Loading…
Loading…
4,560 results • Latest
Construction of RCC Boundary Wall at Mora Valve Station and Hardening of Area at Mora and South Sheva Valve Station.
SPECIAL REPAIRS FOR RPLACEMENT OF BER EOT CRANE OF RT STORE AT NAD KARANJA
COMP MAINT OF CONTROL PANELS DRIVERS GEAR TROLLY CHAIN PULLY BLOCK AND ALLIED WKS ALONGWITH REPAIR REPLACEMENT TO DOORS WINDOWS FLOORING AND RELATED BR WKS AT VARIOUS EM INSTALLATIONS AT COMMON AREA AND NAD AREA UNDER AGE BR II AT NS KARANJA
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; CONTRACT FOR OPENING, BOX UP AND INTERNAL INSPECTION JOBS OF BI-METALLIC TUBE STRIPPERS E-1 IN ALL THE THREE UNITS OF UREA PLANT AT RCF THAL; Buyer
GEARED MOTOR FOR BELT CONVEYOR DRIVE, RATING: HP/KW= (15/11), INPUT SPEED: 1500RPM, OUT PUT SPEED: 50R
STORAGE CONTAINER, STORAGE RACKS