Loading…
Loading…
762 results • Latest
10- Vitiya varsh 2026-27 mai Zila Panchayat Shamli ke Swamitav wali Sadak Rajhad se Kail tak lepan ka karya
09- Vitiya varsh 2026-27 mai Zila Panchayat Shamli ke Swamitav wali Sadak Barlajatt- Shamli marg se Purv SP office ki aor lepan ka karya
08- Vitiya varsh 2026-27 mai Zila Panchayat Shamli ke Swamitav wali Sadak Jharkhedi me kairana Titarwada marg Se Goga Mahadi tak road par lepan ka karya
07- Vitiya varsh 2026-27 mai Zila Panchayat Shamli ke Swamitav wali Sadak Gram Baneda Jatt Se Mundbhar ki aorLepan karya.
06- Vitiya varsh 2026-27 mai Zila Panchayat Shamli ke Swamitav wali Sadak Gram Butrada- Hathi karoda marg Madarse se Khanpur Road tak Lepan karya.
05- Vitiya varsh 2026-27 mai Zila Panchayat Shamli ke block Unn Mai Lepan margo ki Pench Marammat karya.
04- Vitiya varsh 2026-27 mai Zila Panchayat Shamli ke block Kairana Mai Lepan margo ki Pench Marammat karya.
03- Vitiya varsh 2026-27 mai Zila Panchayat Shamli ke block Thanabhawan Mai Lepan margo ki Pench Marammat karya.
02- Vitiya varsh 2026-27 mai Zila Panchayat Shamli ke block Kandhla Mai Lepan margo ki Pench Marammat karya.
01- Vitiya varsh 2026-27 mai ZIla Panchayat Shamli ke block Shamli Mai Lepan margo ki Pench Marammat karya.
Catering service (Duration Based) - VEG & N/VEG; B/FAST, LUCNH & DINNER; Special Buffet
New construction work at Main link road connecting village Goharpur to Kudana in Distt Shamli in FY 2026 27
New construction work at SDM residence in Banat town to the road leading to Sikka in Distt Shamli in FY 2026 27
New construction work at Fatehpur to Gujjarpur road in Distt Shamli in FY 2026-27
New construction work at Hathi Karoda to Talwa Majra via the field of Rampal son of Jaychand in Distt Shamli in FY 2026 27
New construction work at Nasir Vakils house to the road near Ajmus tube well in Distt Shamli in FY 2026 27
12- SILT CLEANING WORK ON THE KHANDRAVALI RAJWAHA FROM KM 0.000 TO KM 42.638.
08-Road renovation work on the Malipur distributary from km 3.365 to km 4.017.
06- Road renovation work on the Goharni distributary from km 3.424 to km 4.684.
