Loading…
Loading…
1,124 live455 closing this weekmost from South East Central Railway and Urban Administration and Development Department (UADD)
1,124 results • Latest
जोन क्र.-3 अंतर्गत वार्ड क्र.- 30 प्रगति नगर के अंतर्गत अन्नपूर्णा मार्केट, आदर्श मार्केट एवं जीई रोड के पास के क्षेत्र में प्रगति नगर के अंतर्गत बसंत टॉकीज के पीछे से जलेबी चौक तक संजू कोल डिपो से नेहरु चौक, एकता नगर, शांतिपारा में सीसी रोड एवं नाली निर्माण कार्य कवर सहित।
Set of Must Change Items for Traction Link Bar as per Annexure A
Procurement of KBL CW MAKE UP WATER PUMP ST-2 by MMD OFS at NTPC TalcherKaniha
POH kit for 203 mm BOGIE MOUNTED AIR BRAKE CYLINDER
BRAKE GEAR PART BELL CRANK LEVER ASSEMBLY
Vinyl coated upholstery febric (Artificial leather) for AC Coaches
Renewal of CBRC with Ms Diamond Power Speciality Ltd. for Supply of Soot Blower, LRSB, HRSB and APH Soot Blower Spares on OEM OES Basis for NTPC Stations
"KIT FOR CUT OFF ANGLE COCK"
Procurement of required spares of UNIT-5 GE make 660 MW Generator atNTPC Tanda for maintenance of H2 Coolers
Cast Steel Side Frame (With 'K' Class Narrow Pedestal Jaw) for LWLH25 Bogie As per Drawing No.WD15021-S/03, Alt-5
Procurement of Collins feedback Tx for starting device speeder gear LPBYPASS and EHTC Main Turbine for NTPC VSTPP
IOH kit for overhauling of energy cum speed Recorder, speed Indicator,
Set of Earthing shunt consists of 02 items in 02 Nos. Overall
Procurement of Two (02) Nos Bauer Geared Motors for Bunker Trippers 1 23 and 4 at NTPC Bongaigaon
(Old PL: 17982170) SIDE WINDOW SHUTTER GLASS SET (LEFT & RIGHT) Set consists of 13 items, EMD PT. No.10647930 & 10647931, DLW PT. NO.17045204 & 17045216 as per Drg.No. EMD PT. No.10647930 & 1064793 specn: EMD PT. No.10647930 & 1064793
Procurement of ROTATING ASSY KBL PUMP 10UPH3 for ash dyke TSTPS
Procurement of Wet ball mill liners for FGD at NTPC solapur
Upgradation works of plant area CCTV System against obsolescence (Supply, Installation and Commissioning of IP based CCTV system) for NTPC Bongaigaon
Procurement OF CCI SPARES Non-RC for HP LP Bypass systems at NTPC Kudgi.
Procurement of Inductive Sensor and SPEED MONITOR for HPLOP of mill sinstalled at NTPC Gadarwara
R and M Proposal for Drag/Energy Chain for Paddle Feeders and Stacker Reclaimers, Stage-1 CHP at TSTPS Kaniha
PROCUREMENT OF SPARES FOR GOODWIN MAKE SUBMERSIBLE SLURRY PUMP FOR ASH HANDLING DEPARTMENT AT NTPC DARLIPALI
CS as IE during Operation and Maintenance for supervision of 6L Korlam-Sabbaavram from Km.421.100 to Km.445.100 (Pkg-03) from Km.445.100 to Km.464.662 sec. of NH-130CD under Raipur Visakhapatnam EC in the state of AP on Hybrid Annuity Mode.
