Loading
Loading…
Loading…
5,035 results • Latest
GENERAL FDR 2025 26 Reconstruction of Collapsed Retaining wall at Pampadi Peringottukurussi road Chainage Between 4.900 to 6.100 CD works-Genera
Annual Plan-Peruvemba GP 208/2025-26 -Completion of Palathully Water Tank.
Annual Plan-Peruvemba GP 58/2025-26 - Set Up of Record room as a part of ISOCertification
110 mm and 150mm dia Bore Well Construction at 8 various sites (Thachanattukara GP,Mundur GP,Vallapuzha GP) in Palakkad District Under Deposit Scheme 2025-26
Annual Plan-Peruvemba GP 206/2025-26 -Raram road culvert Punarudharanam.
150mm dia Bore Well Construction at 3 various sites(PAZHATHARA,CHC NENMARA AND KALLANAKKARA) in Palakkad District Under Deposit Scheme 2025-26