Loading…
Loading…
10,975 results • Latest
Construction of a concrete road Length 100 ft Breadth 8 ft from Sk Kabuls House to Akbars House, benefiting 100 residents
Construction of a concrete road Length 100 ft Breadth 8 ft from Ripus House to Kalos House benefiting 70 residents
Construction of a concrete road Length 100 ft Breadth 8 ft from Sapiyars House to Harus House, benefiting 90 residents.
Construction of a concrete road Length 100 ft Breadth 8 ft from Golam Nabis House to concrete road benefiting 65 residents
Construction of Sanitary Store Room Beside Water Treatment Plant Beside Subodh Smriti Road Ward No-12, under Katwa Municipality, under 15th Finance Commission Tied Grant.
3 Nos Sinking of 100 x 40 mm dia 110mtr deep Tube Wells using P.V.C Pipe with water jet system at Bus Stand, Station Bazar Hospital More premises Public Toilets for building up uninterrupted water supply facility at Ward No 20, 07, 04
3 Nos Sinking of 100 x 40 mm dia 110mtr deep Tube Wells using P.V.C Pipe with water jet system at Khal Para Sluice Gate, Katwa Para Oil Mill More Mondal Para Community Toilets for building up uninterrupted water supply facility at Ward No-15
CONSTRUCTION OF TOILET BLOCK PT MODEL NO G BESIDE WATER TREATMENT PLANT IN WARD NO 12 UNDER 15TH FINANCE COMMISSION TIED GRANT.
SITC of IT Infrastructure work for setting up 1 No Smart Classroom within Academic Complex of Burdwan Medical College, Purba Bardhaman IT Work, Project ID - HF262751628S000
Repairing of toilet at Joykrishnapur Mirdhapara SSK and Parsurampur SSK
Operation and Maintenance of 16 (Sixteen) no Gates for Kharif Irrigation, 2026-2027 including maintenance of canal on up stream and down stream of the gates under Baidyapur Irrigation Section of Memari Irrigation Sub-Division under LDID
Clearing and Removing water hyacinths in between Ch. 1218 and Ch. 1410.00 of Drainage Gangur Khal, within Block- Kalna-II, Distrct - Purba-Bardhaman under Baidyapur (I) Section of Memari Irrigation Sub-Division within Lower Damodar Irrigation Divis
Construction of CC Road From Molla Danga Kabrastan To Football Ground Under Ilsoba Daspur Gram Panchayet
CONS OF OPEN MANCH AT NATUN PUKUR PARA AT KALYANPUR
CONSTRUCTION COVER DRAIN WITH VERTICAL SILT CHAMBER FROM KANSHRA RAKSHIT HOUSE TO KANSHRA FP SCHOOL
CONSTRUCTION COVER DRAIN WITH VERTICAL SILT CHAMBER FROM DIBAKAR KOIBARTYA HOUSE TO DHORONI KHETRAPAL HOUSE AT ARASUL
CONSTRUCTION OF CYLINDER TUBE WELL AND SOAK PIT NEAR CHATTOR GORE AT SERORAI PURBA PARA VILLAGE SERORAI SANSAD III -113057331
CONSTRUCTION COVER DRAIN WITH VERTICAL SILT CHAMBER FROM KANSHRA FP SCHOOL TO RAKSHIT HOUSE AT KANSHRA
CONS OF OPEN MANCH AT CHANDITALA PARA AT KALYANPUR
UPGRADATION OF BOUNDARY WALL AT KALYANPUR FP SCHOOL
CONSTRUCTION COVER DRAIN WITH VERTICAL SILT CHAMBER FROM PUSKAR BANERJEE TO SWAPAN MALIK AT NUTANGRAM
UPGRADATION OF ROAD FROM MAIN ROAD TO SHASHAN WITH PLATFORM AT KALYANPUR
REPAIRING OF KHETURA ADIBASI PARA CULTURAL STAGE BOOTH NO-285
CONSTRUCTION OF CULTURAL STAGE IN FRONT OF KHETURA KSHETRAPAL MANDIR BOOTH NO-285
UPGRADATION OF CEMENT CONCRETE ROAD FROM KHETURA HATI ROAD TO NAYAN SK HOUSE AT KHETURA BOOTH NO-279
CONSTRUCTION COVER DRAIN WITH VERTICAL SILT CHAMBER FROM SUREKALNA MOYRA PARA BENCHARAM DAS HOUSE TO MITRI PUKUR AT SUREKALNA
Operation Maintenance of Distribution System,Rising Main,Sluice Valves,including operation of sluice valves of Palason PWSS of Raina-I Dev.Block within Burdwan Sub-Divn. under Burdwan Division,PHE Dte period for 1(one)year
CONSTRUCTION OF COVER CONCRETE DRAIN FROM SAIFUL SK HOUSE TO MASJID TALA AT KHETURA BOOTH NO-279
113676657 Estimate for the Construction of Covered drain with Soak Pit from Dali House to Main Road at Sansad XIX Under SARAITIKAR Gram Panchayat Under Burdwan-I Dev. Block.
