Loading…
Loading…
116 results • Latest
Construction of Funeral Point / Funeral Home in Vill Kalyanpur Nogwan Vikas Khand Marori Vidhansabha Barkheda.
शवदाह हेतु शेड निर्माण Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.DSR 2.8.1
Construction of Marriage Hall / Community Centre in Vill Kargaina Peera Vikas Khand Amariya Vidhansabha Pilibhit
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil as per DSR 2023 SI.No. 2.8.1
Construction of Funeral Point / Funeral Home in Vill Lalori Vikas Khand Lalorikheda Vidhansabha Pilibhit
शवदाह हेतु शेड निर्माण Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.DSR 2.8.1
RE-CONSTRUCTION OF MAIN GATE COMPLEX OF PURANPUR SAMITI - PILIBHIT
Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5 m (5 fts.) and lead upto 30 mt. (100 fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-Incharges upto a distance of 30mt. (100 fts) from the foundation trenches.
CONSTRUCTION OF 5 SHOPS IN JOGITHER GODOWN OF BISALPUR SOCIETY, AT DISTT PILIBHIT
Earth work in exacavation in trenches for foundations and for pipes cables etc. in ordinary soil(loam clay or sand) including lift upto 1.5 m and dressing of sides and ramming of bottom sand disposal of surplus excavated earth as directed by the Engineer i/c with in a lead of 50m
Construction of office building of Flood Division Puranpur Pilibhit in Pilibhit district
Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.