Loading…
Loading…
426 results • Latest
(A) S&T works in connection with modification of Prayagraj Chheoki, Link junction and Naini Jn. yard layout. (B) Signaling work in connection with Provision of a crossover for provision of simultaneous movement at Link Junction station.
(A) Signalling work for Construction of ROB in lieu of LC-415-A at Km 1313/0-1 and (B) Construction of Grade separator with stair (FOB) at LC no. 34L at KM 1348/31-33 in NYN-MKP section of Prayagraj Division.
CLEANING OF SEWER LINE INCLUDING REPAIR/RELACEMENT OF DAMAGE MAN HOLE, PIPE LINE, SEPTIC TANK, SOAK WELL, MAINHOLE ETC AT RA LINE, TRIVENI VIHAR, MTRC LINE, SELECTION CENTRE EAST, ENGR PARK, 95 FD REGT, 264 COY ASC SUP, 749 TPT PL ASC CIV GT AND OFFR
SPECIAL REPAIR TO BLDG NO T-30 AND T-31 OF SECTION HOSP CHHEOKI, EX MIL HOSP PRAYAGRAJ UNDER GE WEST PRAYAGRAJ