Loading…
Loading…
11,467 results • Latest
work
Rectification of LT PDB Cum MCC starter panel, supply and Installation of 30 KW/40 HP Centrifugal Pump-Motor set for Mangalpur Zone at Searsole Boosting Station under RCFA Part-II Water Supply Scheme.
Repairing and rectification of LT PDB Cum MCC panel(7.5 HP DOL Starter-8 Nos 40 HP S/D Starter-2 Nos) at Baidyanathpur Head Works Site under Baidyanathpur Water Supply Scheme.
work
Rewinding and Overhauling of 40 HP Submersible Pump-Motor Set, LT PDB Cum MCC Panel repairing at Madanpur Head Works under RCFA Part-II W/S scheme
Repairing of No-4 actuator starter, actuator operated butterfly valve for delivery side of centrifugal pump no-1 and 3, replacement of damaged UPS for level indicator at Amdohi Boosting Station under Jamgara-Jagannathpur W/S scheme.
work
Providing and installation of 300 mm dia Electro-Magnetic Flowmeter and level indicator at Runakuraghat Head works under Chotkara-Kanskuli Water supply Scheme.
Repairing of Pump-motor set, Panel, Outdoor lighting arrangement and other allied work at Alkusha OCP based pump house, under Asansol Mechanical Division, PHE Dte. Dist - Paschim Bardhaman.
work
Improvement of CC Road and Repairing of Pot Holes within Ward No. 23 and 54 at different places within Borough- V office under Asansol Municipal Corporation.
Improvement of CC Road and Repairing of Pot Holes within Ward No. 22,51 and 52 at different places within Borough- V office under Asansol Municipal Corporation.
work
Construction of cc road from Srikanta Bute house to Pulak Roy house via Tumpa Sen house ,WIDENING OF ROAD FROM Bijan Majumdar house to Narayan saha house , Apna gas Agency to Arindam Chatterjee ...within ward no -86 Under AMC
Installation of 3.3kV -550V UG Electrical substation at 21WL-20WD for SHCM packages belt, haulage, drill power circuit and 19EL-2ED for pump and drift drivage belt in RVIIA seam at Shyamsundarpur colliery under Bankola area.
Installation of tubewell submersible pump with tank and pipeline near Maji Pukur at sansad V
Bulk water connection for drinking water supply in commercial shop of Sitaram Mistanna Bhandar, S.B. Gorai Road under Asansol Municipal Corporation.
Pot-holes repairing and maintenance of bituminous road From Kd-seem Coliery to Palashdiha F. P. School via Katagoria, ward no-15, Borough-III Under Asansol Municipal Corporation
Supply, instalation and commissioning of one (01) No. mini high mast lighting at Moujuri, Ward No. 15 under AMC.
Improvement of R. N. Road by Installation of Paver Block from Chitra More to Santa Bridge of Ward - 56 and 75 , Borough - VII under Asansol Municipal Corporation.
Temporary lighting work on different festive occasion through a year under Borough-V, AMC.
Miscellaneous Civil Works for Residential Quarters at DBOCP under C.V. Area.
Temporary lighting work on different festive occasion through a year under Borough-VI, AMC.
Temporary lighting work on different festive occasion through a year under Borough-I Jamuria, AMC.
Repairing of 18 Nos. Cylinder Head Assemblies, 18 Nos. Nozzle Assemblies,03 Nos. FIP assemblies of BEML Make BS6D170-1 Engine applicable for BD155 Dozer and dismantling, decarbonizing, assembling and testing of 04 Nos. Head Assemblies of QSK19C Engin
complete rewinding and repairing of 63KVA 550V- 440 Volt lighting transformer along with repairing and maintenance of 440Volt domestic overhead line of NHS-LCH Colonies, water treatment plant and its surroundings under Bankola Area.
making and machining of 2nos. of CI Block with bush and 6nos. of Gun metal bush for centrifugal pumps at Shyamsundarpur Colliery under Bankola Area
Chemical cleaning and Dry Inspection of Lancashire Boiler No. WBL- 11049 of -Kumardihi B Colliery 5 and 6 pit, under Bankola Area ECL
Improvement of Earthen road by Paver Block from Ashapurna Debi Path to Armstrong Avenue at Bidhannagar within Ward No -27
Neamatpur-Rupnarayanpur Road from 9.00 KM to 11.00 km patch repairing in stretches for post monsoon work under within the jurisdiction of Asansol Construction Sub-Division, PWD under Asansol Division, PWD, in the district of Paschim Bardhaman during
Alternative Source of drinking water by Installation of Submersible pump through Rig boring system at Durgapur Fire Station, Within Ward No-22, Under DMC.
