Loading…
Loading…
2,236 results • Latest
DEPOSIT-Segregation of KSEB and DG Loads for System Enhancement at the District Police Office Pathanamthitta-General Electrical Work
Maintenance of Kaduvakkuzhi Kanjirathinkal road ward 2 of Kallooppara GP,Annual plan 2026-27-124/26-27
GENERAL-Aranmula Boat Race 2026- Maintanance of Irrigation structures in Pampa river and allied works at Aranmula side- General Civil Work
GENERAL-Aranmula Boat Race 2026- Maintanance of Irrigation structures in Pampa river at Thottappuzhassery side-General Civil Work
scarifying and concrete
New Building
MCF - construction using GI tube and pipes
Miscellaneous Civil Work in connection with retrofitting works at Revenue Tower Thiruvalla - Civil maintenance works
Estimate for the cost of maintenance of Vellamthetty camp shed and making additional room and toilet in Vellamthetty under Mannarappara Range during 2026-27
RETARRING
DEPOSIT Construction of External Fire Escaping Staircase to Govt Polytechnic College Hostels for Boys and Girls Vechoochira Civil Work General Civil Work
VVIP Visit of the Honourable Vice President of India to Pathanamthitta on 30 08 2026 in connection with Aranmula Boat Race Urgent Works for Safe House and Green Room at PWD Rest House Providing Stage Pandal at Aranmulaboat race venue
RETARRING AND CONCRETE
RETARRING
RECONCRETE
Vattarkayam Nagar Protection wall construction Angadi GP-Ranni BP SC Corpus Fund
GENERALThenmalaMS2KIP-RBMCFabrication, painting and erection of new shutters 2Nos of size 2300mm (H) x 2400mm (W) and new hoisting mechanism, patchwork of existing hoisting platform at Ezhamkulam Flush escape Ch44601M of RBCGeneral Mechanical Work
RECONCRETE AND SIDE PROTECTION WORK
Estimate for the cost of Maintenance of Chembanaruvi VSS Building under Mannarappara Range during 2026-27
Estimate for the cost of urgent Maintenance of Kadampupara VSS Building under Mannarappara Range during 2026-27
SCARIFYING AND CONCRETING
SCARIFYING AND CONCRETE
RECONCRETE
JJM- WSS to Kulanada- Mezhuveli- Design, Construction, Trial run and Commissioning of 11 MLD WTP and allied works including OandM for 3years, RWPM, CWPM, Pumpsets and Transformer including road restoration works
DEPOSIT-SITC of UPS and UPS wiring in Krishibhavan Vadasserikkara -General Electrical Work
RECONCRETE
side protection and recocrete
Gandhi Vilasam Pazhoor Road-Nedumbram -G
RECONCRETE
GENERAL- Running maintenance contract for the electrical installation at Financial Complex Pathanamthitta for 2026-27-General Electrical Work
RECONCRETE
Road side protection work
reconcrete
Maintenance of Chengaroor orthodox Kurishupadi kanamootil Kadavu road ward 1 of Kallooppara GP,Annual plan 2026-27-122/26-27
RECONCRETE
JJM-5th SLSSC-CWSS to Chenneerkkara and Omalloor Pts-Supplying and laying 450mm DI K9 Raw water pumping main from Well cum pump house to WTP,supply and erection of 630 KVA transformer, VT pump sets and road restoration.
RECONCRETE
electrification
Road side ptotection work
RECONCRETE AND SIDE PROTECTION
RECONCRETE
RECONCRETE
RECONCRETE
Television (V3) (Q2)
RECONCRETE
RECONCRETE
MLA SDF 2021 22 CONSTRUCTION OF PACHAKAPURA AT CMS UP SCHOOL ATHIRUMKAL IN ARUVAPULAM GP VALLICODE GP
Annual Plan- JP PTA 25 -26 PRO NO. 852-- EZHUMATTOOR GOVERMENT HIGHER SECONDARY SCHOOLIL AGNI SURAKSHA SAMVIDHANAM, EZHUMATTOOR GP, KOIPURAM BP - General Civil Work
Annual Plan MYLAPRA GP PRO 69 2026 27 KULATHANI CHEENKALTHADAM FOOTPATH CONCRETE IN WARD 6
Annual Plan MYLAPRA GP PRO 68 2026 27 MANNARAKULANJI MEMANA PADI ROAD CONCRETE IN WARD 6