Loading…
Loading…
Found 22 active tenders
22 results • Latest
Please Refer as per BOQ
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: . -All kinds of soil.
Please Refer as per BOQ
E/work in Bulk excavation in lead upto 25 mtr lift of 1.5 mtr. By mechanical means 100% AKS
Please Refer as per BOQ
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:
Please Refer as per BOQ
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed for All kind of soil.
Please refer to BOQ
Hand-packing stones in wire-crates of mechanical woven double and twisted , hexagonal wire mesh gabion zinc coated mesh type 100 x120mm mesh wiere dia 2.70mm salvage wire dia 3040mm lacing wire dia 2.20mm ( as per national / international standards crate size 6 x1.2 x1.2mtr including cost of crates and stones with all leads and lifts carriage complete
Please refer to BOQ
Supply and laying of River Bed Materials including leveling, dressing, watering & consolidation in layer 20cm in depth each layer consolidated with power road roller of minimum 8 tonne capacity incl. carriages complete