Loading…
Loading…
304 results • Latest
Repairing of 160 mm dia HDPE pipeline inter connection for Veti village, Repairing of damaged 180 mm dia HDPE pipeline in Murulia village and other allied works under Ramchandrapur W/S Scheme under Raghunathpur Sub-Divn. under Purulia Division PHE
Daily Operation Mtc. of Rising Main all Distribution System, sluice valve, street stand post etc. under Rangamatia W/S Scheme under Raghnathpur Sub-Division, P.H.E. Dte. (w.e.f. 01-09-2026 to 31-08-2027)
Daily Operation mtc. of rising main all distribution system, opening closing of sluice valves with all allied works related to water supply under Santuri W/S Scheme of Raghunathpur Sub-Division under Purulia Division, P.H.E. Dte. (w.e.f. 01-09
Daily Maintenance for Beautification of existing gardens and all vacant places within the residential compound at Lakshmanpur WTP of Raghunathpur water supply Project within Raghunathpur Sub-Division under Purulia Division, P.H.E.Dte. (w.e.f. 01-09-2
Daily Operation Mtc. of Distribution system, sluice valve, community stand post under Arra W/S Scheme under Raghunathpur Sub-Division, P.H.E. Dte. (Zone-II) (w.e.f. 01-09-2026 to 31-08-2027)
Daily Operation Mtc. of Rising Main all Distribution System, sluice valve, Community stand post etc. under Saltore-Hijuli W/S Scheme under Raghunathpur Sub-Division, P.H.E. Dte (w.e.f. 01-09-2026 to 31-08-2027)