रमण मंदिर वार्ड क्रण् 14 अंतर्गत राउतपारा एवं हर्राबाड़ा में सीण्सीण् रोड एवं नाली निर्माण कार्य।
Hydraulic Dampers Vertical for Conventional Locomotives
Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 40 KL capacities & staging 12 mtr. including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber, & Providing, laying, jointing, interconnection, testing and commissioning of 90 mm dia PVC class 10 kg/sqcm 200 mtr, 90 mm dia PVC class 6 kg/sqcm ............ 0mtr, 100 mm dia GI pipe 24mtr with suitable joints valve specials and all fittings including all allied civil works, Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.4 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , sump well for submersible pump, construction of chlorinator room of size 2.4*2.4*3.0 mtr, providing functional household tap connection (F.H.T.C) in individual households and government institution etc. complete with trial run operation & maintenance for 06 months under Retrofitting of Water Supply Scheme under Jal Jeevan Mission For Village Saragaon, Block Dharsiwa District – Raipur. (balance work)
Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 125 KL capacities & staging 12 mtr. including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber, Construction of 25 K.L. R.C.C. Sump well & Providing, laying, jointing, interconnection, testing and commissioning of 90 mm dia PVC class 10 kg/sqcm 500 mtr, 90 mm dia PVC class 6 kg/sqcm 2000mtr, with suitable joints valve specials and all fittings including all allied civil works , Supplying & Installation of Energy efficient five star BEE rating ISI Marked required capacity single phase, 50 Hz, 415V, deep well submersible pump Steel body, suitable for 6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, single phase preventer, connections, including clamps, bore cap etc. as required as per specifications but excluding pipe connection cable including verification of tubewell yield & Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.4 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , sump well for submersible pump, construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection (F.H.T.C) in individual households and government institution etc. complete with trial run operation & maintenance for 06 months under Retrofitting of Water Supply Scheme under Jal Jeevan Mission For Village Tulsi (Neora), Block Tilda District – Raipur. (balance work)
Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 60 KL capacities & staging 12 mtr. including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber, Construction of 25 K.L. R.C.C. Sump well & Providing, laying, jointing, interconnection, testing and commissioning of 90 mm dia PVC class 10 kg/sqcm 700 mtr, 110 mm dia PVC class 6 kg/sqcm 542mtr, with suitable joints valve specials and all fittings including all allied civil works , Supplying & Installation of Energy efficient five star BEE rating ISI Marked required capacity single phase, 50 Hz, 415V, deep well submersible pump Steel body, suitable for 6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, single phase preventer, connections, including clamps, bore cap etc. as required as per specifications but excluding pipe connection cable including verification of tubewell yield & Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.4 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , sump well for submersible pump, construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection (F.H.T.C) in individual households and government institution etc. complete with trial run operation & maintenance for 06 months under Retrofitting of Water Supply Scheme under Jal Jeevan Mission For Village Tila, Block Abhanpur District – Raipur. (balance work)
Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 50 KL capacities & staging 12 mtr. including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 90 mm dia PVC class 10 kg/sqcm 88 mtr, 110 mm dia PVC class 6 kg/sqcm 92mtr, 100mm dia GI pipe 24mtr with suitable joints valve specials and all fittings including all allied civil works, Electric connection from CSEB, construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , providing functional household tap connection (F.H.T.C) in individual households and government institution etc. complete with trial run operation & maintenance for 03 months under Retrofitting of piped Water Supply Scheme under Jal Jeevan Mission For Village Tarra, Block Dharsiwa District – Raipur. (balance work)
Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 150 KL capacities & staging 12 mtr. including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 90 mm dia PVC class 10 kg/sqcm 0 mtr, 110 mm dia PVC class 6 kg/sqcm 0 mtr with suitable joints valve specials and all fittings including all allied civil works, Supplying & Installation of Energy efficient five star BEE rating ISI Marked required capacity single phase, 50 Hz, 415V, deep well submersible pump Steel body, suitable for 6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, single phase preventer, connections, including clamps, bore cap etc. as required as per specifications but excluding pipe connection cable including verification of tubewell yield & Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.4 mtr, construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection (F.H.T.C) in individual households and government institution etc. complete with trial run operation & maintenance for 06 months under Retrofitting of Water Supply Scheme under Jal Jeevan Mission For Village Godhi, Block Arang District – Raipur. (balance work)
Construction of 25 K.L. R.C.C. Sump well & Providing, laying, jointing, interconnection, testing and commissioning of 90 mm dia PVC class 10 kg/sqcm 509 mtr, 110,160 mm dia PVC class 6 kg/sqcm 38mtr 25mtr, with suitable joints valve specials and all fittings including all allied civil works , Supplying & Installation of Energy efficient five star BEE rating ISI Marked required capacity single phase, 50 Hz, 415V, deep well submersible pump Steel body, suitable for 6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, single phase preventer, connections, including clamps, bore cap etc. as required as per specifications but excluding pipe connection cable including verification of tubewell yield & Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.4 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , sump well for submersible pump, construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection (F.H.T.C) in individual households and government institution etc. complete with trial run operation & maintenance for 06 months under Retrofitting of Water Supply Scheme under Jal Jeevan Mission For Village Hasda, Block Abhanpur District – Raipur. (balance work)
13 Pin UIC coupler plug assembly with contact pin consists of I .3 meters cables and plyamide hose with UIC plug on both ends as per RDSO modification sheet No. RDSO/PE/MS/AC/0051-2011 Reva. Note Ulc plug as per CLW drawing No. CLW/ES/3/SK- 4/0047/E similar to Schatbau part No. Ulc ST 13 P EO D2 and conduit as EEr RDSO specification RDSO/PE/SPEC/AC-0138-2009 Reva or latest.
Procuerment of fine chemicals at NTPC Ramagundam
