Loading…
Loading…
79 live38 closing this weekmost from East Central Railway and Urban Development and Housing Department
79 results • Latest
Atomic Absorption Spectrophotometer (AAS) (Q3)
A.OHE work in connection with "Sitamarhi(SMI)-Raxaul(RXL) Section- ADX Yd.- TRR(P) in passenger running loops of Adapur Yard Line No- 04 by 60 Kg new rails = 0.9 Tkm".B.OHE work in connection with "RGH Yd. -CTR(P) in passenger running loops of Ramgarhwa Yard (RGH) Line No- 01 by 60 kg (1175 HT) rail on 60 kg PSC sleeper - 0.9 Tkm".C.OHE modification work in connection with "Raxaul Yd. -CTR(S) in passenger running loops of Raxaul Yard (RXL) Line No- 06 by 60 kg (SH) rail with 60 kg (SH) PSC sleeper = 0.800 Tkm".D.OHE work in connection with "Sitamarhi(SMI)-Raxaul(RXL) Section- ADX Yd.-TRR(P) in passenger running loops of Adapur Yard Line No- 03 by 60 Kg new rails = 1 Tkm".E.OHE work in connection with "RGH Yd. -CTR(P) in passenger running loops of Ramgarhwa Yard (RGH) Line No- 03 by 60 kg (1175 HT) rail on 60 kg PSC sleeper(density 1660) = 1.1 Tkm".F.OHE modification work in connection with "Raxaul Yd. -CTR(S) in passenger running loops of Raxaul Yard (RXL) Line No- 07 by 60 kg (SH) rail with 60 kg (SH) PSC sleeper = 0.800 Tkm".G.OHE work in connection with "Sagauli (SGL) - Raxaul (RXL) Section- RGH Yd.- TTR(FS+TWS+CMSC) with 60 kg sleepers, 1 in 12 thick web switch & CMS crossing = Total 04 sets.".H.OHE work in connection with "Sitamarhi(SMI)-Raxaul(RXL) Section- ADX Yd.-TRR(P) in passenger running loops of Adapur Yard Line No- 01 by 60 Kg new rails = 1 Tkm".I.OHE work in connection with "Bairgania-Raxaul (SL) TRR (P)- Total- 36.990 Tkm".J.OHE work in connection with Sitamarhi - Raxaul - TTR(TWS+CMSC) - 35 sets (1:12) of Samastipur Division.
3-D Scanning of river bed of Bridge no. 50, 51 & 47 in MNE-SHC section, Br.No. 89 in SMI-RXL section and Br No-10 in NMA-SRGR section under SSE/BR/SPJ of SPJ Division under Dy. CE/BRL/HJP .
Dismantling of dilapidated washable apron of PF No 1 & 2 at NKE and PF No 1 & 2 at RXL and converting the track into ballasted deck.
Annual Maintenance contract for maintenance of Medha make Microprocessor based control system (Medha Model MEP 660) fitted on ALCO locomotives of Loco Shed, SPJ" for a period of 02 year with OEM on single tender basis.
Repair/Reconditioning of 7775 KVA Transformer for 3-Ph electric Loco, Qty 1 No.sanctioned under BULK RSP 2025-26.
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 km x 320 hours; Outstation 24*7
Custom Bid for Services - Fire Safety Audit and Design & Development of Emergency Evacuation Training at 23 different locations of SPJ Divisions Similar Category Operation And Maintenance Of Fire Fighting System
Malathion 50% Emulsifiable Concentrates (V3) Conforming To IS 2567 (Q2) ( ( 3 3 ))
Optical bench for laboratory, Electronics Engg., Electrical Engg. & Physics Lab Equipments List
Comprehensive Annual Maintenance Contract of Data logger with FEP,FAS,COA,Server,CMU, SSI, 5 KVA UPS and SSBPAC(D) (M/s Efftronics make) in Samastipur Division of E.C. Railway for three years.
A.OHE modification work in connection with "TEMPORARY SHIFTING OF L-XING IN CONNECTION WITH CONSTRUCTION OF ROB IN LIEU OF L.C. NO.-2'SPL' CLASS AT KM- 39/9-40/0 (FROM SPJ), KM-2.260 (FROM DBG) BETWEEN DARBHANGA - SHISHO STATION IN DBG - SMI SECTION."B.OHE modification work in connection with "TEMPORARY SHIFTING OF L-XING IN CONNECTION WITH CONSTRUCTION OF ROB IN LIEU OF L.C.NO.-18'SPL' CLASS AT KM-30/9-31/0 BETWEEN THALWARA- LAHERIASARAI STATION IN SPJ-DBG SECTION".
Construction of Over Head Water Tank near the house of Munshi Rai in Ward No. 25 of Nagar Parishad, Mahua.
Construction of Over Head Water Tank near Sahebjan Miya's house in Ward No. 25 of Nagar Parishad, Mahua.
Construction of Over Head Water Tank near the land of Fakira Rai in Ward No. 24 of Nagar Parishad, Mahua.
Construction of Over Head Water Tank near Girls School in Ward No. 20 of Nagar Parishad, Mahua.
Construction of Over Head Water Tank near the house of Mithlesh Singh in Ward No. 19 of Nagar Parishad, Mahua.
Construction of Over Head Water Tank near Kali Temple in Ward No. 18 of Nagar Parishad, Mahua.
Construction of Over Head Water Tank near Kali Sthan Pappu Singh's house in Ward No. 15 of Nagar Parishad, Mahua.
Construction of Over Head Water Tank near the house of Kumod Ray in Ward No. 15 of Nagar Parishad, Mahua.
Construction of Over Head Water Tank near the house of Umesh Ray in Ward No. 14 of Nagar Parishad, Mahua.
Construction of Over Head Water Tank near the house of Pramod Sah in Ward No. 13 of Nagar Parishad, Mahua.
Construction of Over Head Water Tank near the house of Jitendra singh in Ward No. 03 of Nagar Parishad, Mahua.
Construction of Over Head Water Tank near the house of Sanjeet Rai in Ward No. 01 of Nagar Parishad, Mahua.
CS for FS and Prep. of DPR for improvement to 2 lane with PS from Mishraulia to Bhengari of NH 727B and CS for Prep. of DPR for construction of 4 lane ROB parallel to existing old ROB over Samastipur_Darbhanga railway line at KM 67.000 of NH 322.
STMC work from Km 4 th (Ramnagar) TO Km 28 th ( Bahedi Bazar ) of NH 527E UNDER NH Division Samastipur for the year 2026-27 in the state of Bihar.