Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
681 results • Latest
AME for year 2025-26 of road from Kolliganahalli to Hejjala Dodderi via Bidadi Bannikupe Ch 13.00 - 20.00km in Bidadi hobli, Ramanagara Taluk ( Ch 0.00 - 20.00Km) (Overlap Ch 10.70-13.00Km)
Laying of pipeline at ward no 22 thimmegowdanadoddi shmashana to milk dairy in limits of tmc bidadi
AME for the PWD Division Office in Ramanagara Taluk for the year 2026-27
AME for the PWD No 1 Subdivision & Special Subdivision Office in Ramanagara Taluk for the year 2026-27
Annual maintenance of PWD Special sub-division Ramanagara office Building for the Year 2026-27
GIS spares for CB available at Bidadi GIS and N2 booster
Road safety works of the Major District Roads of Maralawadi hobli, Harohalli Taluk for the year of 2025-26
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) ( PAC Only ) ( ( 3 3 ))
AME of NH-75 Road of Chikkakalya Gate to Join Kudur-Shivagange road via Chikkakalya, Kamasandra, Sankighatta Cross, Narayanapura, Hadalinganapalya, Raghuvanapalya, Kaveraiahnapalya, Gangonahalli, Basavanapalya, Veerapura, Hulikal, Gundigere from Ch 6.00 to 10.00 Km, Ch 13.00 to 24.00 Km in Magadi Taluk for the year of 2026-27in Magadi Taluk.(CH 0.00 TO 24.00KM)
Providing and laying PVC Pipeline from Tank to Egg rice Naganna house in NES Badavane ward no-10 and from Sridevi Chathra to Mallappa house in ward no-15 at Hosadurga town
Annual maintenance for the year 2025-26 for road joining NH-75 to sogala joining NH-178 via solooru, nagashettihalli magadi ajjanahalli kootagal shyanuboganahalli ramanagara, Channapatna chikkamaluru valetopu, kudluru, malurupattana, sulleri, krishnapura, garakahalli ch.61.12km to 66.325km( total ch.61.12 km to 66.325km) in Channapatna taluk.
Construction of Anganawadi center in Yaganahalli Village Taggikuppe G.P, Magadi Taluk.
Post-Metric Girls Hostel, Kanakapura Town, BCWD-2321 Pending electrical work, installation of windows and plastering and construction of new dressing rooms in the auditorium already constructed here in Kanakapura Taluk
AME of year 2026-27 Construction of a Cross Drain at 14.00km on kanakapura- sangama State Highway (SH-92) in kanakapura taluk , Bengaluru South district .
Annual maintenance of Kanakapura Sub divison PWD Office in Kanakapura taluk, Bangalore South Dist
Annual Maintenance of Bridges for year 2026 -27 in Channapatna Taluk Bangalore south district for State Highway-190 Starting from Statehighway-33 to join Hadly circle near national highway-209 via Tubinakere, Aralapura,huluvadi,Byrapatna chakkere, ankushanhalli, krishnapura, iggaluru, Chandapura at Chainage 12.20 km and 11.80 km
Annual Maintenance of Kodihalli Quarters in Kanakapura Taluk Bengaluru South District in the year 2026-27
Annual maintenance of Sathanuru Inspection Bungalow in Kanakapura taluk, Bangalore South Dist
Annual maintenance for year of 2026-27 Channapatna Public works department subdivision SH Road safety works
AME of year 2026-27 Construction and Installation of road safety works on State Highways Kanakapura taluk,Bangalore south district.
Annual Maintenance and Other Repair work of Two Lifts of Bengaluru South (Ramanagara) Zilla Panchayath Bhavan
Man Power Agency for Collection of waste from all villages under Manchanayakanahalli Gram Panchayat and tranportation through vehicle to the waste disposal unit, and segregate wet waste and dry waste (for 05 months).
