Loading…
Loading…
1,952 results • Latest
Improvement of Gorhe Fata to S.H.34 Road M.D.R.43 Km. 15/600 to 16/600, Taluka-Wada, District-Palghar.
Construction of Paver Block At. Dolhara, Taluka-Mokhada, District-Palghar.
M - Seal as per IS 9197 (Q3)
Reconstruction of RR masonry boundary wall at SWMF, NRB,BARC,Tarapur
Camerafor CCTV System (V3) (Q2)
Dental X-Ray Machine (V2) (Q2)
SS COUPLING HOUSING, PART NO. 1 OF GE (VICTAULIC GROOVED END) COUPLING OF SIZE 50 MM NB X 60.3 MM OD, BOLT & NUT, PART NO. 4 & 5 OF GE (VICTAULIC GROOVED END) COUPLING OF SIZE 50 MM NB X 60.3 MM OD ( 60 set ), SS COUPLING HOUSING, PART NO. 1 FOR GE (VICTAULIC GROOVED END) COUPLING OF SIZE 80 MM NB X88.9 MM OD, BOLT & NUT, PART NO. 4 & 5 FOR GE (VICTAULIC GROOVED END) COUPLING OF SIZE 80 MM NB X 88.9 MM OD ( 60 set )
Construction of bandhara at Barode Pareti Nalyawar Taluka Jawahar Dist Palghar
Construction of civil structure of Dyke and RCC pad with allied civil works
Maintenance of civil structure in R and WM plants
Construction of new shed above existing battery abcd
New Construction of Dongar Pada Smashan Bhoomi Virar VVCMC.
Structural Repair and Non-destructive testing of 120 meter high RCC stack at PREFRE1 NRB BARC Tarapur
Internal painting work of residential flats and vacant flats in BARC Staff Colony, Tarapur for the year 2026-2028.
Construction of New Anganwadi Building At Motha Medha (V.P.Kortad) Tal. Jawhar, Dist. Palghar
Construction of New Anganwadi Center Building At Kondgaon Vilshet-Dongaripada Tal. vikramgad, Dist.Palghar.
Construction of New Anganwadi Center Building At- chinchghar aapti bu gahalepada Tal. vikramgad, Dist.Palghar.
Spectroscopic Portable Radiation Monitor capable of detecting Gamma and Neutron radiation
Construction of New Anganwadi Center Building At- chinchghar aapti bu Vajepada Tal. vikramgad, Dist.Palghar.
Construction of New Anganwadi Center Building At- Moh Bu. Kartipada Tal. vikramgad, Dist.Palghar.
Fabrication, Assembly, Testing of SS Rod and rentention support as per attached drawings and specifications.Quantity 2 Nos.
valves and Spares of Venus make Model
Construction of New Anganwadi Center Building At Hattipada (V.P.Udhale-Wakadpada) Tal. Mokhada, Dist.Palghar.
Construction Of Minor Bridge On Nagle Divekarpada To Phanaspada Road VR 358 at Km 0/300 Taluka-Vasai, District-Palghar.
Design, fabrication, supply, installation, testing and commissioning of passenger lift and dumbwaiter lift at new canteen at INRPO complex, Tarapur.
Pneumatic piping arrangement with double ferrule fittings for Air spring. Consists of following items as per ICF Drg. No. LGS/EOG/ASR-3-2-009 Alt b. 1) Male elbow connector 1 OD X 3/4 BSPT(M) As per I
One Coach Set of Brake System Pipe Fitting Items (Single Ferrule Type) consisting of 22 mm OD Run Tee, 22 OD Wire Swivel Elbow, 3/4" BSPT(M) 22 OD Connector and 22 mm Swivel Bulkhead Union, conformin
Male Connector 1" OD X 3/4" BSPT. Drawing No.: As per ICF Drg.No. ICF/STD 3-5-016, Item-4. Alt-d. Material & Specification: As per ICF Spec: ICF/MD/SPEC-166, Issue Status-01, Rev. 04 of 28.08.2019 Acc
One Coach Set of Brake System Pipe Fitting Items (Single Ferrule Type) consisting of Straight Unions, Union Tees, Union Elbows, Male Connectors and Adaptors as per enclosed Annexure A_6, conforming to
SS hull drum and canister
Construction of New Anganwadi Center Building At Udhale (V.P.Udhale-Wakadpada) Tal. Mokhada, Dist.Palghar.
F.Y. 2025-26 Rectification of Leakage of all Diameter R.C.C. pipe line and Rising Chamber STP For F.Y. 2026 27.
Construction of New Anganwadi Center Building At Karegaon-1 (V.P.Karegaon-Kochale) Tal. Mokhada, Dist.Palghar.
Construction of shed and other miscellaneous work at Poolpada wtp virar east in VVCMC area.
Providing pipe drain from hasmat khan to saibaba mandir in w no 06 at VVCMC area
Construction Of Anganwadi Building at Manpada in V.P. Girgaon Tal.Talasari And Dist. Palghar.
Construction of pathway at hanuman chawl in wno 1 in prabhag C Under VVCMC area
Construction Of New Anganwadi at Kolipadghe (Balshipada) in V.P.Padghe Tal. and Dist. Palghar.
Construction of New Anganwadi Center Building At- kegva thakarepada Tal. vikramgad, Dist.Palghar.
Construction of New Anganwadi Building At- Khand kharpadpada Tal. vikramgad, Dist.Palghar.
Upgradation Modification works of SCADA network system for data acquisition of Waste Management Plants BARC Tarapur
Construction of New Anganwadi Center Building At Karsud Khoripada Tal. vikramgad, Dist.Palghar.
PROCON ENGINEERS make actuator diaphragm for MV having serial no: P3- 20422, PROCON ENGINEERS make actuator diaphragm for MV having serial no: P3- 20439
Construction of New Anganwadi Building At Ruichamatha (V.P. Raytale), Tal. Jawhar, Dist. Palghar
Construction of C C Gutter From Custom office to Car Avenue washing centre at Papadi in W no 109 in VVCMC area
Construction of bandhara at Sarsun Suryanagar Jambhyacha pada Taluka Jawhar Dist Palghar
Reconstruction of UCR bandhara at Chabharshet Taluka - Jawhar Dist- Palghar
Construction of bandhara at Kharadipada No1 Taluka - Jawhar Dist- Palghar
construction of bandhara at Koulale Tokarkhand Taluka - Jawhar Dist- Palghar
construction of bandhara at kharivali tarf kohoj Taluka - Wada Dist- Palghar.