Loading…
Loading…
49 results • Latest
Plastic Chairs For General Purposes conforming to IS 13713 (V3) (Q2) (3 (3 ))
"Re-certification of GreenCo rating System at RWP, Bela for 03 (three) years".
DEMOLITION OF OLD SUPERSTRUCTURE & CONSTRUCTION OF NEW SUPERSTRUCTURE INCLUDING OVERALL MAINTENANCE + PATCH REPAIRING OF ABUTMENT ,PIER & PIER CAP DEMOLITION OF OLD SUPERSTRUICTURE & CONSTRUCTION OF NEW SUPERSTRUCTURE OF H.L RCC BRIDGE OVER DAHA RIVER IN 27TH KM OF CHHAPRA-MANJHI-DARAULI-GUTHNI ROAD IN SARAN DISTRICT.
EXECUTION OF COMPREHENSIVE MAINTENANCE CONTRACT (CMC) INCLUDING REINSTALLATION (IF REQUIRED) AND MISCELLANEOUS WORK FOR TWO (2) YEARS ON SMART SOLAR STREET LIGHT SYSTEM AT SARAN DISTRICTS IN BIHAR UNDER BREDA PROJECT
Metal Beds (V3) (Q2), Modular Table/Meeting Table Centre Table (V2) (Q2), Chair for General Purpose (Q2), Steel Almirah/Cabinets (V4) (Q2) (3 (3 ))
REPAIR AND REPLACEMENT AND MAINT OF INTERNAL WIRING, FITTING, MCCBs SERVICE CABLE AND MISC CONNECTED ITEMS OF RR UNITS AT SARAN AND ARNORA AREA OF 09 SECT UNDER AGE (I) BHALRA (NIT No. 64 of 2026-27)
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2)
Antiwear Hydraulic Oil, Extra Heavy Duty Type (V3) Conforming to IS 11656 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Painting of steel structure and Building of RWP/Bela for protection against erosion and weather and to comply against Factory Act-1948.
Providing fixing turbo ventilator, poly carbonate sheet and solar pipe light at top of roof of plant for improvement of the working space at RWP/Bela.
Restoration and rejuvenation of Pond 1, 2 in main plant and Pond no.3 in staff colony (near KVS) at RWP/Bela
EOI FOR EMPANELMENT OF HOSPITAL FOR SST AND SECONDRY CARE SERVICES FROM CENTRAL AND STATE GOVT./PSU/PUBLIC SECTOR HOSPITALS, PM- JAY CGHS EMPANELLED HOSPITALS/INSTITUTIONS AND PRIVATE HEALTH CARE ORGANIZATIONS (HCOs) IN SARAN DIST OF BIHAR
Annual maintenance charges for already installed Scour monitoring System at two (02) bridges of Br. No.-16 DN in KIR-BJUsection Under SSE/Br./MGR & 78 UP in HJP- CI Section Under SSE/Br./SEE for 3 years under Dy. CE/BRL/HJP.
Inspection of Br. No.-10 UP (15X61.00M OWG) & ROB-23A (1X60.0 M BSG) in KIR- BJU section under SSE/Bridge/MGR and Br.no.-78UP(2X18.3+8x76.2+4x18.3m OWG) & ROB Govindchak (2X60.0M BSG) in HJP-CI Section, ROB-47A (1X56.60 M BSG) in KIR-BJU section & ROB 3 SPL(1X50.0M BSG) in HJP-MFP Section under SSE/Bridge/SEE using high resolution image & video capture UAV/DRONE under SSE/Bridge/SEE of Sonpur Division.
