Loading…
Loading…
602 results • Recent activity
DIGITAL INSULATION TESTER 1KV, CLAMP METER, DIGITAL MULTIMETER, DIGITAL MOTOR CHECKER, DIGITAL INSULATION RESISTANCE TESTER 5 KV
CONCITIAN COIL, BULB LED 5 WATT, BULB LED 9 WATT, PLASTIC BARREL 200 LTR, WIRE FLEXIBLE, WHITE TAPE NIWAR, SAND BAG, ROPE NYLON, HALLOGEN LIGHT 100 WATT, SABBAL 5 FT, YELLOW FLAG, BARBED WIRE CUTTER, DTL SHEET 4 MEN, DTL SHEET 2 MEN
All in One PC (V2) (Q2) (3 (3 ))
Paper A4, Paper FS, Register 240 Pages Normal, Register 200 Pages Normal, Register 100 Pages Normal, Cart 12A, Cart 1208 A 88 Alpha, Canon NPG 59 Toner Black, File over Coloured GRRC Printed, File Cover White GRRC printed, Glossy Photo Paper, Envelop File Size Yellow, Envelop A4 Yellow, U lip Plastic coated, Pen V7 cartriege system, Cartridge V5 Oblique V7, Pen V 5 Blue, Reynolds Ball pen blue, Reynolds Ball pen black, Pencil, Eraser, Talc Roll big, Talc Roll Small, Drawing Sheet Y P W SB, Glue Stick, Gift Paper all colour, Highlighter, Tape Transparent 12mm, Tape Transparent 24 mm, Tape Transparent 48 mm, Tape Black 12mm, Duster, Talc sheet normal, Cutter Blade, Readymade Gift flower each colour Per piece price, Cutter, Spiral Ring large and medium, Spiral Sheet Blue and transpaarent, Lamination Sheet A4, Board marker Blue Red Black Green 1 each, Permanent Marker Blue Red Black Green 1 each, Staplir Pin Small, Stapler Small, Stapler Big, Writing Pad Big Green Note sheet pads, Self Stick Resposibility note, Scissor, Fevicol, Ribbon all colour, Tape 0.5 Inch Yellow Green and Black, Tape Transparent 1 inch
Angle Cutter (Electric) (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Past Performance, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7059164 Dated : 01-01-2026 Bid Document 1/10 Number of Auto Extension count 2 Past Performance 10 % Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority Board of Officers Quality Assurance Plan document 1767182602.pdf Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 39 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : IG Ftr Hqr SSB Siliguri, Srushtranagar, Darjeeling, West Bengal-734012 2/10 (Inspector General)
High Mast Lighting Octagonal Tower for Small area with LED Flood Lighting System (V2) (Q2) (3 (3 ))