Loading…
Loading…
221 live116 closing this weekmost from Directorate of Local Bodies UP and U P Irrigation Department (Civil)
221 results • Latest
Construction of an RCC covered drain from the Bus Stop to the old petrol pump in Ward No 07
Construction of an RCC covered drain from the police booth to the sewage drain in Bhitarigaon Ward No 10
Housekeeping, Cooking, serving of food in Worker Canteen of MCF for the period of two years (two shifts per day) as per scope of work.
Entry and Mid Level Laptop - Notebook (Q2) (3 (3 ))
Catering Service per Packet based - Veg; Sweet Box; Buffet(Breakfast/Lunch/Dinner), Catering Service per Packet based - Non-Veg; Sweet Box; Buffet(Breakfast/Lunch/Dinner)
Global Tender Category (Q3)
13 Nagar Panchayat Nasirabad me Jais Mukhya Marg se Hafiz Abubaqar Hotel se Shabaaz Fashion ke Dukan Hote huye Pappu Maurya Ke Makaan se Naala Tak Ghari Nali Ka Nirmaan Karya.
12 Nagar Panchayat Nasirabad me Naka Mod se Haroon Ke Ghar Hote Huye Talab Tak Naala Nirmaan Karya.
11 Nagar Panchayat Nasirabad me Prahlad Traders ke Paas se Shani Dev Mandir Tak Naali Nirmaan Karya.
10 Nagar Pancahayat Nasirabad me Ward No-04 Plant ke Paas Puliya Talab tak Nala ka Nirman Karya.
08 Nagar Panchayat Nasirabad Ward No-01 Naka se Shreef Ke makaan Tak Nala Nirman Karya.
09 Nagar Panchayat Nasirabad me Aspatal ke paas se bypass Tak Nala Nirman Karya.
07 Nagar Panchayat Nasirabad Ward no-01 Mohalla Naka Me Pappu ke Lakdi Ke Taal Ke Paas Se Nala Tak Naala Nirman Karya.
06 Nagar Panchayat Nasirabad me Jais Mukya Marg Royal Telers Ke paas Se Manshram Ki Dukaan Tak Naali Nirman Karya
05 Nagar Panchayat Nasirabad me Ramraj Chaurahe hote Huye Post Office tak Naali Nirmaan Karya.
04 Nagar Panchayat Nasirabad Ward No-01 Bagrahi me Mukhya Marg se Ramautar Ke Ghar Tak Naali Ka Nirman Karya.
03 Nagar Panchayat Nasirabad Ward No-01 Bagrahi me Azaad Ke Ghar Se Hneef Ke Ghar Tak Naali Ka Nirman Karya.
02 Nagar Panchayat Nasirabad Ward No-01 Mauhariya me Nala Ke Paas Syame Ke Ghar Tak Naali Ka Nirman Karya
01 Nagar Panchayat Nasirabad Ward no-01 Mauhariya me Suresh ke Ghar se Ashok Ke Ghar Tak Naali Ka Nirman Karya.
03 Nagar Panchayat Nasirabad Ward No-1 se 12 tak Payjal Vyavastha Sugam Banane Hetu Boring with 1000 Ltr Water Tank ke Adhisthapan ka Karya.
01-Nagar Panchayat Nasirabad Ward No-06 me 10 HP Boring ke Adhisthapan Ka karya.
04 Nagar Panchayat Nasirabad Vibhinn Ward avam Pramukh Sthalo par payjal Vyavastha Sugam Banane hetu Boring Va Tatsambandhi Karya.
