Loading…
Loading…
11,136 results • Latest
Construction of Concrete road from Hara Maji Bari to Shyamal Maji Bari at Dirghosoya of Gotistha G.P. under 15th C.F.C(B.G.)
Const of CC from Jhakarpara School towards house of Karna Santra at arbelia sansad 11 Under Anukhal Gram Panchayet Activity No 111983357 Untied 2025-26
Construction of Concrete road from Yanus SK House to Dukho SK house at Kashiyara of Gotistha G.P. under 15th C.F.C(B.G.)
Construction of Concrete road from Bhagirath Bag Bari to Chandu Bag Bari at Naowpara of Gotistha G.P. under 15th C.F.C(B.G.)
CONSTRUCTION OF 120 FT 8 FT CONCRETE ROAD FROM IDRIS SARKAR HOUSE TO BAPI SARKAR HOUSE
CONSTRUCTION OF PUCCA GHAT AT MICHRI PUKUR PASCHIM PAR NEAR HOUSE OF SUSHANTA MUKHERJEE AT KASARIPARA (BOOTH NO- 107) AT AMADPUR GP UNDER MEMARI-I PS , FUND- APAS
Construction of Concrete road from Ajay Ghosh Land to Kunur Dhar at Radhanagr of Gotistha G.P. under 15th C.F.C(B.G.)
Operation for Hatsimul PWSS of Burdwan-II Block with in Burdwan Sub Divn. Under Burdwan Division, PHE Dte Period from 01.10.2026 to 30.09.2027.
Construction of Concrete Road from Sahev Seikh House towards Babulal Seikh House at North Srirampur Sansad X ID-113810960
Construction of CC Road from Prabir Mondal house to Sufal Das house under Atghoria-Simlin G.P., Booth No- 217 - SondalpurTulshirani Junior Basic School (APAS/01/268/217/0008)
Installation of Solar Submersible for fresh drinking water with pipe line at Annapurna Tala besides house of Satyaanarayan Bagdi at Bhuri Dakhin.
Construction of concrete cover drain with soakpit for Grey Water Management from Naru Roy House of Manik Pakre at Shyamsundarpur.
UPGRADATION OF GUIR MARKET COMPLEX AT GUIR
Construction of Concrete road from Swapan Sekh Bari to Kabarsthan at Gotistha of Gotistha G.P. under 15th C.F.C(B.G.)
Construction of Concrete road from Prallad Maji Bari to Parasar Maji Bari at Dirghosoya of Gotistha G.P. under 15th C.F.C(B.G.)
CONS OF PCC ROAD FROM MAIN ROAD TOWARDS NABAKUMAR GHOSH HOUSE AT PILGRAM 127527379
Operation Maintenance of Distribution System ,Rising main, Sluice Valves, including operation of sluice valves for Khundkuri PWSS of Khandaghosh Block within Burdwan Sub-Division under Burdwan Division, PHE Dte Period for 1(one)year
Construction of Concrete Road from Madhusudhan Debnath House towards Braojolal Debnath House at Ganganandapur Sansad VI ID 113808241
Construction of covered Pucca drain with soakpit from Kajipara Masjid to dighipar at Gotistha of Gotistha G.P. under 15th C.F.C(B.G.)
Construction of covered Pucca drain with soakpit from Primary School to Dompara at Paschimgopalpur of Gotistha G.P. under 15th C.F.C(B.G.)
Supply Installation and Comissioning of Solar highmust light at Alampur bus Stand under Alampur G P within Katwa 1 Panchayat Samity
Construction of boundary wall at 2nd Tube well site of KAYRAPUR Water Supply Scheme (Part-B) and its adjoining mouzas, Block-Ausgram-I, under Burdwan Division P.H.E. Dte.
Patch repair work in stretches of Karjana Muratipur Natunhat Road from 0.00 kmp to 2.00 kmp and 4.00 kmp to 5.00 kmp under Bhatar Highway Sub-Division No.-I of Burdwan North Highway Division in the district of Purba Bardhaman during the year 2026-27.
Patch repair work in stretches of Kaichar-Nandigram-Singhi Road (MDR) from 14.50 Km to 15.60 Km, 21.80 Km to 22.20 Km and 24.20 Km to 25.20 Km under Katwa Highway Sub-Division of Burdwan North Highway Division in the district of Purba Bardhaman......
UPGRADATION AND CONSTRUCTION OF PCC ROAD FROM MAJHERPARA KOLGHAR TO COMMUNITY HALL (BOOTH NO- 115) AT AMADPUR GP UNDER MEMARI-I PS , FUND- APAS
Construction of Sashan Shed at Deha at Gope Gantar-II G.P. under Memari-I Panchayat Samity, Fund- 5th Untide
Repairing and Renovation of Damaged AWC at various places (12 Nos) under Paratal-II GP within Jamalpur Development Block out of SDRF fund.
