Loading…
Loading…
487 results • Latest
Canal gate operation, watching and guarding of canal banks and structures at Ch. 2270.00, including the stretch from Ch. 2175.00 to Ch. 2329.00 of L.B.M.C. along with all its watercourses, and operation of all canal head regulators and cross regulato
Operation of canal reg gates (Cross and head regulator) at different location of 19A, 19B, 18, 17 of RBMC during Kharif Irrigation-2026 under Lohai (I) Sec of SBID, DC Divn.
Maintenance and repair to canal, removal of trash and floating material from reg gate, clearing of outlets incl clearing jungle, water hyacinth at diff location of Ch-1859.50 (CH-1803.00 to ch- 1960.00), Ch-2618.00 of RBMC, (Ch-2527.00(D/S ) to Ch-27
Operation of canal regulator gate (Cross and head regulator of canal) of Dy-11 (CH-120 TO CH- 515), Dy-l1C, WC CH-240 of Dy- 11 of RBMC during Kharif lrrigation-2026 under Uchalan-l (l) Section of Seharabazar (l) Sub-Divn DC Division.
M/R of Canal Bank / Slopes in connection with Kharif Irrigation 2026 in between Ch. 1850 to Ch 2806.00 of L.B.M.C., WC-2566, Minor-II, III, V and all water course and Minors at mouza- Nala, Ysufabad, Hatshimul, Totpara and Manikhati in Block Bardham
Running maintenance and repair to Canal 6MC from Ch. 0.00 to Ch. 486.00, 6AMC from Ch. 0.00 to Ch. 163.00, 6CMC, 6DMC, 6D1MC, 6D/1 Extension, WC 150, WC 250 and WC48 during Kharif Irrigation-2026 under Burdwan Section of D. C. No-I Sub-Division withi