02 Nagar Panchayat Nasirabad me Pay Jal Vyavastha sugam banane hetu ward no-04,12,15 par pipeline va tatsambandhi karya.
Non Adherent Dressings (V2) (Q2)
Construction work of CC road and curbing from Lalganj Bachrawan contact route to the cremation site (up to in front of the Muslim cemetery) under Nagar Panchayat Bachrawan
Installation work of Highmask Light at the bus stop (Lalganj Turn) on Lucknow Prayagraj road under Nagar Panchayat Bachhrawan
Construction work of the CC road and covered drain from Ram Shankar Kushwahas house to Manoj Pandeys house via Ashish Shuklas house behind the Degree College in Ward No. 08 Chandika Nagar
Construction work of rubber-mold interlocking and plastering on the side pavement from Lucknow Prayagraj Highway (Kavya Enterprises) to Ramraj Chaudharys house in Ward No. 04 Kooti locality
Road Safety work at Raebareli Dalmau Fatehpur Road (Bhartiya Ayurvigyan Sansthan (AIIMS)
Road Safety work at Bilgram Unnao Prayagraj Road (Aryandeep Inter Collage)
Road Safety work at Dalmau Jagatpur Salon Road (Shanti Manohar Inter Collage)
Road Safety work at Bilgram Unnao Prayagraj Road (Maharaja Agrasen Inter Collage)
Road Safety work at Bilgram Unnao Prayagraj Road (Adarsh Inter Collage)
Road Safety work at Dalmau Jagatpur Salon Road (Bhagirathi Inter Collage)
Blood Collection Monitor (V2) (Q2)
Balance work for servicing and repairing of Vacuum Circuit Breakers (VCBs) and Air Circuit Breakers (ACBs) in the Electrical Substation at MCF/RBL premises.
Radiofrequency Generator with Vessel Sealing and Bipolar Resection (Q3) ( PAC Only ) (3 (3 ))
POLY ALUMINIUM CHLORIDE LIQUID
MANUFACTURE & SUPPLY OF 1.0 Cusec (102 M³/HOUR) DISCHARGE CAPACITY 15 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.0 Cusec (102 M³/HOUR) DISCHARGE CAPACITY 18 M HEAD SUBMERSIBLE PUMPSET, MANUFACTURE & SUPPLY OF 1.0 Cusec (102 M³/HOUR) DISCHARGE CAPACITY 21 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.0 Cusec (102 M³/HOUR) DISCHARGE CAPACITY 24 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.0 Cusec (102 M³/HOUR) DISCHARGE CAPACITY 27 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.0 Cusec (102 M³/HOUR) DISCHARGE CAPACITY 30 M HEAD SUBMERSIBLE PUMPSET, MANUFACTURE & SUPPLY OF 1.0 Cusec (102 M³/HOUR) DISCHARGE CAPACITY 33 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.0 Cusec (102 M³/HOUR) DISCHARGE CAPACITY 36 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.0 Cusec (102 M³/HOUR) DISCHARGE CAPACITY 42 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.0 Cusec (102 M³/HOUR) DISCHARGE CAPACITY 48 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.0 Cusec (102 M³/HOUR) DISCHARGE CAPACITY 54 M HEAD SUBMERSIBLE PUMPSETS
MANUFACTURE & SUPPLY OF 1.5 Cusec (153 M³/HOUR) DISCHARGE CAPACITY & 15 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.5 Cusec (153 M³ HOUR) DISCHARGE CAPACITY & 18 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.5 Cusec (153 M³ HOUR) DISCHARGE CAPACITY & 21 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.5 Cusec (153 M³ HOUR) DISCHARGE CAPACITY & 24 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.5 Cusec (153 M³ HOUR) DISCHARGE CAPACITY & 27 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.5 Cusec (153 M³ HOUR) DISCHARGE CAPACITY & 30 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.5 Cusec (153 M³ HOUR) DISCHARGE CAPACITY & 33 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.5 Cusec (153 M³ HOUR) DISCHARGE CAPACITY & 36 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.5 Cusec (153 M³ HOUR) DISCHARGE CAPACITY & 42 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.5 Cusec (153 M³ HOUR) DISCHARGE CAPACITY & 48 M HEAD SUBMERSIBLE PUMPSETS
Construction of 01 Nos of Borewell in east colony for filling tanks.(Balance work estimate)
Laparotomy Instruments Set
Custom Bid for Services - 200158473 Testing of Primary Frequency Response & AGC at NTPC Unchahar Stage-I II III 5 X 210 MW and Stage-IV 1 X 500 MW as per IEGC 2023 guidelines Similar Category Operation and Maintenance Power House/Power Plant
Nitrogen, Compressed Gas and Liquid conforming to IS 1747 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Skin Tensioning, Stage-IV and Grinding activities of MEMU, Train set and LHB coaches and Fitment and welding of SS trough as per scope of work.
Purchase of Dual Wavelength Diode Laser Pulse