Loading…
Loading…
240 results • Latest
URGENT REPAIRS TO RC PURAM PS WITH TOILETS REPAIRS, POLICE STATION BUILDING REPAIRS AT RC PURAM PSB OF CYBERABAD COMMISSIONERATE (2nd call)
FLOORING WITH DOUBLE CHARGED / MULTI CHARGED STAIN FREE FULL BODY PORCELAIN VITRIFIED TILES WITH DOUBLE LAYER PIGMENT OF SIZE 600 X 600 MM AND THICKNESS BETWEEN 8-10 MM 1ST QUALITY CONFORMING TO 3711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS, SET OVER BASE COAT OF CEMENT MORTAR (1:8), 12 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE TO FULL DEPTH MIXED WITH PIGMENT OF MATCHING SHADE, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILES ETC., COMPLETE, INCLUDING LIFTING (MANUAL) AND ALL LABOUR CHARGES, ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOR GROUND FLOOR
SUPPLY OF SHAFT FOR BEVEL GEAR, COUPLING SLEEVE,CENTER HELICAL PINION-SUN GEAR AGAINST K6D1Z83156
SHAFT FOR BEVEL GEAR
FLANGES with IBR inspection
FLANGES with IBR inspection
connecting coupling of SENEGAL
CONN COUPLING-VAR 01(BFP/HC)
Supply of Gate Globe and Check Valves
GLOBE VLV SS 1/2" CL 800 SW (NPTC)
Repair Maintenance work of refractory lining of Wesman furnace in 06-Shop in BHEL, HPEP Factory, RC Puram, Hyderabad
Charges for - (i) dismantling of old refractory bricks at all heights and elevations from Furnace walls, Bogie (wagon) etc., disposing the debris within a lead of 2 km within the Factory Area as directed by Engineer-In-Charge. The rate includes hire charges of all machinery, equipment, labour, loading, unloading, transportation etc. (ii) cleaning and recovering possible old bricks and stacking the same for reuse. (iii) Charges for installation of new bricks by applying new “40% High Alumina Refractory Bricks” in Furnace and “Hot Face Insulation Bricks & Cold Face Insulation Bricks” using Thermotex Refractory Mortar and/or Refractory Super Castable, as applicable. The rate includes cost for labour, consumables, cutting, preparing surface neat & clean for installation of new bricks, transportation of bricks and binding material from BHEL stores, loading, unloading, handling, placement and construction to form required size and shape as per site condition etc., all complete as directed by the Engineer-In-Charge. Only Bricks and binding material will be issued free of cost by BHEL at BHEL Stores.