the school premise in Ayilur Grama Panchayath (Proj.No.839/24) - Pipeline Work
MLA-SDF-SDF-MLA - 2025-26 -Providing distribution network and FHTCs in ward No.10 at Alamkadavu Canal side in Nallepilly Grama Panchayath-General Civil Work
DEPOSIT-Ayilur Gramapanchayath - 2025-2026 - Providing water connection to Veterinary Dispensary Kairady -Project No 234/25-Providing water connection-Pipeline Work
O and M - Water Supply Schemes-Replacing old GI pipe at Nellikattuparambu, Nemmara Gramapanchayath-Replacing with 80mm GI pipe-Pipeline Work
GENERAL-Maintenance work-CWSS to Nemmara Ayiloor Melarcode-PMGSY- Repairing damaged pipeline due to road works at Payyankode Veezhli Kanthalam road-Replacing damaged pipeline-Pipeline Work
DEPOSIT- Ayilur gramapancahayth deposit work 2023-24-Block Panchayath Deposit Work 2023-24 - Pipe line Extension at Thiruvazhiyad, Kozhikkad, Idappadam, Gandhinagar Colony, Cheethavu and Chattappara
END MILL HSS SHORT ROUGHNING ONLY PARALLEL SHANK DIAMETER: 12 MM 8% COBALT MAKE: ADDISON/YG1/TOTEM, END MILL HSS SHORT ROUGH PARALLEL SHANK DIAMETER: 6 MM 8% COBALT MAKE: ADDISON/YG1/TOTEM, END MILL HSS SHORT ROUGH PARALLEL SHANK DIAMETER: 14 MM 8% COBALT MAKE: ADDISON/YG1/TOTEM, END MILL HSS SHORT ROUGH PARALLEL SHANK DIAMETER: 20 MM 8% COBALT MAKE: ADDISON/YG1/TOTEM
High Silica Locomotive sand (90% minimum), free from clay, salt, loams,mica and other foreign materials conforming to AAR spec. No. M-916-51(Revised 1994) duly cleaned, sieved,dried and packed in 10 k
Paint Aluminium for General Purpose in Dual Container to IS :2339/2013 (RA - 2018) & ICF /MD/spec.-052 issue status 2 Rev.01 Packing Condition- Packed in20 liters New, Sound and Non-Returnable MS drum
Supply and Installation of AEROSOL fire detection & suppression system cartridge minimum 40 GM (1No) provided in Lift Distribution Board in line with technical parameters as per Annexure G1 of RDSO Sp
Annual Plan-2024-25 of Thrikkalangode GP,Proj No-214/25,AMAYUR ROAD CHERUPALLI KAMMADAJIPPADI ROAD RETARING IN WARD 4-Proj No-214/25-General Civil Work ( Re-Tender )
Annual Plan-Thrikkalangode GP Project No.702/25 Hajiyarppadi Eledathupadi Road Re-tarring Ward 192021 - General Civil Work-General Civil Work
Annual Plan-Thrikkalangode GP Annual Plan 2024-25, Prj No.695/25-Cheenikkal Kandalappatta Road Retarring Ward 3 -695/25-General Civil Work
GENERAL-Monsoon Prepardeness 2026- Clearing obstruction and bund formation in Kooliyad Thodu in Erimayur Grama Panchayath in Palakkad District-General Civil Work
Annual Maintenance of Various Works of CWSS to Mannur Mankara and Keralassery under PH Section Ottappalam for the Year 2026 27
SUPPLY OF KILN PREHEATER FIRST STAGE CYCLONE IMMERSION TUBE
Koppam Gramapanchayath 2025-26 Dhanalakshmi erayur Kshethram road Renovation-Project no-371/26
SUPPLY OF PCP 001 ASSY
SUPPLY OF DIAPHRAGM VA3
SUPPLY OF HARDWOOD RAILWAY SLEEPERS
MLA-SDF-TARUR LAC-BUS STAND B U I L D I N G C O N S T R U C T I O N COMPLETION IN VADAKKENCHERY GP
GENERAL-LAC ADS- Nemmara LAC 2024- 25- Electrification of Alampallam Anganavadi in Ayiloor GP-Electrification
Koppam Gramapanchayath 2025-26 WARD 17 MANJAKUNNU ROAD RENOVATION -79/26
SUPPLY OF WIRE ROPE STEEL UNGALVANISED 40MM
Annual Plan PRO NO 81/26-27 Kalikulambu kannamkulam road concreate At Kizhakkencherry GP