Loading…
Loading…
552 results • Latest
M/R to canal by repairing ghoges, damaged canal banks and operation of 8 gates other than main regulator gates at different locations of KN-I (2 gates), KN-II (2 gates), Kalna Channel (2 gates), Shergarh (1 gate) and 270 W.C. (1 gate) within Jamalpur
Clearing and removing water hyacinth, weeds, floating vegetation and jungles from Kana Nadi Canal from Ch.0.00 to 285.00 under Jamalpur Irrigation Section of Jamalpur Irrigation Sub-Division during the year 2026-27.
Clearing and removing water hyacinth, weeds, floating vegetation and jungle in between ch. 0.00_115.00 of KN1 Canal and ch. 0.00_106.00 of KN2 under Jamalpur (I) Section within Jamalpur Irrigation Sub-Division in the year 2026-27.
Clearing and removing water hyacinth, weeds and aquatic jungle from Ch. 0.00 to Ch. 155.00 of Sajibur Drainage Channel (off-taking from CD at Ch. 46.00 of KD Canal) and Ch. 0.00 to Ch. 105.00 of Sarangpur Drainage Channel under Jamalpur (I) Section w
All as per BOQ
All as per BOQ
All as per BOQ
Construction of New Toilet Block at Ahahhadipur FP School at Sagrai GP under Khandaghosh Development Block.
Repairing Toilet Block at Hamirpur FP School at Khandaghosh GP under Khandaghosh Development Block.
Repairing Toilet Block at Huria FP School at Sankari I GP under Khandaghosh Development Block.