20. Pothole repair work on the Gaidbara Road between km 0.000 and km 2.500.
09. Pothole repair work on the Malipur Road between km 1.585 and km 3.465 and between km 4.030 and km 9.500.
06. Pothole repair work on the Eastern Yamuna Canal between km 112.756 and km 115.200.
04. Pothole repair work on the Loi Escape between km 0.000 and km 3.000.
13. Pothole repair work on the Khandravali Road between km 6.900 and km 8.900.
PVC Socket 160 mm dia (Fabricated 4kg/cm2 class-II), PVC Socket 200 mm dia (Fabricated 4kg/cm2 class-II), PVC Tee 160X160X160 mm dia (Injection moulded 4kg/cm2 class-II 6kg/cm2 class-II & class-III), PVC Tee 200X160X200mm dia (Fabricated 4kg/cm2 class-II), PVC Tee 160X200X160mm dia (Fabricated 4kg/cm2 class-II), PVC Tee 200X200X200mm dia (Fabricated 4kg/cm2 class-II), PVC Bend 160 mm dia X45° (Fabricated/Moulded 4kg/cm2 class- II), PVC Bend 160 mm dia X60° (Fabricated/Moulded 4kg/cm2 class-II), PVC Bend 160 mm dia X90° (Fabricated Moulded 4kg/cm2 class-II), PVC Bend 200 mm dia X45° (Fabricated/Moulded 4kg/cm2 class-II), PVC Bend 200 mm dia X60° (Fabricated/Moulded 4kg/cm2 class-II), PVC Bend 200 mm dia X90° (Fabricated/Moulded 4kg/cm2 class-II), PVC Reducer 200X160 mm dia (Fabricated 4kg/cm2 class-II), PVC End Cap 160mm dia (Injection Moulded 6kg/cm2 class-III), PVC End Cap 200mm dia (Injection Moulded 6kg/cm2 class-III), PVC FTP with Flange 160mm dia (Fabricated 4kg/cm2 class-II), PVC FTP with Flange 200mm dia (Fabricated 4kg/cm2 class-II), Solvent Cement, Two Way uPVC Outlet Valve
01- SILT CLEARANCE OF KALLARPUR DY. FROM KM. 0.000 TO KM. 40.230
11. Pothole repair work on the Daugarol Road between km 0.000 and km 1.400.
LED Luminaire For Road And Street Lights Conforming To IS
03. Pothole repair work on the Loi Road between km 17.000 and km 21.280.
17. Pothole repair work on the Kurthal Road between km 5.000 and km 11.000.
CONSTRUCTION OF A HEALTH SUB-CENTRE BUILDING IN KADARGARH VILLAGE THANABHAWAN BLOCK SHAMLI DISTRICT
05- JANPAD SHAMLI KE BLOCK KAIRANA KE GRAM RAMDA MEIN SWASTHYA UPKENDRA BHAVAN KA NIRMAN KARYA.
04- JANPAD SHAMLI KE BLOCK UN KE GRAM KHEDIKHUSHNAM MEIN SWASTHYA UPKENDRA BHAVAN KA NIRMAN KARYA.
03- JANPAD SHAMLI KE BLOCK UN KE GRAM BHOGEEMAJRA MEIN SWASTHYA UPKENDRA BHAVAN KA NIRMAN KARYA.
02-JANPAD SHAMLI KE BLOCK THANABHAVAN KE GRAM CADY MEIN SWASTHYA UPKENDRA BHAVAN KA NIRMAN KARYA.
01- JANPAD SHAMLI KE BLOCK KANDHLA KE GRAM BHABHISA MEIN SWASTHYA UPKENDRA BHAVAN KA NIRMAN KARYA.
Supply/installation of 150 LPH RO water coolers at 16 different locations in Shamli district.
Supply/installation of 150 LPH RO water coolers at 16 different locations in Shamli district.
Unplsticized PVC Pipes for Water Supply conforming to IS 4985 (Q3) (3 (3 ))
New construction work at Silver Bells Public School on the Shamli Kairana road to the Delhi Saharanpur road in Distt Shamli in FY 2026 27
LED Luminaire For Road And Street Lights Conforming To IS
New construction work at Bantikheda from Meer Singhs house to the Power House Road near Inam Khans tube well in Distt Shamli in FY 2026 27
New construction work at Bharsi canal to Kaniyan in Distt Shamli in FY 2026 27
New construction work at Bhabhisa road in village Makhmoolpur in Distt Shamli in FY 2026 27
New construction work at Kashyap Chaupal in village Lisadh to Sarnawali road in Distt Shamli in FY 2026 27
Non-Aadhaar Based Biometric Attendance System (Q2)
New construction work at Taprana Jhinjhana route from Taprana Eidgah to Laprana Dhanauri Tilla in Distt Shamli in FY 2026 27
New construction work at Suresh Pradhans field in Lisadh to Meerut Karnal ITI in Distt Shamli in FY 2026 27
New construction work at Krishna River in village Sunna in Distt. Shamli in FY 2026 27
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - SUB-STATION; Power House Equipment; Service Provider