Loading…
Loading…
165 results • Latest
XLPE Cablefor Working Voltageuptoand Including1.1 KV Marked To IS7098 (Part1) (Q2)
Construction of RCC drain at Ward No.08 from RCD main road to via Bijulia Pond to Jara Tola Railway over bridge
Laying of paver block at Ward No.04 from Bazar Tand via Dinesh steel to Koiri Tola high school
Laying of paver block at Ward No.08 from RCD main road to via Bijulia Pond to Jara Tola Railway over bridge
Laying of paver block and construction of RCC drain at Ward No.03 from Saudagar Tola Chowk to Dusadh Tola Chowk
Construction of RCC drain at Ward No.04 from Bazar Tand via Dinesh steel to Koiri Tola high school
PROVN OF THREE PHASE 03 X 30 KVA ONLINE UPS WITH 1 HRS BACKUP FOR P-114 (OT) T-16 (ICU) AND ACUTE WARD ALONGWITH ALL ALLIED WORKS AND PROVN OF LIGHTING CONDUCTOR AT NEW OPD COMPLEX ALONGWITH EARTHING AT MH RAMGARH CANTT
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Bolero; Date of first registration of vehicle should not be more than 03 years from the date of opening of bid; 50, 000-75000 kms; A/C; 12
Wheeled Skid Steer Loader (V2) asper IS/ISO7131 (Latest) (Q2)