Loading…
Loading…
4,538 results • Latest
Constructing concrete canal lining from Head regulator outlet to left bank canal and Right bank canals cross regulator gate of Panhalghar M.I. scheme Tal. Mangaon Dist. Raigad.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - ICGS C-4341; Sea water leakage observed from AC condenser pump discharge pipe line Defect to be rectified and proved for satisfactory operation Pipe line material SS Dia..
Gelling Agent (Ongc) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2026/B/7111550 Dated : 14-01-2026 Bid Document 1/10 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority CONCERNED ONGC INDENTOR Auto CRAC Days 60 Evaluation Method Total value wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause Yes ( Mediation clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 mediation clause should not be routinely included in contracts and pre- litigation mediation can be taken up without any such clause also Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 21 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. 2/10 Beneficiary : F&AO ONGC Ltd, Central Procurement Department, 8th Floor Scope Minar, Laxmi Nagar Delhi-110092 (Ongc)
Custom Bid for Services - 10000000 Similar Category Nucleic Acid Sequencing and Genotyping Service
Annual Maintenance Service - Photocopier Machine - Photocopier Machines ( Monochrome, Laser, Separate Drum & Tonner, Mid Range); Ricoh; OEM Authorised Service Provider
Custom Bid for Services - CAMC FOR BLUESTAR WATER COOLEDCHILLER MACHINES AT EIB KHARGHAR Similar Category Customized AMC/CMC for Pre-owned Products