Periodical painting of steel girder Bridge of Bridge no.- 33UP(1X12.20), 33DN(1X12.20), 44UP(2X12.20), 44DN(2X12.20), 62DN(5X12.20) in BJU-SPJ-MFP Section ,14DN(1X12.20), 15 DN(4X12.20), 21 UP(5X12.20), 22 UP(4X12.20), 23 UP(2X12.20) in HJP-MFP Section , 77ADN(2X18.30), 78DN(8X76.20), 78ADN(4X18.30), 78BDN RUB(9X18.30), 78CDN RUB(3X18.30), 6UP(6X12.20), 6DN(6X12.20), 10UP(6X12.20), 15DN(6X12.20), 16UP(8X12.20), 16DN(8X12.20) in HJP-CI Section , 11DN(3X18.30) in BCA-HJP Section , ROB NO-21ROB (1X12.20+2X7.925), 25 ROB (1X12.20+2X7.925) in KIR-BJU Section , 1B ROB (1X12.80+2X7.925) in BJU-SPJ Section, ROB 3SPL (1X50), ROB 7SPL (2X8.53+1X13.4), 47SPL(2x35.76+1x33.96), ROB 19C (OLD)(2X12.5+1X21+1X19) in MFP-HJP Section under SSE/Br./SEE in Sonpur Division under Dy.CE/BRL/HJP.
(i) Hajipur - Muzaffarpur (UP) - TBR -8.055 Tkm. (ii) BCA-SPJ-TRR(P)-8.665 Tkm. (iii) BJU-BCA-TTR (FS+TWS+CMSC) - 37 sets & TTR (FS+TWS+CMSC)- 19 sets, (TWS + WCMSC) -5 sets, (TWS+CMSC) - 5sets, TWSEJ-156 sets & Glued joint - 04 nos.
Yard improvement and upgradation work at DSS,BCA, and BJU yard under ADEN/West/BJU in connection with "(I) Yard improvement and upgradation work of Passenger running lines other than main line at station BJU,BCA,DSS,RD & SAI under Sr.DEN/III/SEE & (II) Yard improvement and upgradation work of Non- passenger running lines at station BJU,DSS,RD & SAI under Sr. DEN/III/SEE."
Yard improvement and upgradation work at RD and SAI under ADEN/South/MFP in connection with "(I) Yard improvement and upgradation work of passenger running lines other than main line at station BJU, BCA, DSS, RD & SAI under Sr. DEN/III/SEE & (II) Yard improvement and upgradation work of Non-passenger running lines at station BJU, DSS, RD & SAI under Sr. DEN/III/SEE."
(I) Drainage system rectification measures at RUB No. 130 & 132 with CCTV, W.L. indicator, road signages board & speed breaker between GWH-DEIA section. (II) Drainage system rectification measures at RUB No. 140 & 144 with CCTV, W.L. Indicator, road signages board & speed breaker between GWH-DIEA section. (III) Drainage system rectification measures at RUB No. 153 & 156 with CCTV, W.L. indicator, road signages board & speed breaker between GWH-DEIA section & (IV) Drainage system rectification measures at RUB No. 163 & 166 with CCTV, W.L. indicator, road signages board & Speed breaker between GWH-DEIA section.
Provision of RCC box in lieu of RCC pipe/EWP pipe of 5 bridges (Br. No. 07, 08, 12, 13 & 17) in connection with "Provision of RCC box in lieu of RCC pipe/EWP pipe of 7 bridges (Br. No. 03 KM-51/14 b/w MFP-RD, Br. No. 03A KM-51/10-11 b/w MFP-RD, Br. No. 07 KM - 47/6-7 b/w MFP-RD, Br. No. 08 KM - 46/12-13 b/w RD-TUR, Br. No. 12 KM - 44/4-5 b/w RD-TUR, Br. No. 13 KM- 43/9-10 b/w RD-TUR, Br. No. 17 KM- 41/3-4 b/w RD-TUR) in MFP-TUR section."
At Sonpur :- Improvement of Colony road in Pahari chak Colony and Barbatta Colony.
Construction of Store Building with boundary wall, Gate, store rooms G+01 & shed of allotted land in Hajipur Station (west side) for Kavach and LTE work over ECR.
Provision of Limited height sub-way in lieu of LC No. 10F between NYO-STLR section.
(1) provision of Limited height sub-way in lieu of LC No. 04 between BCA-VPDA (2) Provision of Limited height sub-way in lieu of LC No. 08 between BCA-VPDA. (3) Provision of Limited height sub-way in lieu of LC No. 11 between VPDA-MOG. (4) Provision of Limited height sub-way in lieu of LC No. 21 between NNNL-SPP.
Provision of Limited height sub-way at trespassing location Km. 308/28-30 between BAGL-GJH.
