Loading…
Loading…
159 results • Latest
Replacement of damaged rubber buffer with damaged base frame of electromagnetic vibro-feeder of 120D, 120E, 120H of RandP gate along with feeding discharge chute of raw coal bunker of main plant of Kedla Washery.
Repairing/Reconditioning of Primary and Secondary Control of TSU of Hospital Colony Substation and also complete repairing of Capacitor Bank installed at Filter plant under Township Rajrappa Area
Complete repairing of 02 nos. take-up pulley (dia 1050X1150mm) of unit no. 303 and belt conveyor and 02 nos. snub pulley (dia 654X1150mm) of unit no. 304 belt conveyor of main plant of Kedla Washery.
Replacement of damaged deck plate,channel, angles after top and bottom frame with idler and replacement of new conv. belt, driving tail, 02 nos. bend, pulley adapter shaft sleeve changing, guide channel arrangement, replcmnt f 304 B/c of KW
Construction of 50 bedded Hostel Building at Residential Upgraded High School Gola, Ramgarh
Renewal of Insurance of 10 Nos. Dumpers of PVUNL, Patratu.