Construction of Cold Drinking water with Overhead tank and Submersible pump at Chakshanjadi Keya Tala under Berugram G.P within Jamalpur Panchayat Samity
INSTALLATION OF SUBMARSABLE PUMP WITH RESERVER TANK AND PURIFIED DRINKING WATER SYSTEM PURBA PARA MANNA SHOP AT SANSAD IX
Operation of PLC Based Central Automation System along with all field equipments at Water Treatment Plant in Panagarh under Panagarh Industrial Park Water Supply Scheme.
Operation and Maintenance of High Lift, Low Lift Pumping machineries, Yardlighting arrangement and Chlorine Dosing Unit at New Churulia Pump House under Churulia Water Supply Scheme. Block-Jamuria, district-Paschim Bardhaman
Installation of Solar Submersible Pump at Pursa Hospital para(Baki Bandh) at Potna pursa GP under Galsi-I Panchayat Samity
CONSTRUCTION OF PCC ROAD FROM 1 NO F.P SCHOOL TO HOUSE OF LELO AT BOOTH NO 213, Activity ID - APAS/01/274/213/0012, Under Potna-Pursa Gram Panchayat OfGalsi-I Dev. Block
CONSTRUCTION OF COVER DRAIN FROM HOUSE OF RABIUL MALLICK TO NH19 AT BOOTH NO 213, Activity ID - APAS/01/274/213/0014, Under Potna-Pursa GP. Of Galsi-I Dev. Block
Construction of Switchyard, Cable trench, pathway, equipment foundation, fencing and associated civil work for restructuring of existing Shaktigarh 33/11kv Sub-stn under Memari (D) Division, Dist.-Purba Burdwan
Repairing and maintenance Civil Work at Srirampur 33/11 kv Sub-Station under Kalna (Division) in the District of Purba Bardhaman
Renovation of control room building, S-Yard concreting, Pathways, C-trench, Chequred tiles, drain, B.wall Y-Angle, painting etc at Mejhiary 33 11 kv sub Station, under Katwa D division.
Civil work for augmentation of SubStation capacity from 2 10 AND 2 6.3 MVA to 2 10 AND 3 6.3 MVA at Seherabazar 33 11 KV Sub Station under Burdwan South Division.
Renovation of control room building,toilet and roof treatment work at Shaktigarh 33 11 kV Sub-Station under Memari D Division.
Construction new bay extension work at Madhabdihi 33 11 KV SubStation under Burdwan South Division
Modification of Switchyard and augmentation of SubStation capacity from 22.6 MVA to 28.9 MVA of Nababhat 33 11 KV Sub-Station under Burdwan South D Division Dist Purba Bardhaman
REPAIRING OF CC ROAD ANDADJACENT DRAIN AT MONTESWAR TALA DEBNATH COLONY FROMCHITTA DAS HOUSE TO BHAGYAMASTER HOUSE(APAS/01/260/207/0006)
INSTALLATION OF CYLINDER TUBEWELL MONTESWAR TALA IN FORNT OFNANDA PALHOUSE(APAS/01/260/207/0005)
REPAIRING OF ROAD AT MONTESWARTALA DEBNATH COLONY FROMSANTOSH KORA HOUSE TO SUSIL RAYCHOWDHURYHOUSE(APAS/01/260/207/0008)
Repair and Maintanance and Painting Works at Sector 1 CCC under Burdwan South Division.
Relaying of 90 mm dia UPVC distribution pipeline ,road /drain restoration and FHTC repairing of Golgram PWSS at Galsi-I block under DWSD,PHE Dte
CONSTRUCTION OF NEW DRAIN ATMONTESWAR TALA DEBNATH COLONYFROM PARIMAL DEY HOUSE TO BABULAL CHATTERJEEHOUSE(APAS/01/260/207/0009)
Supplying of residual chlorine kit and engagement of lab personnel (Chemist/Bacteriologist/Lab Assistant and sampling Assistant) including maintenance at Galsi Sub-Distric lab under Durgapur W/s Division,PHE Dte ,Purba Bardhaman (Yearly)
CONSTRUCTION OF NEW CC ROADAND ADJACENT DRAIN ATMONTESWAR TALA BAM PUKUR FROMNEMAI DAS HOUSE TO RAMESH DASHOUSE(APAS/01/260/207/0010)
GRAY WATER MANAGEMENT COLLECTIONINFRASTRUCTUR TRETMENT WITH COVER SLABFROM AMGORE TO GHOLA PUKUR AT KUCHUT 07