Loading…
Loading…
2,545 results • Latest
REPAIR TO DRAIN, PATH AND HARD STANDING AND FENCING IN MD ACCN AT MIL STN DHANA.
TERM CONTRACT FOR ARTIFICER WORKS AT NCO ACADEMY IN DHANA MIL STN
Calcium Hypo Chlorite 65-70%, Copper sulphate powder, Poly Aluminium Chloride AC-100S, Dry Chlorine Granules 90%
Work of Maintenance of Hand Pump Only Labour and Loading Vehicle (12 Months) for repairing work of India mark II hand pump services of departmental technician (material will be supplied by the department) of the Block REHLIDistt Sagar
B.T. RENEWAL WORK IN DIFFERENT ROADS UNDER P.W.D SUB DIVISION BANDA LANGTH 14.00 KM PAC 455.00 LAKH (GROUP-II) 1. Dalpatpur Bara Road 3.00 KM, PAC 93.64 LAKH 2.Banda RH to Degree College Road 1.10 KM km, PAC 34.72 LAKH 3. Banda Baraytha Road KM
STRENGTHENING OF SEMRA ZINDA TO FOURLANE ROAD LENGTH-2.5 KM PAC 253.80 LAKH
B.T. RENEWAL WORK IN DIFFERENT ROADS UNDER P.W.D SUB DIVISION BANDA LANGTH 18.30 KM PAC 488.28 LAKH (GROUP-I) 1. Budakhera Shahpur Road 6.30 KM, PAC 135.54 LAKH 2.Banda Bandri Road KM 11 to 16, PAC 186.70 LAKH 3. Banda Shahpur Parsoriya Road 6.00
DISMANTLLING AND CONSTRUCTION OF DRAIN COVER NEAR MAKRONIA
CONSTRUCTION OF R.C.C DRAIN IN WARD NO. 06
CONSTRUCTION OF CC ROAD AND RCC DRAIN FROM ASHISH CHOUBE HOUSE TO JAIN COACHING AT WARD NO. 06
TARPAULIN, POLYETHYLENE, 10X10M, 200-300GSM, 25X25M
Inviting Rates Tent Material On Rent for the Financial Year 2026-27 (IIIrd Call)
Procurement of Gulley Sucker Hoses at BPCL, Bina Refinery.
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 5 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 5 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 5 Year
Stable Bleaching Powder for Treatment of Water Intended for Drinking (V3) conforming to IS 1065 (Part 2) (Q3)
Construction work of 500 MT Godown For PACS-Jerai, District-Sagar Under RKVY Scheme.(1st Call)
PROCUREMENT OF HCU RGC LUBE OIL TURBINE SPARES AT
SPL REPAIR TO BLDG NO F-37 AT HAWK HILL UNDER AGE B/R-II OF GE SAUGOR
Fabrication,Surface Preparation (SSPC-SP-10,Painting (1 coat Of F-9 (atthe rate65 75micron) DFT and 1coat of P-6(at the rate40 micron) DFT at Contractors Fabrication shop outside plant premises, including Supply and Transportation of Fabricated Steel
Refrigeration Repairing and Maintenance Tender IIIrd Call
Construction of Aspirational Toilet in Nagar Parishad Barodiyakalan under SBM 2.0
1× 265 TPH Boiler Package Project under BPREP_ VENTILATION SYSTEM
Petrol operated TREE CUTTER
ELGI Make Spare Part Kit IC Model No- RR 20070
FOOD ITEM
SUPPLY AS MR ITEM NO. 01.001 (300-EE-00-2501) MEA Regenerator Condender INCLUDING GST, TRANSPORTATION AS PER MR ITEM NO 03.001 (300-EE-00- 2501) INCLUDING GST, MANDATORY SPARES AS PER MR ITEM NO 04.001 (300-EE-00-2501) INCLUDING ITS TRANSPORATION AND GST
Construction of CC road from Puneet Sharma to Rajkumar Dubey in Gopalganj ward, Sagar- Second Call
Construction of Community Hall at Police Line in Dr Harisingh Gour Ward -Parshad Nidhi
Construction work at three places in Motinagar ward, Sagar- Parshad Nidhi
Construction of CC road from Jain Temple to Dinesh Auto Parts in Moti Nagar ward, Sagar- Parshad Nidhi
Construction of Chabootra in Purvyau ward, Sagar- Prashad Nidhi
Road repair and road construction work from Raman Dubey to Old Police Line and Ganesh Temple in Purvyau Ward, Sagar
Construction of CC road from Pathrol to Pravesh Kori and from Khemchandra Kori to Saurabh Sahu in Ballabh Nagar ward, Sagar
Work of covering the drain near Kailash Dham Temple in Tili Ward, Sagar-Parshad Nidhi
Construction of Road near ravishankar School in Rajeev Nagar Ward
Construction of Speed Breaker at 05 Locations in Subedhar Ward
Construction of CC Road from Pramod Kirana to Dayaram Kori in Pantnagar Ward- Parshad Nidhi
C.C. ROAD AND JAL WORK AT 03 PLACES IN NARYAWLI NAKA WARD, SAGAR
Construction of CC Road from Bariya ke Ped to Basant Rajak House and From kainchi Bidi Branch to Mahadev Ji Mandir Campus in Subedaar Ward- Prashad Nidhi
Construction of Boundary wall Fencing and Painting Work at Community Hall in Baghraj Ward
Construction of CC Road In Kumhar Gali in Itwari Ward - Parshad Nidhi
Construction of a CC road from Upadhyays house to K.P. Jain and Santosh Vishwakarma to Stationery in Ahmed Nagar,Vrindavan Ward, Sagar
Construction of public room in Gulab Colony in Shivaji Nagar ward, Sagar
Construction of Public room in Gopalganj Ward-Parshad Nidhi
Construction of CC Road RCC Drain and Half Round Drain at Various Location in ShaniChiri Ward- Parshad Nidhi
Construction of CC Road at various places in Subedhar Ward
Construction of RCC drain and CC road in Vaishali Nagar in Shivaji Nagar ward, Sagar
Road and drain construction work from Bhole to Dharam Mandir and from Dharam to Killu in Kakaganj ward, Sagar- Parshad Nidhi