Supply as per 01.00 of Material Requisition (Top Sheet), Sitework as per 02.00 of Material Requisition (Top Sheet), Mandatory Spares as per 04.00 of Material Requisition (Top Sheet), On-site training as per 11.00 of Material Requisition (Top Sheet), Complete 3D Modelling as per 16.00 of Material Requisition (Top Sheet), Hazop Study as per sl. no 17.00 of Material Requisition (Top Sheet)
GeMProduct Custom Bid/RAsGoodsSupply as per 01.00 of Material Requisition (Top Sheet),Sitework as per 02.00 of Material Requisiti