Loading…
Loading…
1,119 results • Latest
EOI invited for association as JV Partner from Experienced Agencies for EPC Agreement...For third line track b/w Manikpur to Iradatganj... incl. Electr., Signal. works along with constr. of ROB...,RUB...in Manikpur Iradatganj 3rd line project of NCR
"Modification / Shifting of 33KV, 11 KV, 440 Volt Electrical Power Line Over Head Crossing of State Electricity Board by Under Ground XLPE Cable at Various Location between BARI-SIRMUTTRA (Phase-II) Section in Connection with the work of Gauge Conversion from N.G. to B.G. between DHO-SRMT Section of Agra Division of North Central Railway".
REPAIR MAINT OF FIREFIGHTING PIPE LINE INFRASTRUCTURE WITH CONNECTED ITEMS UNDER AGEI AF MANAURI
Maint and painting to Main Angle qty 370 Nos, post Hook L Bay qty 169 Nos & Post Hook F Bay qty 72 N
Maint, Greasing and Painting to Plain roller Mk-II, Rocking Roller MK-II, and maint & painting to
Maint and painting to Chesses Junction EWBB qty 13 Nos, Post Connecting FBE male qty 166 Nos and fem
Maint and painting to Stock Anchor 80 Kgs qty 53 Nos, Beam Grillage 10" x4-1/2" x8" qty 65 Nos
Proton Conductivity Meter (Electrochemical Workstation including computer setup)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Work for measurement of various 132 and 33 KV Transformers Circuit Breakers closing and opening time and contract resistance at various 132 KV Substations under ETD III ..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Work for Transformer oil sample collection from main tank and OLTC tank and testing at various Transmission Substations under ETD II III IV Prayagraj; Substation, Switch..