Loading…
Loading…
2,979 results • Recent activity
Providing and fixing of hump type speed breaker, cautionary sign boards on 24 mtr road in Sector 5B, MDC Panchkula (A/mtc of road in Sector 1,2,4,5,5B and Sector 6, MDC, Panchkula)
Cleaning and repair of sewer line for MDC area Panchkula all other works contingent thereto (A/mtc of PH services 1,2,4,5,5B and sector 6, MDC, Panchkula)
Repair of submersible pump 50HP with MS pipe lower lifting and with all accessories at T/well E-5, Sector 26, Panchkula Extension complete in all respect and entire satisfaction of Engineer-in-charge (A/mtc of PH services in Sector 1 to 6, MDC, Panch
Repair / re-binding of submersible motor pump set with lower lifting with accessories T/well Ashiana Sector -26, Panchkula extension complete in all respect and entire satisfaction of Engineer-in-charge (A/mtc of PH services in Sector 1 to 6, MDC, Pa
PF of 100/125 KVA DG set for scavering tubewell No.3 Sector 25, Panchkula Extension complete in all respect as per entire satisfaction of Engineer-in-charge (A/mtc of PH services in Sector 1 to 6, MDC, Panchkula and sector 23 to 28, 31 and 32 Panchku
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Annual Turnover *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7101427 Dated : 12-01-2026 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 5 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No