Loading…
Loading…
4,679 results • Latest
DEVELOP NAMO UDYAN UNDER VAISHISHTPURN YOJANA FOR PALI NAGARPANCHAYAT
Deployment of 01no.100MT capacity Crawler Crane and 01no.80 MT capacity Crawler Crane with Limit Switch,Reverse Horn, Reverse Light, Load Switch, SLI etc.and with full configuration in complete in connection with Civil and Structural,UG Piping Work
SOV RO/UF VALVE BANK, SOV REPAIR KIT RO/UF VALVE BANK, SOV RO/UF VALVE BANK 531 series
Custom Bid for Services - Repair and Fabrication of Outer Drum of Floating Head Bouy of Club 3M-14E Besha Mock Up Article (Qty-02) Similar Category Repair and Overhauling Service
Provide JYM Equipment Grampanchayat Honad Tal Khalapur Dist Raigad
LIQUID HUMAN GROWTH HORMONE SOMATROPIN 10 MG PER 1.5 ML 30 IU PEN INJECTION
Custom Bid for Services - TOTAL PRICE INCLUDING APPLICABLE GST IN PLUS OR MINUS OR EQUAL TO WITH RESPECT TO GAILs TOTAL ESTIMATED AMOUNT AS PER SPECIFICATION AND QUANTITY SPECIFIED IN BOQ Similar Category ANNUAL MAINTENANCE SERVICE FOR Centralised air conditioning system Annual Maintenance service-AIR CONDITIONER Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System)
GLASS REFLEX LEVEL GAUGE 11/31E-5, GLASS REFLEX LEVEL GAUGE 21E-5
PROXIMITY SWITCH
Set of zinc plated & passivated Mild Steel Hex head bolts fully threaded of various sizes conforms to IS -1364 (Part 1): 2023 class 8.8 ( 1 set consist of following sizes) 1) M 5 x 35 -20 kg. 2) M 6 x
M and R to NPTL WSS...Repairs and overhauling including spares for 150/75/50 HP pumping machinery at RWW and PWW
cryoshipper
Construction of Road From Gavhadi Main Road to Datta Mandir at Kumbharde G.P Kumbharde Taluka Mahad II call
Construction of Road Towords Tamhane Jananidevi Temple at Tamhane G.P Tamhane Taluka Mahad, District Riagad. (Dongari)
One Year Maintenance and repairs (2025-26) to Purar Mhapral Khed road Km 0/000 to 11/200 Taluka Mangaon, District Raigad.
One Year Maintenance and repairs (2025-26) to Bagmandala Ambet Tol Veer Road SH. 100 Km 27/000 to 45/000 Taluka Mangaon, District Raigad.
One Year Maintenance and Repairs (2025-26) to Goregaon Vadvali Dahivali Morba Road MDR 64 Km 0/000 to 8/400 Taluka Mangaon, District Raigad.
One Year Maintenance and Repairs to Dhalghar Lonshi Unegaon Goregaon Chinchavli Devali Road MDR 86 Km 0/00 to 14/600 Taluka Mangaon, District Raigad.
One Year Maintenance and repairs (2025-26) to Kharavali phata Pen Usar Talegaon Road MDR 60 Km 0/00 to 18/960 Taluka Mangaon, District Raigad.
One Year Maintenance and Repairs to Dhalghar Hodgaon Gharoshi Road MDR 62 Km 4/700 to 10/200 Taluka Mangaon, District Raigad.
ACP sheet boards With G.I. Frame, ACP sheet boards, Sunboard printing, Vinyl printing, Rollup boards, Sandwich boards, Aluminum Standee, Photoframe, Digital colour Printout 100 GSM A4, Digital colour Printout 100 GSM A3, Digital colour Printout 250 GSM A4, Digital colour printout on 250gsm 12 8, Digital colour printout on sticker A4, PVC pouch lamination size- A4, PVC pouch lamination size- A3, Display-signboard, Flex printing 250 GSM, Flex printing 300 GSM, Board frames - Wooden, Board frames - G.I., Invitation Cards, Video clip, Certificates set of 10 no., Acrylic glowsign 5ft x 3ft, Acrylic engraving, Nightglow boards, Door Nameplate, D.O.Letter Set of 100 no., Visiting card 2 Color Set of 100 no., Visiting card 3 Color Set of 100 no.