CONSTRUCTION OF COVER CONCRETE DRAIN FROM SK FARID HOUSE TO MOMEJAL SK HOUSE AT KHETURA BOOTH NO-279
UPGRADATION OF CEMENT CONCRETE ROAD FROM KHETURA HATI ROAD TO MAKHAN KHAN HOUSE AT KHETURA BOOTH NO-279
Operation Maintenance of Distribution System , Rising main, Sluice Valves, including operation of sluice valves Of Dewandighi-Mirjapur PWSS of Burdwan-I within Burdwan Sub-Division under Burdwan Division, PHE Dte Period for 1(one)year
Operation Maintenance of Distribution System,Rising Main,Sluice Valves,including operation of sluice valves of for Mugura PWSS of Raina-I Dev.Block within Burdwan Sub-Divn. under Burdwan Division,PHE Dte period for 1(one)year
UPGRADATION OF CEMENT CONCRETE ROAD FROM GALSI NH TO BHARAT KANTA VIA CANEL BANDH AT GALSI BOOTH NO-293
UPGRADATION OF CEMENT CONCRETE ROAD FROM KHETURA MILAN SHA HOUSE TO UTTAM SHA HOUSE AT KETURA BOOTH NO-279
INSTALLATION OF HIGHMUST LIGHT IN FRONT OF DAYALPUR TENTUL TALA BOOTH NO-287
INSTALLATION OF HIGHMUST LIGHT AT DAYALPUR MORE JANAJA PLACE BOOTH NO-287
INSTALATION OF SOLAR LIGHT AT SIKARPUR GHOSH PARA
Operation Maintenance for pipeline of Burdwan University (Tarabag-Z-I II, Golapbag Z-I II, Hostel campas Zone) water supply scheme under Burdwan Division, PHE Dte. For the period of 06 (Six) month from
Construction of 3 nos. vertical filter chambers at Guir Gram (Guir 122 No ICDS, Guir Das Para and Near Kalitala of Guir Cannel Bandh), benefiting 725 residents,APAS/01/259/248/0003
INSTALATION OF 3 NOS. SOLAR LIGHT AT DUMUR LOHAR PARA
INSTALLATION OF HIGH MAST SOLAR LIGHT IN FRONT OF KETNA JUNIOR HIGH SCHOOL KALITALA BAZAR
INSTALLATION OF HIGH MAST SOLAR LIGHT AT BADAGACHI TEA HOUSE KUKUR DANGA
Mon Mohan Dey Road from 0.00 Kmp to 1.00 kmp, Patch Repairing Work under Burdwan Division, P.W.D. during the year 2026-2027.
Installation of 5nos cages for plastic waste at Guir Daspara, Guir Bus stand, Mahaprabhu Tala, Napit Para and Kalitala under guir village benefiting 600 residents,APAS/01/259/248/0004
INSTALLATION OF HIGH MAST SOLAR LIGHT AT JUJUTI PURBA GHOSHPARA DURGATALA
INSTALLATION OF HIGH MAST SOLAR LIGHT AT JUJUTI RASHTALA
CONSTRUCTION COVER DRAIN WITH VERTICAL SILT CHAMBER FROM SUREKALNA MOYRA PARA BENCHARAM DAS HOUSE TO MITRI PUKUR AT SUREKALNA
INSTALLATION OF SOLAR LIGHT AT TAHERPUR SHIBTALA
INSTALATION OF 3 NOS. SOLAR LIGHT AT GOPALPUR RUIDAS PARA