Loading…
Loading…
3,503 results • Recent activity
Fabrication, supply, erection and commissioning of FRP Horizontal bulk acid storage tank etc
MTPS I BM Unit III Boiler Pressure parts AOH 2025 Removal and refixing of Skin casing sheet and insulation for attending boiler 1st pass water wall tubes etc
MTPS I BM Unit I Removal of deteriorated and dislodged insulation and re insulation on the Portion of ID fan 1A outlet and portion of Horizontal duct side portion for ID fans outlet to chimney and other related works
MTPS I BM Unit II AOH 2025 26 Flue Gas duct A and B sides Patch up works and other repair works between APH out let to ESP inlet
MTPSI TM Unit II Annual Overhauling and gasket renewing of Valves in Feed Water Main Condensate and Extraction Steam lines in Unit II during Annual Overhauling 2025 26
Procurement of IBD drain line pipe