Loading…
Loading…
54 live40 closing this weekmost from Uttar Pradesh Cooperative Sugar Factories Federation Limited and Cheif Engineer Bareilly Zone PWD Bareilly
54 results • Latest
tender for AUTOMATION INTEGRATION OF 8 BAY BOTTOM LOADING GANTRY AND TLF PUMPS AND ASSOCIATED INSTRUMENTS AT BAKANIA DEPOT ok
Silt Clearance of Absara Dy from km. 0.000 to km. 10.640 for year 2026-27(Lot-33)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Electric Motor Stator Rewinding 05 HP/1440 RPM; Service Provider, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Electric Motor Stator Rewinding 05 HP/2900 RPM; Service Provider, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Electric Motor Stator Rewinding 7 point 5 HP/1440 RPM; Service Provider, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Electric Motor Stator Rewinding 10 HP/1440; Service Provider, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Electric Motor Stator Rewinding 12point5 HP/1440 RPM; Service Provider, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Electric Motor Stator Rewinding 15 HP/1440; Service Provider, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Electric Motor Stator Rewinding 20 HP/1440; Service Provider, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Electric Motor Stator Rewinding 25 HP/1440; Service Provider, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Electric Motor Stator Rewinding 30 HP/1440 RPM; Service Provider, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Cane Unloader Motor Stator 30 HP/960 RPM Rewinding class H 180 degree C; Service Provider, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Electric Motor Stator Rewinding 60 HP/1440 RPM; Service Provider, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Electric Motor Stator Rewinding 75 HP/1440 RPM; Service Provider, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Electric Motor Stator Rewinding 90 HP/1440 RPM; Service Provider, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Electric Motor Stator Rewinding 100 HP/1440 RPM; Service Provider, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Electric Motor Rotor Rewinding 30 HP with Balancing; Service Provider, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Electric Motor Rotor Rewinding 90 HP with Balancing; Service Provider, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Celling Fan Rewinding; Service Provider, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Exhaust Fan 18inch/24inch Rewinding; Service Provider
weighbridge spare part
suppy of 50kg CI Weights
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Store Material Loading and Unloading Work; as per documents
rubber oil seal and o ring supply
Facility Management Services - LumpSum Based - Industrial; AMC OF CENTRALISED LUBRICATION SYSTEM as per tender documents; Consumables to be provided by buyer
Facility Management Services - LumpSum Based - Industrial; Printing and General Stationery as per tender documents; Consumables to be provided by service provider (inclusive in contract cost)
MS I BEAM GIRDER
Facility Management Services - LumpSum Based - Industrial; diff type statinory supply; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Industrial; Drier House Work As Per Tender Documents; Consumables to be provided by service provider (inclusive in contract cost)
Protection work of 2x3 Meter Span RCC Culvert and approach Road in Pilibhit bypass road (ODR) At Km 11 in Pilibhit district
Dynamic Balancing of different Sizes at our Mill Site
Protection work of 2x3 Meter Span RCC Culvert and approach Road in Pilibhit bypass road (ODR) At Km 4, 5 in Pilibhit district
Protection work of 2x3 Meter Span RCC Culvert and approach Road in Pilibhit bypass road (ODR) At Km 3 in Pilibhit district
Reconstruction of Pilibhit Tanakpur Road to tanda Bijesi Link Road
Reconstruction of Madhotanda to Barahi Road 1st part link Road
Reconstruction of Madhotanda Haripur Road to Gomti Mandir to Loharpura Link Road
Construction of Yatri Shed work at Bisalpur Campus in Tehsil (Vidhayak Nidhi)
Construction of Yatri Shed work at Tehsil Bisalpur Campus in Bar Association (Registry Office) (Vidhayak Nidhi)
DIGITAL LOAD CELL 10TON WITH MOUNTING ASSEMBLY 4 PCS, DIGITIZER DIGITAL MAKE TRIX, CONVERSION FABRICATION WORK FOR OUT CENTER W B CONVERT ONE LOADCELL TO 4 LOADCELL BASED
Construction of Boundry wall/Pillor/Fencing Around the Land of Public Works Department at various places in District-Pilibhit
Repairing Charges for Stiching Head, Repairing Charges for Conveyor, Visit Charges during Season
Handling and Transport on Lumpsum Basis - Handling & Transport Service
New Construction of Bankati-Pandri road To Bankati-Mahof Tak Link Road via Bithaura Khurd (VR)
DISPOSAL OF 40000 METRIC TONS OF LEGACY WASTE PRESENT IN THE DUMPING GROUND AT NAGAR PALIKA PARISHAD BISALPUR (PILIBHIT)
Facility Management Services - LumpSum Based - Fabrication And Erection Work 2026-27; Fabrication And Erection Work 2026-27; Cost of consumable to be reimbursed to service provider on actual
Handling and Transport on Lumpsum Basis - Transport Service, Handling and Transport on Lumpsum Basis - Handling & Transport Service
Tentage Service Lumpsum Based - Saras Mela; Saras Mela
Complete Servicing Repair and AMC of Sugar Weighing System Hi Tech WB Series Sugar Bin Capacity 40 T, Complete servicing Repair and AMC of sugar weighing system Hi Tech WB series Sugar Bin capacity 30 t, Visit charges To and Fro charges
LOK NIRMAN VIBHAG KE ANTARGAT JANPAD PILIBHIT KE SHASKIY BHAVANON PAR SOLAR ROOFTOP KI STHAAPNA KE KARYA.
Construction of 48 Capacity Hostel/Barrack and 01 Investigation Room in Thana Hajara Distt-Pilibhit
Construction of 40 Capacity Hostel/Barrack and 01 Investigation Room in Thana Sehramau Uttari Distt-Pilibhit
Reconstruction work of Suswar Dalelganj to Degree Gautiya Connecting road (VR)
New Construction work from KM 278 of NH-74 to the Durga Devi Sthal located at Gaibaujh village (VR)
New Construction work of Udaykaranpur to the remaining section of Teramil Nakar Road
New Construction of Kargaina to Dinarpur Road (VR)
Shifting, Repairing and Servicing of DG sets and associated work at various Hub / leased-out sites in Pilibhit OA under Bareilly BA.
Carrying out paddy harvesting, threshing, straw processing using a machine with a straw reaper
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - Sedan; Maruti Suzuki Dzire; 2021; 25, 000-50, 000 kms; A/C; 12
Diesel Generator Set As per MHA Specifications (V2) (Q2) (3 (3 ))
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; ETP WORK; AS PER DOCUMENTS
Construction Work of a 3 TPD Capacity Wet Waste Processing Unit in Nagar Panchayat Jehanabad, District Pilibhit
LED Rope Light (LED Strip Light) Conforming To IS 10322 (Part 5/Section 9) (Under BIS Scheme - II) (Q3) (3 (3 ))
Nagar Palika Parishad Bisalpur ke Ward no.9 me Abhay Saxena ke Ghar se Arvind pal ke Ghar, Sagun Gupta ke Ghar se Sahu Kasi Nath Caloni Gate, Shiv Mandir se Ramsevak Gangwar ke Ghar, Master Sahab, Lal Bhadur Gangwar ke Ghar se Anudham Mittal ke Ghar
Decorative Lightning Pole (V2) (Q3)
Fishing Rights for Sharda Sagar Jalashya Category-1 District Pilibhit Uttar Pradesh
8 BAY GANTRY AUTOMATION WORKS AT BPCL BAKANIA DEPOT