Loading
Loading…
Loading…
2,766 results • Recent activity
6.Construction of CD Work behind Kadigala School gaon odha in Ward No.6 at Jath
5.Construction of RCC Gutter at Dr.Babasaheb Ambedkar udyan near Atul Kamble house in Ward No.4 at Jath
4.Construction of RCC Gutter from Vinod Pathrut house to Atul Kamble house in Ward No.4 at Jath
Laying lines for converting single phase electrical connection to three phase electrical connection at Divisional Office Ward Committee No. 03 Kupwad and wiring for distribution of internal electrical load.
Paint, Air drying, Red Oxide Zinc
3.Construction of RCC Gutter at Yashwant Society in Ward No.1 at Jath