Loading…
Loading…
125 live40 closing this weekmost from Directorate Urban Administration and Development and PWD- Roads and Bridges
125 results • Latest
SUPPLY OF SOOKHI EVAM JALAU LAKDI FOR ALAW FOR SHEEKALEEM HRITU
Supply of chemicals and Filter media for Water purification in water treatment plant Nagar Nigam Satna
Restoration work of Road and bridges During the rain and after rains under the Maintance of Section Ramnagar Sub Division Amarpatan
Restoration work of Road and bridges During the rain and after rains under the Maintance of Section Amarpatan Sub Division Amarpatan
White washing, Colour washing and Panting Works in Govt. Residential Building under Sub Division Nagod
Restoration work of Road and bridges During the rain and after rains under the Maintance of Section Rampur Baghelan Sub Division Satna
Strengthning of Mahurach Bhatiya Khari Tapa Road Length 6.39 km, under Sub Division Satna
Strengthning of Unchehra Parasmaniya Dureha Road Length 5.00 km, under Sub Division Nagod
Strengthning of Salaiya Kachnar Road Length 5.20 km, under Sub Division Nagod
Strengthning of Babupur Nimi Baraj Road Length 4.20 km, under Sub Division Satna
Strengthening works on Naina Road to Rajha Tola Approach Road Length 3.50 km, under Sub Division Nagod.
Strengthning of Dureha Kapuri Bamurhiya MadhaTola Gangwariya Amsil Dharampuri Road Length 4.00 km, under Sub Division Nagod
Strengthning of Singhpur Hadhkhar Road Length 4.20 km, under Sub Division Nagod.
Strengthening works on Madhi Nauniya Paraswara Road Length 4.15 km, under Sub Division Nagod
Strengthening works on Internal and External Road of Ramvan Length 2.25 km, under Sub Division Satna
Strengthening works on Bhulni Approach Road Length 2.30 km, under Sub Division Nagod.
Strengthening works on Semri Approach Road Length 1.20 km, under Sub Division Nagod.
Strengthning of Jail Approach Road Length 0.90 km, under Sub Division Satna
Strengthening works on Rajha Approach Road Length 4.15 km, under Sub Division Nagod
Enquiry for supply of plastic chairs and tables at 2x10 MW,BHPS-IV, MPPGCL, Jhinna, Distt.-Rewa (M.P).
Floor repair work of water cave at tourist centre Gupt Godavari.
OLD THANA NEW BUILDING SHOPPING COMPLEX FIRST FLOOR SHOP NO 63 BLOCK(B) SC (RESERVED)
OLD THANA NEW BUILDING SHOPPING COMPLEX FIRST FLOOR SHOP NO 66 BLOCK(B) DOUBLE SHUTTER SC (RESERVED)
OLD THANA NEW BUILDING SHOPPING COMPLEX FIRST FLOOR SHOP NO 87 BLOCK(C) SC (RESERVED)
OLD THANA NEW BUILDING SHOPPING COMPLEX FIRST FLOOR SHOP NO 91 BLOCK(C) SC (RESERVED)
OLD THANA NEW BUILDING SHOPPING COMPLEX FIRST FLOOR SHOP NO 41 BLOCK(A) SC (RESERVED)
OLD THANA NEW BUILDING SHOPPING COMPLEX FIRST FLOOR SHOP NO 98 BLOCK(C) ST (RESERVED)
OLD THANA NEW BUILDING SHOPPING COMPLEX FIRST FLOOR SHOP NO 90 BLOCK(C) WIDOW WOMAN (UNRESERVED)
OLD THANA NEW BUILDING SHOPPING COMPLEX FIRST FLOOR SHOP NO 26 GEN (UNRESERVED)
OLD THANA NEW BUILDING SHOPPING COMPLEX FIRST FLOOR SHOP NO 38 BLOCK(A) SC (RESERVED)
OLD THANA NEW BUILDING SHOPPING COMPLEX GROUND FLOOR SHOP NO 75 DOUBLE SHUTTER GEN (UNRESERVED)
OLD THANA NEW BUILDING SHOPPING COMPLEX GROUND FLOOR SHOP NO 73 GEN (UNRESERVED)
OLD THANA NEW BUILDING SHOPPING COMPLEX GROUND FLOOR SHOP NO 74 SC (RESERVED)
OLD THANA NEW BUILDING SHOPPING COMPLEX GROUND FLOOR SHOP NO 60 DOUBLE SHUTTER SC (RESERVED)
OLD THANA NEW BUILDING SHOPPING COMPLEX GROUND FLOOR SHOP NO 69 SC (RESERVED)
OLD THANA NEW BUILDING SHOPPING COMPLEX GROUND FLOOR SHOP NO 72 WIDOW FEMALE (UNRESERVED)
OLD THANA NEW BUILDING SHOPPING COMPLEX GROUND FLOOR SHOP NO 51 S.C (RESERVED)
OLD THANA NEW BUILDING SHOPPING COMPLEX GROUND FLOOR SHOP NO 59 GEN (UNRESERVED)
OLD THANA NEW BUILDING SHOPPING COMPLEX GROUND FLOOR SHOP NO 58 HANDICAPED (RESERVED)
OLD THANA NEW BUILDING SHOPPING COMPLEX GROUND FLOOR SHOP NO 57 S.C (RESERVED)
OLD THANA NEW BUILDING SHOPPING COMPLEX GROUND FLOOR SHOP NO 18 S.T ( FEMALE RESERVED
Ward No 05 Work involving the reduction of boundary wall heights and the installation of iron grilles for three parks in the Housing Board Colony
Ward No 06 Construction of a tin shed adjacent to the Chandi Devi Temple complex
Ward No 20 Construction of roads and culverts at various locations in the new settlement Navin Basti opposite the Fish Market
Ward No 21 Construction of CC roads RCC drains and culverts at various locations in Vallabh Nagar specifically in the areas spanning from Ramesh Parauha residence to Pooja Dwivedi Aarti Kushwaha to Lalman Gautam and Ramayan Dwivedi to Shrikant Chatur
Oxygen, Compressed Gas and Liquid (V3) Conforming to IS 309 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Various Construction of 1 no. 220 kV and 1 no. 132 KV feeder bay alongwith Transformer Foundation for Addl. 200 MVA 220/132 kV Transformer at 220 kV S/s Birsinghpur.
Construction of Approach Road from main road to hill top including, Retaining Wall, Culvert, Drainage and External Electrification Works at near civil court Chitrakoot district Satna
Empanelment of Consultants and Architects / firm for the below mentioned categories and groups