Post monsoon work of Sitarampur-Rupnarayanpur Road from 2.500 KM to 3.500 KM patch repairing in stretches under the jurisdiction of Asansol Construction Sub-Division, PWD under Asansol Division, PWD in the district of Paschim Bardhaman during the yea
Post monsoon work of Jamuria-Chakdola Road from 0.500 KM to 2.300 KM, 4.100 KM to 4.600 KM, 7.700 KM to 7.900 KM patch repairing work in stretches in the district of Paschim Bardhaman under Asansol Division, PWD, during the year of 2026-2027.
Chinchuria-Bhuri Road from 0.00 KM to 2.00 KM patch repairing in stretches for post monsoon work under within the jurisdiction of Asansol Construction Sub-Division PWD under Asansol Division PWD in the dist. of Paschim Bardhaman under Asansol Divisio
Repair of Submersible pump at Vivekananda Nagar, Street No Within Ward No-11, Under DMC.
Asansol Court Road from 0.000Km to 0.800 Km rain damaged patch repairing work in stretches in the district of Paschim Bardhaman under Asansol Division, PWD., during the year of 2026-2027.
Asansol - Barakar Old G.T. Road from 447.500 Km to 449.400 Km rain damaged patch repairing work in stretches in the district of Paschim Bardhaman under Asansol Division, PWD., during the year of 2026-2027.
Supply of different dia Gunmetal Locknut for Gate Valve at DMC, Under DMC.
Interconnection, laying, leakage repairing and Road restoration work of 100 mm dia DI Pipe (Pipe supplied by DMC) at Netaji Subhaspally B Block Ward-42 Under DMC.
Repairing of ROP cabin of Dozers Sl. No. 13571,13578 and 13726 working at Khottadih OCP of Pandaveswar Area.
Repairing of Pot holes at Searsole Raj Bari Road , Gurudwara Road within ward no-33,34 and 36 borough-II Raniganj under Asansol Municipal Corporation
Road Restoration work of different places of Durgapur over Departmentally pipeline works and Street Tap Connections, Under DMC.
Repairing and Renovation of Cement Concrete Road from Sodepur Village Lakkhi Mandir...at Ward No.102, Borough -IX under Asansol Municipal Corporation
Day to Day Operation and Maintenance of Water Treatment Plant at Mangalpur and Raw Water Intake Pump House at Ballavpur including repairing of related pipelines at Raniganj for One Year2026-2027
Alternative Source of drinking water by Installation of Submersible pump through Rig boring system at Anganwari, Booth No. 11 of 276AC, Ward No -01 Within Ward No-01, Under DMC.
Abhirampur-Paraj-Kolkol road, 0.00kmp to 1.00kmp and 3.00kmp to 5.00kmp. emergent patch repair work under Asansol Highway Division, P.W. (Roads) Directorate, in the district of Paschim Bardhaman during the year 2026-27
Enhancement of sewerage network at Amrabati Vambey colony near Hari Mandir, within ward-25 under D.M.C.
Patch Repairing of Cement Concrete Roads at different areas of Chelidanga, Dosa Hut, A.T. Tower Road Ward No - 49 under borough - IV, Asansol Municipal Corporation.
Pot-holes Repairing of Bituminous road from (i) Jamuria petrol pump to Sidhu Kanhu statue(ii) Jamuria Cinema more to Nandi village (iii) Nandi high school to Boring danga village within ward no -4 and 1 under borough-I of AMC
Repairing of Bituminious Road And Cement Concrete Road From Pathar Khad tp 6No Gate, Ghanti More to Colliery More, Lalbazarand Different Places Ward No-17, Borough-X Under A.M.C