Loading…
Loading…
1,279 results • Latest
P/ Fixing iron jal from H/o Bharat to H/o Rajan and H/o Arun in Ward No 4 in MC Dharuhera.
Construction of Sub Health Centre at Village Manethi , Block - Khol , Rewari
CONST. OF SUB HEALTH CENTER AT VILLAGE KHARAGWAS BLOCK REWARI DISTT. REWARI SCHEME SUB HEALTH CENTER
Construction of Sub Health Center at Village Naya Gaon
Plain Copier Paper (V3) ISIMarkedto IS14490 (Q4) (PACOnly)
ANNUAL MAINTENANCE ESTIMATE FOR WATER SUPPLY SCHEME IN REWARI TOWN DISTT. REWARI FOR THE YEAR 2025-26 (PERIOD FROM 01.04.2025 TO 31.03.2026)
Construction of Boosting Station and Laying of Balance Distribution System
Sumakhera Laying of DI Rising Main for village Sumakhera Distt Rewari and all other works contingent thereto
Self - Contained Drinking Water Coolers (V3) as per IS 1475 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Calibrate Pressure gauge, Calibrate Diff PT, Calibrate pressure switch, Calibrate Press Transmitter, Calibrate Temp Transmitter, Calibrate dpt, Calibrate Level Transmitter, Calibrate Temp Gauge, Calibrate RTD sensor, Calibrate Test flow switch
Customized AMC/CMC for Pre-owned Products - Non- Comprehensive AMC of Safety PLC of ABB make and allied MB Lal works for 1 year at Rewari Terminal under Delhi State Office; ABB; Annual Maintenance Contract (AMC); As per scope of service in tender doc..
Construction of Rasta H/o Jagdish to Rakesh at Vill Pali Block Khol (VANGY)
Const. of Rasta From H/o Vinay Master to Community centre at village Bhandor Block Khol Distt Rewari
Construction of CHC Satnali along with Residential accommodation in Mohindergarh Distt. (Pdg. 11/.433KV only)
Shifting of HT/LT line due to road widening from Gudiyani to Surkhpur Tappa under op S/Divn Kosli during year 2025-2026.
Construction of CC Road of GYM Khana Club Road and Repairing/ Cleaning of Strom Water Line in Sector 4 MC Rewari
Installation of Sanitary Napkin vending machines in washrooms for lady advocates/litigants with complete facilities at Judicial Court at Rewari, Kosli and Bawal.
Annual maintenance estimate of Roads, Water Supply, Sewerage and SWD Scheme in Sector 9A,10and 11P Mahendergarh for the year 2025-26
Annual maintenance estimate of Water Supply Sewerage and SWD Scheme in Sector 19 Rewari for the year 2025 2026
Annual maintenance estimate of Water Supply Sewerage Scheme in Sector 3 Rewari for the year 2025 2026
Annual maintenance estimate of Master Water Supply Scheme in U/E Narnaul for the year 2025-2026
Construction work of Phase III and IV residential building (650Sqft. House (ST plus 4)(32 Nos.), 800Sqft. House (ST plus 4)(16 Nos.), 1300Sqft. House (ST plus 4)(32 Nos.) in Sainik School at Gothra Tappa Khori in Distt. Rewari (Pdg. chamber and pipe
Annual maintenance estimate of 5 MLD STP at Dharuhera for the year 2025-2026
Annual maintenance estimate of master road in urban estate Dharuhera for the year 2025 to 2026
Annual maintenance estimate of Water Supply, Sewerage Scheme in Sector-4A, Dharuhera for the year 2025-2026
Annual Maintanence Shopping Centre Sector 5 Rewari
Annual maintenance estimate of Water Supply Sewerage and SWD Scheme in Sector 18 Rewari for the year 2025 2026
CONSTRUCTION OF SULABH SAUCHALAYA, NEW COVERED SHED AND REPAIRING OF EXISTING COVERED SHED
Chandanwas Drilling of Shallow Tubewell and laying of DI pipe line Distt Rewari Laying of 100 MM DI pipe line 440 Mtrs and 195 Mtrs HDPE pipe line forvillage
Felling, Conversion of trees and transportation with stacking in depots at Rewari for the year 2025-26.
Purchase of Material Required for Making of Revolving Chair, Iron Almirah, Steel rack and Book shelf etc.
Main Internal pipe for Meter Gauge locomotives
Special Repair for 15 Nos. Retiring Rooms and Conference Room in Judicial Block in Mini Sectt. Complex at Nuh including cost of EI work (Pdg. Video Conferencing system and EI only)
Estimate for repair of Outlet Hodi and ramp portion at KM 4.500 of Tankri Disty.
The estimate has been prepared with the objective of expediting the Phase-I works of the main project and to ensure that the construction activities can be taken up without delay due to site constraints, water flow conditions, and accessibility issue
Personal Fall Arrest System-Full Body Harness Conformingto IS3521 (Part1) (Q3)
Estimate for laying pipeline and construction of Pump House for village Rajpura Khalsa
Const of S.H.C Kosli 1
Const of S.H.C Kosli 2
SUPPLYOF MATERIAL FOR FURNITURE MAKING for the year 2025-26.
Purchase of Sawn Timber for Making of Dual Desks at HFDC complex Rewari (Size specific).
Operation and Maintenance works of Bikaner-III Substation
Plain Copier Paper (V3) ISIMarkedto IS14490 (Q4)
Bhudla Estimate for Providing Water supply Facility in Plots of 100 Sqr Yards for the BPL Holders in Village Bhudla Distt. Rewari Laying of distribution system in BPL Colony of village Bhudla and all other works contingent there to
Khaleta and Mayan Laying of Pipeline in Dhanies Laying of 100 mm id DI pipeline in Dhanies of Villages Khaleta and all other works contingent there to
Rampura Estimate for Laying of Distribution System in balance streets of village Rampura District Rewari Laying of Distribution System in balance area of Rampura and all other works contingent there to
Estimate for Providing water supply facility in Plots of 100 SQR Yard for the BPL Basti in Village Tankri falls under Bawal Distt. Rewari Laying of 100 mm id DI pipeline in plots of Sqr yard of BPL Colony in village Tankri and all other works
Construction of PHC Building with residential accommodation at village Bisru in Distt. Nuh (Pdg. Additional main cable)
Planned Visit RMDS, Breakdown and Emer Visit RMDS, Addl Manday RMDS and BhRS, Planned Visit BRDS, Breakdown AND Emer Visit BRDS, Addl Manday BRDS AND TKRS, Planned Visit TKRS, Breakdown AND Emer Visit TKRS, Planned Visit BhRS, Breakdown AND Emer Visit BhRS, Planned Visit RRPS, Breakdown AND Emer Visit RRPS, Addl Manday RRPS, Planned Visit BRS, Breakdowm AND Emer Visit BRS, Addl Manday BRS AND MRS, Planned Visit MRS, Breakdown AND Emer Visit MRS, Planned Visit KRS, Addl Manday KRS
Annual maintenance estimate of Master Sewerage , Rewari for the year 2025-2026