Loading…
Loading…
192 live145 closing this weekmost from U P Irrigation Department (Civil) and Directorate of Local Bodies UP
192 results • Latest
Patch repair work on Left Bank Service Road of Nagapur Dy from km 3.150 to 5.00
Patch repair work on Left Bank Service Road of Allahabad Branch from km 45.995 to 47.350
Patch repair work on Left Bank Service Road of Siya Dy from km 7.500 to 8.600
Renovation Work of Divisional Leboratory Hall, Dahilamau in District-Pratapgarh (Year 2026-27)
Renovation Work of Divisional Leboratory Outer Room, Dahilamau in District-Pratapgarh (Year 2026-27)
Construction of Boundrywall at Divisional Laboratory, Dahilamau in District-Pratapgarh (Year 2026-27)
LED Luminairefor High Bay Lighting (Q3)
LED Rope Light (LEDStrip Light) Conforming To IS10322 (Part5/Section9) (Q3)
Octagonal Pole (V2) (Q3), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Q2) (3 (3 ))
High Mast Lighting Octagonal Towerfor Smallareawith LED Flood Lighting System (V2) (Q2)
Under District Prayagraj, Construction of road in the plot next to the house of Amar Chandra Jaiswal from Gram Sabha Vohra Jaiswal Nagar, Lot No 1
Under District Kaushambi, Construction of road from Nivi road of Khand Chail to road in Samda, Lot No 1
Under District Pratapgarh, Construction of interlocking road from Mohanganj-Jethwara Ram Van Gaman District Pratapgarh, Sonepur Daulatpur Maurya Basti, Lot No 1
SITC of PWMU 06 Units (Plastic Bailing Machine, Plastic Waste Shredder machine with Accessories, Dust Remover Machine etc.)
1) Rate Contract for Flood Damaged Road Repair work on Various roads in PWD Sub Dn. II Pratapgarh
2) Rate Contract for Heliped Construction, Ground Leveling Work, Road Repair and Various Miscellaneous Works while VIP Visits under PWD Division I Pratapgarh
3) Rate contract for Tentage Work like Safe House, Dome, Stage etc. for VIP Visits under PWD Division I Pratapgarh
Renovation of building, boundary wall and Raising of boundary wall at Kuni, Pratapgarh
Renovation of building, boundary wall and Raising of boundary wall at Satola, Choti Sadri, Pratapgarh
Earth filling at 33 KV S/S building with boundary wall at Veerawali, Pratapgarh
Const. of 33 KV S/S building with boundary wall at Tamatiya under AEN (O and M) Pipalkhunt
Renovation of building, boundary wall and Raising of boundary wall at Chupna, Pratapgarh
Const. of 33 KV S/S building with boundary wall at Hinglath under AEN (O and M) Arnod, Pratapgarh
Renovation of building, boundary wall and Raising of boundary wall at Rathajana, Pratapgarh
Construction of Boundary wall at Surajpur Site-C Housing Distt. G.B. Nagar
Repair and Restoration of Padliya Dam and canals G.P. Padliya, Dhariyakhedi Dam and Canal G.P. Dhariyakhedi, P.S. and Tehsil Suhagpura District Pratapgarh
Establishment of Oil and Pulse Processing Unit at Wagan Sub Project Stage-2 District Chittorgarh
5. Ward Number 02 and 08 me Sona devi Harijan ke makan se Sanjay Srivastava ke makan tak and Ram Bahadur Harijan ke makan se Babe Jain ki dukan tak covered nala Nirman work
4. Ward Number 07 Bajarkhas Pashchimi me Shiv Ji Mandir se Cold Store Mod tak covered Nali Nirman work
3. Ward Number 07 Bajarkhas Paschimi me Mangal singh ke Dukan se Hridey singh ke ghar ke pass Nala tak covered nala and Mandhata marg se Mata Prashad ke ghar tak covered nali Nirman
2. Ward Number 5 Takiyajhausah me Hakeem Mo Irshad Ke Makan se Gadhai Tak covered Nala Nirman work
1. Ward Number 01 Awanpur me Rajendra Singh Wais ke Makan se Ram Baran ki Chakki Hote hue FCI Gaudam ke pass Talab tak Covered Nala Nirman work
Decorative Lightning Pole (V2) (Q3)
SUPPLY OF Electric Feeder Panel Board (L&ampT Make)
SUPPLY OF Ball Bearing 6204Z
Electrification Work in MP MLA fund and other full deposit scheme under Electricity Distribution division Lalganj, Pratapgarh on semi turnkey basis including loading and unloading of material.
Electrification Work in MP MLA fund and other full deposit scheme under Electricity Distribution division Kunda, Pratapgarh on semi turnkey basis including loading and unloading of material.
Electrification Work in MP MLA fund and other full deposit scheme under Electricity Distribution division, Pratapgarh on semi turnkey basis including loading and unloading of material.
Electrification Work in MP MLA fund and other full deposit scheme under Electricity Distribution division Raniganj, Pratapgarh on semi turnkey basis including loading and unloading of material.
Pakka Work- Anicut, Pakka Check Dam and anicut cum causway Total 22 works
Construction of SDO Office Building at Suhagpura Distt. Pratapgarh
OFFICE MAINTENANCE WORK OF AWAS VIKAS PARISHAD, C.D. PRAYAGRAJ-02, PRATAPGARH.
Construction of boundary Wall RPL Paratapgarh
Construction of Lab Building in Inspection House Pratapgarh
STMC work on NH-56 Old NH-113, Pratapgarh-Padi Section and Construction of 2 Lane Road in Forest Area, Km 38/100-43/040, 46/500-47/080 and 51/640-54/500, NH-113 on EPC Mode, Rajasthan
TENDER FOR PREMISES REQUIRED ON LEASE BASIS AT PRATAPGARH, RAJASTHAN
REQUEST FOR PROPOSAL FOR THE SELECTION OF DISTRICT SERVICE PROVIDERS FOR ESTABLISHMENT AND OPERATIONS OF COMMON SERVICE CENTERS/JAN SUVIDHA KENDRA IN PRATAPGARH DISTRICT OF UTTAR PRADESH (CSC 4.0)