Loading
Loading…
Loading…
973 results • Recent activity
Patch repair work on SH, MDR, ODR roads under the Assistant Engineer-IVth 2nd call
Patch repair work on Village roads under the Assistant Engineer-Ist 2nd call
Under the Division work involves laying the mix received from the departmental hot mix plant for the renewal work of VR roads (labor work) 2nd call
Under the Division work involves laying the mix received from the departmental hot mix plant for the renewal work of SH, MDR and ODR roads (labor work).2nd call
SUPPLY OF EGGS FRESH AT SUPPLY POINT RAMPUR FOR THE PERIOD FROM 01 APR 2026TO 31 MAR 2027
SUPPLY OF VEG FRESH AND FRUIT FRESH AT SUPPLY POINT RAMPUR FOR THE PERIOD FROM 01 APR 2026 TO 31 MAR 2027