Loading…
Loading…
110 results • Latest
Assessment of Ash volume of Ash Bund 1 & 2 and detailed survey of Ash bund 1 & 2 connecting roads, existing structures, silos and Nalas surrounding Ash Bund 1 & 2 at RTPS.
SUPPLY, SITE FABRICATION AND ERECTION OF MANUAL STONE-PICKING PLATFORMS AT STRATEGIC LOCATIONS OF BELT CONVEYOR NUMBERS 2A, 2B, 2C AND 2D AT YTPS CHP AREA
Lowering & Leveling of Play Ground Backside Auditorium at College of Agriculture Kalaburgi.
Construction of RCC Drain Infront of College at College of Agriculture Kalaburgi.
Construction of Septic Tank and Pipe Line Work at A.C. Hagari.
Comprehensive Maintenance/Servicing of RO Plant installed opposite to Unit-4 UCB, Admin block and Green building for a period of one year & as per BID DOCUMENT