High End Desktop Computer (Q2), Entry and Mid Level Desktop Computer (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
At BJU: Construction of staff quarters (12 unit type-II) in north colony, Barauni on replacement of abandoned quarters.
Examination and certification of lifting machine and lifting tackles by competent person authorized by chief inspector of factories Bihar, at RWP/Bela.
Potable Water Purification System DE - Ionization Based (Q3) (3 (3 ))
Comprehensive revamping, repair with spares & thorough overhauling of Thermax make water softening plant and water filtration plant & installation of complete agitator system for preparation of brine solution at RWP/Bela as per scope of work.
Proposal for Installation of CCTV camera for security surveillance of 11 BN/RPSF /GHZ
Interactive Panels with CPU (Q2) (3 (3 ))
Supply, Installation, Testing and Commissioning of GePON Network System at GHZ alongwith replacement/provision of various Telecom equipments for enhancing reliability/availability of telecom infrastructure at all stations under Sonpur Division.
Comprehensive Annual Maintenance Contract of Digital Axle Counter (M/s G.G.Tronics make) in SEE division of EC railway for 18 months with OEM/authorised dealer of OEM.
Baragopal Yard remodeling work for removal of operational constraints at BAGL station.
Provision of bonds in lieu of Sonpur Division -TTR 60 kg 1 in 12 (FS+TWS+WCMSC)- 87 Sets & TTR (TWS+WCMSC)-6 SETS, TBSR (H-Beam)-450 Nos.& Glued joints -176 Nos.
Modification of OHE lieu of (i) Provision of RUB in lieu of LC No -03 b/w HUFP-LLJP at KM 11/210, (ii)Provision of RUB in lieu of LC No -16 b/w LLJP-VSHI at 32/4-6. , (iii) Provision of RUB in lieu of LC No -12 C b/w LLJP-VSHI at KM 23.856, (iv) Provision of RUB in lieu of LC No -10 b/w LLJP-VSHI at KM 21.361 , (v) Provision of RUB in lieu of LC No -13C b/w LLJP-VSHI at KM 24.707.
Modification of OHE in lieu of (i) Provision of RUB in lieu of LC No -9C b/w GTHT-LLJP at KM 19.123, (ii) Provision of Limited height sub-way in lieu of LC No. 23 between DGA-BAGL, (iii) Provision of Limited height sub-way in lieu of LC No. 5 between PMU-SEE, (iv) Provision of Limited height sub-way in lieu of LC No. 04 between BCA-VPDA (v) Provision of RUB in lieu of LC No -18 b/w KHI-GRL at KM 32.965
Modification of OHE lieu of (i) Provision of RUB in lieu of LC No -7B b/w VPDA-BCA at KM 204.464, (ii) Provision of RUB in lieu of LC No -13C b/w MOG-VPDA at KM 213.627,(iii) Provision of Limited height sub-way in lieu of LC No. 01 between BCA- VPDA, (iv)Provision of Limited height sub-way in lieu of LC No. 44 between CSR- AYRN,(v) Provision of Limited height sub-way in lieu of LC No. 02 between BCA- VPDA.
Electrical work for CHI office, CHI Store, Ambulance driver room, Laundry room, Kitchen in Polyclinic area at RWP, Bela
Monthly Basis Cab & Taxi Hiring Services - MUV; 2500 KM x 720 Hours; Outstation 24*7
Maintenance of Fire Extinguisher at sonpur division for a period of Three years.
At Hajipur:- Provision of Facade lighting at GM building Hajipur.
Strengthening of IT Infrastructure, Data Centre and Network architecture at Rail Wheel Plant, Bela, Dist-Saran, Bihar.
Laying of PE Pipeline Network, Last Mile Connectivity (LMC) and DMA works for PNG connections in the geographical area of Muzaffarpur, Vaishali, Saran and Samastipur District of Bihar (Muzaffarpur GA)
Goods Transportation service - Monthly Based Service - Outside city within state; P Way and Railway Materials; Open Body Taurus, Goods Transportation service - Monthly Based Service - Outside city within state; P Way and Railway Materials; Pickup Truck
CONSTRUCTION OF 720 BEDDED Dr. BHIM RAO AMBEDKAR SC/ST RESIDENTIAL SCHOOL (10+2) AT RAMCHAK CHAPRA (SARAN).