Loading…
Loading…
1,236 results • Latest
Repair and Maintenance work of Aligarh road drain MC Palwal
DNIT for Drilling and installation of 01. nos. Shallow tubewell, and laying of connecting line and other works contingent there to in Village Hansapur Distt. Palwal.
Brake head pin to RDSO Drg. No. WD08093-S/2 Item No.8, Alt.3/KBI Part No.778112 Spec No. WD-23- BMBS2008 Rev-1
IOH Overhauling kit for KBIL make compact triplate panel (Part No. II86643). Kit consists of 18 items, as per Annexure attached. Accepted Description LIST OF IOH/POH KIT FOR KNORR-BREMSE MAKE COMPAC
Overhauling Kit for EPCU to Knorr Bremse Pt No 775004 consisting of 11 items. Brand/Make:SELF
SUPPLY OF TERMINAL BLOCK TO KBI PART NO. KP4181705 FOR TRAIN SET VB CHAIR CAR.
SUPPLY OF LED (EXTERNAL)TO PART NO: 3ED99041R02_C01 FOR SINGLE LEAF PLUG DOOR KNORR MAKE FOR VANDE BHARAT TRAIN SET COACHES THROUGH RATE CONTRACT FOR TWO YEARS
SUPPLY OF RIGHT DOOR LOCKING DEVICE (PNEUMATIC) TO PART NO: 3T103520R54 FOR SINGLE LEAF PLUG DOOR KNORR MAKE FOR VANDE BHARAT TRAIN SET COACHES THROUGH RATE CONTRACT FOR TWO YEARS
SUPPLY OF ROLLER ROCK GUID TO PART NO: 3T102292R40 FOR SINGLE LEAF PLUG DOOR KNORR MAKE FOR VANDE BHARAT TRAIN SET COACHES THROUGH RATE CONTRACT FOR TWO YEARS
Liner for Knorr Bremse make TBU/PBU Model PEC-7 to KBI Part. No.-C5493/1 Firm's offer: Liner for TBU/PBU as per KBI Part. No.C-5493/1. Make/Brand: SELF
SUPPLY, INSTALLATION AND TESTING OF RETROFITMENT KIT WITHOUT SPEED SENSOR FS01 WITH CABLE ASSY AS PER ANNEXURE KNORR BREMSE MAKE WITH LABOUR CHARGES CONFIRMING TO RDSO DRG NO CG-19005 ALT.2 AND CG-182
SUPPLY OF LIMIT SWITCH TO PART NO: 8HN401253R01 FOR SINGLE LEAF PLUG DOOR KNORR MAKE FOR VANDE BHARAT TRAIN SET COACHES THROUGH RATE CONTRACT FOR TWO YEARS
onstruction of IPB Road and Drain both side From Dheer wala chock to babwa Thok wali choupal and other side gali in ward no 07 MC Hodal
High Voltage Phasing Rod for Mumbai, High Voltage Phasing Rod for Manmad, High Voltage Phasing Rod for Mangliya, High Voltage Phasing Rod for Kota, High Voltage Phasing Rod for Piyala, High Voltage Phasing Rod for BKPL Bina, High Voltage Phasing Rod for Vadinar, High Voltage Phasing Rod for Bawdi, High Voltage Phasing Rod for Cochin
Agenda for Construction of 01 no. pump house with VT Pumps on outfall of Janauli Link Drain and Rehabilitation of janauli link drain
Dewatering the flood water from Agricultural land of village Garhi Patti in Hodal constituency by installing 5 no. D.I Pipeline with Sumpwell. Dewatering the flood water from Agricultural land of village Garhi Patti in Hodal constituency by installi
SUPPLY OF AIR RESERVOIR TO KBI PART NO. II97812 FOR TRAINSET VB CHAIR CAR
De-watering of flood water from fields so that yielding of crop is done De-watering of flood water from fields so that yielding of crop is done
Timely de-watering of flood water from village fields so that crop sown timely Timely de-watering of flood water from village fields so that crop sown timely
PROPOSAL OF 02 NOS OF STONE STUDS and PROTECTION OF ATTBA BUND AND VILLAGE AABADI AFTER FLOOD 2025
AGENDA FOR CONSTRUCTING STONE STUD No. 1- 4 WITH EDGE PROTECTION FOR PROVIDING PROTECTION TO AGRICULTURAL LAND OF FATSKONAGAR (FATNAGAR) RIVER COMPLEX ON RIGHT SIDE OF RIVER YAMUNA A/F 2025.
Agenda for Dewatering of flood water by installation of 02 nos. pump house with VT Pumps in village Karna outfalling at RD 8000Ft of Janauli Link Drain
Construction of Road and Drain From shop/o Kirodi to H/o Pappu Baghel , Ward No.08 MC Palwal
Cosntruction of SHED in Shamshan Ghat in ward 11 MC Palwal.
Raising of IPB Street infront of h/o Harish in ward 11 MC Palwal
Renovation of Nuh Road Shamshanghat MC Palwal
Construction of IPB street and drain from H/o Shyamveer Saini to H/o Niranjan Saini, Shiv Mandir to H/o Pratap, H/o Raju to H/o Jaindipura Road and H/o Mahender to H/o Yashpal and Side Gali Ward 28 MC Palwal
Construction of IPB Street and Drain Vedanta School wali Gali in ward 11 MC Palwal
Construction of Street and Drain From Keval to Veer, Chetram to Sunder ,Side Gali and Chimmanlal wali gali, Ward No.09 MC Palwal
Procurement of Safety Kit
Reconstruction of IPB Street from Narender Poswal to Radhe Bijli wale in ward 16 MC Palwal
Construction of CC Road from Dev Automobile to Shivvi Atta Chakki and other IPB street side galis in ward 11 MC Palwal.
Construction of IPB Street and drain From H/o Kuti Mandir to H/o Yadram, Mahesh Chand to Rajkumar and From H/o Raju to Mahaveer and Side Gali Ward 28 MC Palwal
Overhauling Kit for Brake Cylinders to KBI Part Nos. I70191/704W & I70191/304W (Earlier design) and II82515/704 LP&II82515/304LP (Current design) for LHB coaches consisting of following tabulated
Set of allied (MIL) connectors for Knorr-Bremse make LHB coaches consisting of 03 items. (1) Pin 90 degree elbow connector (speed sensor) to KBI part no. N75599, Qty-04 Nos. (2) Connector fitted in
ACE Diesel Engine Operated Automatic Forklifts Brand: ACE (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687732533224 dt.08/04/2026)