Drainage Desilting works in the villages of Rangegowdana Doddi, Bheemenahalli, Billakempanahalli, Maruthi Nagar, N.V.T. Colony, Juttanapalya, Dyavalingayya Palya, Hejjala, Thalakuppe, Chinne Gowdana Doddi, Pichchakuntara Palya, Gollarapalya, Manchanayakanahalli, Seshagirihalli, Ainorapalya, Poornanagar, and Hanumanthanagar, which fall under the jurisdiction of Manchanayakanahalli Gram Panchayat, Ramanagara Taluk.
Drainage Desilting works in the Scheduled Caste villages of Lakshmisagara, Ningayyanadoddi, Seshagirihalli Colony, and the Scheduled Tribe village of Hosadoddi, as well as Bhadrapura, Shyanumangala, Doddakuntanahalli, Parasinapalya, Baichohalli, Chikkabillakempanahalli, and Mandebayalu villages, of Manchanayakanahalli Gram Panchayat, Ramanagara Taluk.
Facility Management Services - LumpSum Based - Commercial; As per the tender notification; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Commercial; As per the tender notification; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Commercial; As per the tender notification; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Commercial; As per the tender notification; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Commercial; As per the tender notification; Consumables to be provided by service provider (inclusive in contract cost)
Raising of Plantation Work (including raising of Nursery) for ANR Model-03 (Maintenance of 14X20- 30 Seedlings and Raising of 14X20-30 Seedlings) in Pete Kurubarahalli to shyanubhoganahalli at Ramanagara Range During 2026-27
Raising of Plantation Work (including raising of Nursery) for ANR Model-03 (Maintenance of 10x16 -20 Seedlings and Raising of 10X16-20 Seedlings) at Siddadevarabetta SF-Annekaranahalli in magadi Range during 2025-26
Drain and Other Development works within the village limits on the road connecting Solur-Sogala(NH-75) in Magadi Taluk
Drain and Other Development work within the village limits From road joining the Bagepalli Halaguru State highway -94 via Homalammapete, Mangal on the Magadi-Kunigal road in magadi taluk
DEVELOPMENT OF WORK IN WARD NO.02,03,04 & 07 IN CMC LIMITS OF RAMANAGARA.
Construction of elephant proof barricading using used Rails along the boundary at haragadu daari to poojakere in kanakapura range during 2025-26
AME of the road State Highway No. 94,Bagepalli Halaguru Road via Channapatna Ramanagara Magadi chainage 195.00 km to 213.00 km in Kootagal Hobli of Ramanagara Taluk for the year 2026-27
Tender for laboratory chemicals Items
Tender for drugs Items
AME for the year 2025-26 of Sign Boards, Kilometer Stones, Hectometer Stones and other road Safety works on major district roads in Kasaba Hobli, Ramanagara Taluk
Construction of CC Road and Drain in Hosadurga Grama Panchayath Village Limit in Kanakapura Taluk.
Providing Irrigation facility by Drilling borewell in the land of Srinivasa Bin Late Hanumanthaiah in Yennagere village, Solur Hobli,Magadi Taluk.
Construction of CC Road and Drain in Surrounding of Villages in Chikkamuduvadi G.P, Kanakapura Taluk.
Rate Contract for a period of 02 (Two) years for Queue Management services for Pune, Nashik, Sindhudurg, Nanded, Ramanagara and Nizamabad GAs of MNGL
Construction of Ladies Lounge and Rest room for Government First Grade Womens Collage at Ramanagara in Bengaluru South District for Department of Collegiate and Technical Education (DCTE)
Rate Contract for a period of 02 (Two) years for Contract Staffing Services for Pune, Nashik, Sindhudurg, Nanded, Ramanagara and Nizamabad GAs of MNGL
Supply and Installation of LED Street lights in 01 to 23 ward at Hosadurga Town
All in One PC (V2) (Q2), A4 and Legal Size Multifunction Printer (MFP) (Q2), A3 Size Multifunction Printer (MFP) (Q2), Scanner (V3) (Q2) (3 (3 ))
Appointment of Project Management Consultant Services for the works of Construction of Medical College, 300 Beds Hospital Boys and Girls Hostel and allied facilities at Kanakapura in Bengaluru South District.
Plastering and flooring work for fish farming pond number-02 and pond number-03, 02 ponds at fish farming center, Kanakapura taluk, Bangalore South district