Construction of Cement Concrete Lining work to Mangaon branch canal between ch.0/000 to ch.26/800 m, Morba branch canal between ch.0/000 to ch.15/150 m, Ashtami branch canal between ch.23/000 to ch.28/000 m under Kundalika Left bank canal, Also Recon
RAKE TEST RIG
Electric wire rope hoist
36 KW HEATER WITH VESSEL
Supplying skilled and unskilled labour to Roha Municipal Council
310023424, 310023425, 310023426, 300097867, 300097868, 300097869, 300130345
DIAPHRAGHM FOR BOOSTER PUMP
W90313396256 LEVEL INDICATORS FOR OIL TANKS LEVEL INDICATOR 0-1250 MM, W90313396132 LEVEL INDICATOR RANGE -750 MM TO+ 750MM
8 MM TMT, 10 MM TMT, 12 MM TMT, 16 MM TMT, 20 MM TMT
Horticulture Service - Lumpsum based - General Maintenance of Garden/Lawn/Field/Nursery/Park, Maintenance of Potted/Container Plant, Development of Garden/Lawn/Field/Nursery/Park, Landscaping of Garden Lawn/Field/Nursery/Park; Site Clearing, ..
M and R to Water Supply Scheme for Pen Alibaug Region... Annual maintenance of street lights provided on MIDC pipe line service road and approach road.
M and R to WSS for Pen Alibag Region and Nagothane Indl. Area... Providing Annual Maintenance Services and Providing, Installing and Testing of software upgradation for existing installed electromagnetic flow meters at various locations....
khopoli nagarparishad hadditil chinnamay nagar yethe udyan vikasit karane
Multilayered Cross Laminated Sheets/Tarpaulins/Covers Agricultural Films conforming to 14611 (Q3)
Custom Bid for Services - TOTAL PRICE INCLUDING TOTAL SERVICE CHARGES FOR 02 YEARS AND APPLICABLE GST WHICH SHALL BE NECESSARILY EQUAL TO OR MORE THAN GAILs TOTAL ESTIMATED AMOUNT AS PER SPECIFICATION AND QUANTITY SPECIFIED AT BOQ Similar Category Support Services
Construction and operationalize a Clock Tower within the jurisdiction of Roha Ashtami Municipal Council
Develop Namo Udyan under the Vaishishtyapurna Yojana for the Roha Ashtami Municipal Council
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Repair, bare inspection and annual inspection of Auxiliary Boiler in Ammonia Plant Line-II at RCF, Thal unit; Buyer
SITC of CCTV surveillance system for Shanti Sadan Building at ACTREC Campus
Canal Lining work ch. 0/000 to 9/880, Construction of Supper Passage structure at Ch. 5/050, 6/580, 6/730, 6/879, 7/620, 8/892. 9/516 and Recostruction of HPD drain wall at Kundalika Left Bank Canal Ta. Roha Dist Raigad. Under Maharastra Irrigation
ISMC 100, ISA 75 x 75 x 8, LADDER RUND 25 MM DIA. ROUND BAR, 24 MM DIA. ROUND BAR, 16 MM DIA. ROUND BAR, LADDER RUND 20 MM DIA. ROUND BAR, ISA 65 x 65 x 6, ISMC 150, ISMC 300, ISMB 200, ISMB 150, ISA 50 x 50 x 6, Plate- 20 mm Thk., Plate- 16 mm Thk, Plate- 12 mm Thk., Plate- 10 mm Thk.
Construction of Entrance Canopy and Opening of 3rd Entrance Gate near SSPCC Building at ACTREC
Construction of Toilet Block near MTDC area at Raigad Fort, Tal. Mahad, Dist. Raigad.
Construction of Two New Class Room R.Z.P. School at.Sahan V.P. Sahan Tal.Alibag Dist.Raigad
grinding paper grit no. 120, hacksaw blade, wire copper flexible 1c into 1 sqmm lt, wire copper flexible 1c into 2 point 5 sqmm, wire copper flexible 1c into 4 sqmm lt, led tube light with fixutre 40 w white, cable tie 150 into 3.6mm, cable tie 200 into 3.6mm, cable tie 300 into 4.8mm, insulation tape black, insulation tape blue, insulation tape red, m c b 10 amp 1p, m c b 16 amp 1p, switch 10 amp roma, led tube light with fixutre 20 w white
uniform cloth1, uniform cloth2, uniform cloth3, uniform cloth4, uniform cloth5, uniform cloth6, uniform cloth7, uniform cloth8, uniform cloth9