CONSTRUCTION OF SAMUDAYIK BHAWAN IN GRAM PANCHAYAT SIKOSA (KHUMBHKAR PARA), IN GRAM PANCHAYAT IRRAGUDA (AABADI PARA), IN GRAM BORI (KASAHIKALI), IN GRAM PANCHAYAT BELODI (JHARIA MAHAR-MAHARA PARA) UNDER BLOCK-GUNDARDEHI CONSTRUCTION OF COVERED SHED WITH PLATFORM IN AADIM JAATI SEVA SAHKARI SAMITI SURREGAON, FARADPHOD, PAPRA, C.B NAVAGAON BLOCK- DAUNDILOHARA AND IN SEVA SAHKARI SAMITI PARASTARAI,KODEWA,BHILAI,GUNDARDEHI,KACHANDUR,PENDRI,RAHUD, PINKAPAR AND BARBASPUR IN BLOCK- GUNDARDEHI, KRISHI UPAJ MANDI SAMITI - BALOD, DISTT- BALOD
CONSTRUCTION OF SAMUDAYIK BHAWAN IN GRAM PANCHAYAT TILODA , IN GRAM KHURSIPAR (GODELA), IN GRAM BARBASPUR (JEVARTALA), IN GRAM PANCHAYAT BHARDAKHURD( NAIPARA), IN GRAM PANCHAYAT SIRRI ( SATNAM PARA), IN GRAM PANCHAYAT SIKOSA ( CHANDRAKAR PARA), IN GRAM BAMHANI( CHIRCHAR MARAR PATEL PARA), IN NAGAR PANCHAYAT ARJUNDA( YADAV PARA), IN GRAM PANCHAYAT KANDUL( KALAR SINHA PARA), IN GRAM PANCHAYAT CHICHALGONDI (YADAV PARA) UNDER BLOCK- GUNDARDEHI AND CONSTRUCTION OF SAMUDAYIK BHAWAN IN GRAM KANYADABRI (SAMBALPUR), IN GRAM PANCHAYAT BHUDKHUSRA (KURMIPARA), IN GRAM PANCHAYAT BHIMKANHAR( SAHU PARA), IN GRAM PANCHAYAT BHURKABHAT, IN GRAM PANCHAYAT DENGRAPAR (SAHU PARA) UNDER BLOCK DAUNDILOHARA, KRISHI UPAJ MANDI SAMITI - BALOD, DISTT- BALOD
CONSTRUCTION OF CEMENT CONCRETE ROAD AND DRAIN FROM BHARAT KIRAYA BHANDAR TO PUNJAB BOOT HOUSE, FROM BATRA JI HOUSE TO KASHIRAM NAGAR SEWER BESIDE GURVINDER SINGH CHADDA HOUSE, FROM BATRA JI HOUSE BACK SIDE TO JASSI RANDHAWA HOUSE, FROM MANJEET SINGH SALUJA HOUSE TO WADHWANI JI HOUSE IN WARD NO. 48 GURUGHASIDAS ZONE NO- 03. AND INFRONT OF MARUTI DAIRY,KATORA TALAB, AND FROM HANUMAN MANDIR ARVIND NAGAR BASTI TO PENSION BADA ANGANBADI , FROM DURGA MANDIR TO SIGN BOARD MAIN ROAD IN PUNJAB COLONY, FROM DURGA MANDIR TO RAM JANKI MANDIR IN PUNJABI COLONY IN WARD NO-57 , ZONE NO-04 AND IN ZONE NO-06, WARD NO-59, CONSTRUCTION OF C.C ROAD BEHIND RAJDHANI HOSPITAL, AND IN WARD NO-62 AT C.G NAGAR, AND IN WARD NO-58 FROM VAASNA LANE TO NANDU KIRANA STORE, AND CONSTRUTION OF DRAIN FROM DHIRAJ SHRIVASTAV HOUSE TO NAGAR NIGAM CORPORATOR AASIF OFFICE , AND CONSTRUCTION OF C.C ROAD FROM JAITKHAM TO LAVANYA THREAD HOUSE . AND IN ZONE NO- 05 WARD NO 41 CONSTRUCTION OF CEMENT CONCRETE ROAD AND CULVERT AT SUNDAR NAGAR IN NAGAR NIGAM AREA RAIPUR DISTT-RAIPUR
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM NAKUL NISHAD HOUSE TO TOWARDS MUKTIDHAM IN GRAM NAHANDA, FROM BAZAR CHOWK TO TOWARDS JAI STAMBH IN WARD N0. 09/16 GRAM TAVERA, VAROIUS STREET IN GRAM PANCHAYAT HARANSINDHI (KASAUNDA), VARIOUS STREET IN GRAM SANKARI, VARIOUS STREET INFRONT OF PANCHAYAT BHAWAN IN GRAM DONGITARAI, SADAK PARA IN GRAM IRAAGUDA AND IN GRAM BAELODI. CEMENT CONCRETING WORK NEAR GAUTHAN IN GRAM PARSADA (DANG) AND IN STREETS INFRONT OF AABADI PARA MANCH IN GRAM CHAUREL. AND CONSTRUCTION OF SHED IN FRONT OF MANCH IN GRAM KHUTERI AND IN FAIR GROUND MUKT VATIKA IN GRAM SIKOLA. CONSTRUCTION OF COVERED SHED WITH PLATFORM IN SEVA SAHKARI SAMITI PAIRI, BHATAGAON(B) IN BLOCK- GUNDARDEHI , KRISHI UPAJ MANDI SAMITI - BALOD, DISTT- BALOD
Manpower Outsourcing Services - Minimum wage - Unskilled; Middle School; Others, Manpower Outsourcing Services - Minimum wage - Skilled; High School; Others, Manpower Outsourcing Services - Minimum wage - Highly- Skilled; Graduate; Others
Advanced Thermal Computer To Plate Setter Machine With Workflow Software
Monthly Basis Cab & Taxi Hiring Services - MUV; 1200 km x 208 hours; Outstation
All in One PC (V2) (Q2), A4 and Legal Size Multifunction Printer (MFP) (Q2), Line Interactive UPS with AVR (V2) (Q2), Scanner (V3) (Q2), Computer Printer (V2) (Q2) (3 (3 ))
Handling, Transport and Other Mining Services - Percentage quote based - Handling Service
Emergency Recovery Trolley (V2) (Q2)