Loading…
Loading…
4,542 results • Latest
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Electrical System or Installation, SUPPLY OF ELECTRICAL SKILLED MANPOWER ON NEED BASIS; Service Provider
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others, Collection & Disposal Waste Management Service - Collection, Lifting, Transportation, Unloading; Dry Waste
5.1/2" CONVENTIONAL CEMENTING PLUG BOTTOM, 5.1/2" CONVENTIONAL CEMENTING PLUG TOP, CONVENTIONAL CEMENTING PLUG 7" BOTTOM, CONVENTIONAL CEMENTING PLUG 7" TOP, 95/8 IN CONVENTIONAL CEMENTING PLUG BOTTOM, 95/8 IN CONVENTIONAL CEMENTING PLUG TOP, 13 3/8 IN CONV CEMENTING PLUG BOTTOM, 13 3/8 IN CONVENTIONAL CEMENTING PLUG TOP, BOTTOM PLUG FOR 20" CSG, CEMENT PLUG RUBBER 9 5/8 INCH TOP HYDROGENATED NITRILE BUTADIENE RUBBER (HNBR), CEMENT PLUG RUBBER 9 5/8 INCH BOTTOM HYDROGENATED NITRILE BUTADIENE RUBBER (HNBR), CEMENT PLUG RUBBER 7 INCH TOP HYDROGENATED NITRILE BUTADIENE RUBBER (HNBR), CEMENT PLUG RUBBER 7 INCH BOTTOM HYDROGENATED NITRILE BUTADIENE RUBBER (HNBR), CEMENT PLUG RUBBER 9 5/8 INCH BOTTOM CONVENTIONAL, CEMENT PLUG RUBBER 9 5/8 INCH TOP CONVENTIONAL, CEMENT PLUG RUBBER 13 3/8 INCH BOTTOM CONVENTIONAL, CEMENT PLUG RUBBER 13 3/8 INCH TOP CONVENTIONAL, CEMENT PLUG RUBBER 5 1/2 INCH BOTTOM HPHT/HNBR, CEMENT PLUG RUBBER 5 1/2 INCH TOP HPHT/HNBR
Dirty oil transfer pumps for JSW Dolvi_ All items as per Annexure-3
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; REPLACEMENT OF PNEUMATIC PRDS, SH AND SM VENT CONTROL VALVES IN AMMONIA PLANT AT RCF THAL; Buyer
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Execution of various mechanical maintenance jobs (shutdown and non-shutdown jobs) in Ammonia plant; Buyer